** WARNING ** WARNING ** WARNING ** WARNING **

This document is intended for informational purposes only.

Users are cautioned that California Department of Transportation (Department) does not assume any liability or responsibility based on these electronic files or for any defective or incomplete copying, exerpting, scanning, faxing or downloading of the contract documents. As always, for the official paper versions of the bidders packages and non-bidder packages, including addenda write to the California Department of Transportation, Plans and Bid Documents, Room 0200, P.O. Box 942874, Sacramento, CA 94272-0001, telephone (916) 654-4490 or fax (916) 654-7028. Office hours are 7:30 a.m. to 4:15 p.m. When ordering bidder or non-bidder packages it is important that you include a telephone number and fax number, P.O. Box and street address so that you can receive addenda.

STATE OF CALIFORNIA

DEPARTMENT OF TRANSPORTATION

______

NOTICE TO CONTRACTORS

AND

SPECIAL PROVISIONS

FOR CONSTRUCTION ON STATE HIGHWAY IN

ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.2 KM SOUTH OF GREENFIELD DRIVE UNDERCROSSING TO 0.1 KM OF 73/133 SEPARATION

DISTRICT 12, ROUTE 73

______

For Use in Connection with Standard Specifications Dated JULY 1999, Standard Plans Dated JULY 2004, and Labor Surcharge and Equipment Rental Rates.

