Appendix A – Event Reporting Template
Instructions
Within 24 hours of the event:
Submit Part A (Notification) if:
(1)The event meets one of the Categories in AppendixB of the ERO Event Analysis Process, and
(2)Other means of notification of the event have not been submitted as required by OE-417, EOP-004, ES-ISAC, DOE, CIP, etc.
Such Notifications shall be submitted to the appropriate Event Analysis contact at NERC () and the respective Regional Entity.
Reported Event: Provide a title that will be used to further identify the event. The title should include the date of the event (e.g. YYYYMMDD, Entity name, substation name)
Within five business days of the event:
Submit Part B (Brief Report) using the previously submitted Part A (with any updates as needed) to the respective Regional Entity. The Regional Entity will collaborate with the registered entity to provide a Brief Report within ten (10) business days of the event to NERC.
The business day count starts on the next business day after the event.
Submittal Date: Should be updated with every Brief Report update.
Brief Description (3): It is expected that a Notification submittal will be shorter than a Brief Report submittal.
Questions 6 -11: If the event did involve generation, frequency, transmission facilities, and/or load question (6 – 11), may be left blank.
Generation Tripped Off-line (6): Provide a total MW loss and the names of the units that tripped off-line due to the event.
Restoration Time (11): Provide the times that affected transmission, generation, and/or were restored.
Sequence of Events (12): The sequence of events should provide a timeline of the events that took place leading up to and through the event.
Narrative (15): This section should expand on the brief description that was submitted in Part A, providing more detail as needed to more clearly describe the event.
Reporting Template
Part A (Notification)
(To be submitted to the Regional Entity and NERC within 24 hours of event – if not provided by other means as described in the instructions)
Reported Event:
Region:
Submittal Date:
- Entity Name:
- Date and Start Time of Disturbance:
- Date:
- Time: (24-hour format)
- Time Zone
- Brief description of event:
Part B (Brief Report)
(To be submitted to the Regional Entity within five business days of event.)
Status (initial, interim, final):
- Proposed Event Categorization (e.g. 1a, 2b, 3c):
- Name of Contact Person:
- E-mail Address:
- Telephone Number (xxx-xxx-xxxx):
- Generation Tripped Off-line
MW Total:
List Units Tripped:
- Frequency
- Just prior to disturbance (Hz):
- Immediately following disturbance (Hz MAX):
- Immediately following disturbance (Hz MIN):
- List transmission facilities (lines, transformers, buses, etc.) tripped and lockedout. (Specify voltage level of each facility listed and extent of equipment damage, if any.)
- Demand Interrupted (MW):Firm: Interruptible:
- Number of Affected Customers:Firm: Interruptible:
- Restoration Time from Time of Event (24-hour format)
- Transmission:
- Generation:
- Demand:
- Sequence of Events:
- Identify contributing causes of the to the extent known:
- Identify any protection system misoperations to the extent known:
- Narrative
- If you supply a one-line diagram, explain that one-line diagram.
- Identify the significance and duration of any monitoring and control events, such as loss of BPS visibility, loss of data links, etc.