______

CONTRACT NO. 12-0C9864

12-Ora-73-Var

Federal Aid Project

ACNH-P073(077)E

Bids Open: July 21, 2005
Dated: June 27, 2005

TABLE OF CONTENTS

NOTICE TO CONTRACTORS 1

COPY OF ENGINEER'S ESTIMATE 4

SPECIAL PROVISIONS 8

SECTION 1.SPECIFICATIONS AND PLANS 8

AMENDMENTS TO JULY 1999 STANDARD SPECIFICATIONS 8

SECTION 2.PROPOSAL REQUIREMENTS AND CONDITIONS 73

21.01GENERAL 73

21.015FEDERAL LOBBYING RESTRICTIONS 73

21.02DISADVANTAGED BUSINESS ENTERPRISE (DBE) 74

21.02ADBE GOAL FOR THIS PROJECT 75

21.02BSUBMISSION OF DBE INFORMATION 76

SECTION 3.AWARD AND EXECUTION OF CONTRACT 77

SECTION 4.BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES 78

SECTION 5.GENERAL 78

SECTION 51.MISCELLANEOUS 78

51.01PLANS AND WORKING DRAWINGS 78

51.011EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK 78

51.012DIFFERING SITE CONDITIONS 78

51.013LINES AND GRADES 78

51.015LABORATORY 78

51.017CONTRACT BONDS 79

51.019COST REDUCTION INCENTIVE 79

51.02LABOR NONDISCRIMINATION 79

51.022EXCLUSION OF RETENTION 79

51.023UNSATISFACTORY PROGRESS 79

51.03INTEREST ON PAYMENTS 80

51.04PUBLIC SAFETY 80

51.05TESTING 81

51.06REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES 81

51.07(BLANK) 81

51.075BUY AMERICA REQUIREMENTS 81

51.08SUBCONTRACTOR AND DBE RECORDS 82

51.083DBE CERTIFICATION STATUS 82

51.086PERFORMANCE OF DBE SUBCONTRACTORS AND SUPPLIERS 82

51.09SUBCONTRACTING 83

51.10PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS 83

51.103RECORDS 83

51.11RESPONSIBILITY TO OTHER ENTITIES 84

51.12AREAS FOR CONTRACTOR'S USE 84

51.13PAYMENTS 84

51.14PROJECT INFORMATION 85

5-1.15 INTERNET DAILY EXTRA WORK REPORT 85

51.16HIGHWAY CONSTRUCTION EQUIPMENT 86

51.17RELATIONS WITH CALIFORNIA DEPARTMENT OF FISH AND GAME 86

51.18RELATIONS WITH CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD 86

51.19PROTECTED NESTING BIRDS 87

51.20CULTURAL RESOURCES 87

SECTION 6.(BLANK) 87

SECTION 7.(BLANK) 87

SECTION 8.MATERIALS 87

SECTION 8-1.MISCELLANEOUS 87

81.01SUBSTITUTION OF NONMETRIC MATERIALS AND PRODUCTS 87

81.02PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS 94

81.03SLAG AGGREGATE 100

81.04ENGINEERING FABRICS 100

SECTION 8-2.CONCRETE 100

82.01PORTLAND CEMENT CONCRETE 100

SECTION83.WELDING 101

83.01WELDING 101

GENERAL 101

SECTION 9.(BLANK) 104

SECTION 10.CONSTRUCTION DETAILS 104

SECTION 10-1.GENERAL 104

101.01ORDER OF WORK 104

101.02WATER POLLUTION CONTROL 104

RETENTION OF FUNDS 105

STORM WATER POLLUTION PREVENTION PLAN PREPARATION, APPROVAL AND AMENDMENTS 106

COST BREAK-DOWN 107

SWPPP IMPLEMENTATION 110

MAINTENANCE 111

REPORTING REQUIREMENTS 111

SAMPLING AND ANALYTICAL REQUIREMENTS 112

PAYMENT 113

101.03TEMPORARY CONCRETE WASHOUT FACILITY 114

MATERIALS 114

INSTALLATION 115

MAINTENANCE 116

MEASUREMENT AND PAYMENT 116

101.04TEMPORARY FIBER ROLL 116

MATERIALS 117

INSTALLATION 117

MAINTENANCE 118

MEASUREMENT AND PAYMENT 118

101.05TEMPORARY SILT FENCE 118

MATERIALS 118

INSTALLATION 119

MAINTENANCE 119

MEASUREMENT AND PAYMENT 119

101.06TEMPORARY FENCE (TYPE ESA) 120

MATERIALS 120

INSTALLATION 120

MAINTENANCE 121

MEASUREMENT AND PAYMENT 121

101.07STABILIZED CONSTRUCTION ENTRANCE/EXIT 121

MATERIALS 121

INSTALLATION 122

MAINTENANCE 122

MEASUREMENT AND PAYMENT 122

101.08TEMPORARY DRAINAGE INLET PROTECTION 123

MATERIALS 123

INSTALLATION 124

REMOVAL 125

MAINTENANCE 125

MEASUREMENT 125

PAYMENT 125

10-1.09 SOLID WASTE DISPOSAL AND RECYCLING REPORT 125

101.10PROGRESS SCHEDULE (CRITICAL PATH METHOD) 126

DEFINITIONS 126

GENERAL REQUIREMENTS 126

COMPUTER SOFTWARE 127

NETWORK DIAGRAMS, REPORTS AND DATA 127

BASELINE SCHEDULE 127

UPDATE SCHEDULE 128

FINAL UPDATE SCHEDULE 128

RETENTION 128

PAYMENT 128

101.11DUST CONTROL 128

101.12MOBILIZATION 128

101.13CONSTRUCTION AREA TRAFFIC CONTROL DEVICES 128

101.14CONSTRUCTION AREA SIGNS 129

101.15MAINTAINING TRAFFIC 130

101.16TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE 131

101.17PORTABLE CHANGEABLE MESSAGE SIGN 132

101.18EXISTING HIGHWAY FACILITIES 132

ABANDON CULVERT 132

REMOVE DRAINAGE FACILITY 132

REMOVE ASPHALT CONCRETE OVERSIDE DRAIN 133

REMOVE CHAIN LINK FENCE 133

REMOVE CHAIN LINK GATE 133

REMOVE CONCRETE DITCH 133

REMOVE CONCRETE (MISCELLANEOUS) 133

REMOVE ROCK SLOPE PROTECTION 134

REMOVE COMPOST STORMWATER FILTER STRUCTURE (PORTION) 134

REMOVE COMPOST STORMWATER FILTER ENERGY DISSIPATOR COMPONENTS 135

RECONSTRUCT EMERGENCY SPILLWAY 135

REMOVE MONITORING STATION 135

MODIFY REINFORCED CONCRETE PIPE RISER 136

101.19CLEARING AND GRUBBING 136

101.20EARTHWORK 137

101.21MATERIAL CONTAINING LEAD 137

LEAD COMPLIANCE PLAN 137

101.22CONTROLLED LOW STRENGTH MATERIAL 138

101.23EROSION CONTROL (BLANKET) 138

MATERIALS 139

APPLICATION 139

MEASUREMENT AND PAYMENT 139

101.24MOVE-IN/MOVE-OUT (EROSION CONTROL) 139

101.25EROSION CONTROL (TYPED) 140

MATERIALS 140

APPLICATION 141

MEASUREMENT AND PAYMENT 142

101.26AGGREGATE SUBBASE 142

101.27AGGREGATE BASE 142

101.28LEAN CONCRETE BASE 142

101.29ASPHALT CONCRETE 142

101.30 JOINTED PLAIN CONCRETE PAVEMENT 143

GENERAL 143

MATERIALS 143

PAVEMENT CONCRETE MIX PROPORTIONS 144

MODULUS OF RUPTURE 145

FINAL FINISHING 145

DOWEL PLACEMENT 146

LIQUID JOINT SEALANT INSTALLATION 146

CONSTRUCTING TRANSVERSE CONTACT JOINTS 147

CONSTRUCTING WEAKENED PLANE JOINTS (EARLY ENTRY SAW METHOD) 147

MEASUREMENT AND PAYMENT 147

101.31CONCRETE STRUCTURES 148

MEASUREMENT AND PAYMENT 148

101.32REINFORCEMENT 148

10-1.33BASIN BAFFLE 148

MATERIALS 148

CONSTRUCTION 148

MEASUREMENT 149

PAYMENT 149

101.34ROADSIDE SIGNS 149

101.35PLASTIC PIPE 149

101.36REINFORCED CONCRETE PIPE 149

101.37MISCELLANEOUS FACILITIES 150

MISCELLANEOUS IRON AND STEEL 150

PORTLAND CEMENT CONCRETE 150

PRECAST FLUMES 150

MEASUREMENT AND PAYMENT 151

101.38SAND FILTER SYSTEM 151

EARTHWORK 151

PERMEABLE MATERIAL 151

SAND FILTER MEDIA 151

FILTER FABRIC 152

UNDERDRAIN PIPELINES 152

PAYMENT 152

101.39IMPERMEABLE LINER 152

MATERIALS 153

MEMBRANE LINER 153

CONSTRUCTION 153

MEMBRANE LINER 153

MEASUREMENT AND PAYMENT 153

10-1.40GABIONS (POLYVINYL CHLORIDE COATED) 154

MATERIALS 154

GRADING, EXCAVATION AND BACKFILL 156

CONSTRUCTION 156

ASSEMBLY OF SUCCESSIVE GABION BASKETS (GABION-TO-GABION JOINTS) 157

FILLING WITH ROCK 157

CLOSURE OF LIDS 157

MEASUREMENT 157

PAYMENT 157

101.41MISCELLANEOUS CONCRETE CONSTRUCTION 157

101.42CHAIN LINK FENCE 158

SECTION 11. (BLANK) 158

SECTION 12. (BLANK) 158

SECTION 13. (BLANK) 158

SECTION14 FEDERAL REQUIREMENTS FOR FEDERAL-AID CONSTRUCTION PROJECTS 159

STANDARD PLANS LIST

The Standard Plan sheets applicable to this contract include, but are not limited to those indicated below. The Revised Standard Plans (RSP) and New Standard Plans (NSP) which apply to this contract are included as individual sheets of the project plans.

A10A / Abbreviations
A10B / Symbols
RSP A35A / Portland Cement Concrete Pavement (Undoweled Transverse Joints)
A62D / Excavation and Backfill - Concrete Pipe Culverts
RSP A62DA / Excavation and Backfill - Concrete Pipe Culverts
A62F / Excavation and Backfill - Metal and Plastic Culverts
A85 / Chain Link Fence
A87 / Curbs, Dikes and Driveways
D75B / Pipe Inlets
D77A / Grate Details
D77B / Bicycle Proof Grate Details
D79 / Precast Reinforced Concrete Pipe - Direct Design Method
D87D / Overside Drains
D88 / Construction Loads On Culverts
D93A / Pipe Riser Connections
D93C / Pipe Riser With Debris Rack Cage
D94A / Metal and Plastic Flared End Sections
D97A / Corrugated Metal Pipe Coupling Details No. 1 - Annular Coupling Band Bar and Strap and Angle Connectors
D97B / Corrugated Metal Pipe Coupling Details No. 2 - Hat Band Coupler and Flange Details
D97C / Corrugated Metal Pipe Coupling Details No. 3 - Helical and Universal Couplers
D97D / Corrugated Metal Pipe Coupling Details No. 4 - Hugger Coupling Bands
D97E / Corrugated Metal Pipe Coupling Details No. 5 - Standard Joint
D97F / Corrugated Metal Pipe Coupling Details No. 6 - Positive Joint
D97G / Corrugated Metal Pipe Coupling Details No. 7 - Positive Joints and Downdrains
D97H / Reinforced Concrete Pipe or NonReinforced Concrete Pipe - Standard and Positive Joints
D99B / Edge Drain Outlet and Vent Details
D100A / Gabion Basket Details No. 1
D100B / Gabion Basket Details No. 2
D102 / Underdrains
RSP T2 / Temporary Crash Cushion, Sand Filled (Shoulder Installations)
RSP T11 / Traffic Control System for Lane Closure On Multilane Conventional Highways
RS2 / Roadside Signs - Wood Post, Typical Installation Details No. 2

Contract No. 12-0C9864

XXX

Federal Project with DBE Goals (12-01-99)

DEPARTMENT OF TRANSPORTATION

______

NOTICE TO CONTRACTORS

______

CONTRACT NO. 12-0C9864

12-Ora-73-Var

Sealed proposals for the work shown on the plans entitled:

STATE OF CALIFORNIA; DEPARTMENT OF TRANSPORTATION; PROJECT PLANS FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.2 KM SOUTH OF GREENFIELD DRIVE UNDERCROSSING TO 0.1 KM OF 73/133 SEPARATION

will be received at the Department of Transportation, 3347 Michelson Drive, Suite 100, Irvine, CA 92612-1692, until 2o'clock p.m. on July 21, 2005, at which time they will be publicly opened and read in Room C - 1116 at the same address.

Proposal forms for this work are included in a separate book entitled:

STATE OF CALIFORNIA; DEPARTMENT OF TRANSPORTATION; PROPOSAL AND CONTRACT FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.2 KM SOUTH OF GREENFIELD DRIVE UNDERCROSSING TO 0.1 KM OF 73/133 SEPARATION

General work description: Retrofit compost storm filter system.

This project has a goal of 5 percent disadvantaged business enterprise (DBE) participation.

No prebid meeting is scheduled for this project.

THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991.

Bids are required for the entire work described herein.

At the time this contract is awarded, the Contractor shall possess either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-42.

This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990.

Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest.

Bidder inquiries may be made as follows:

The Department will consider bidder inquiries only when a completed "Bidder Inquiry" form is submitted. A copy of the "Bidder Inquiry" form is available at the Internet address shown below. The bidder inquiry shall include the bidder’s name and telephone number. Submit "Bidder Inquiry" forms to :

Construction Program Duty Senior

3337 Michelson Dr., Ste. 380

Irvine, CA 92612

Fax Number: (949) 724-2141

Tel. Number: (949) 724-2159

To expedite processing, submittal of "Bidder Inquiry" forms via Fax is preferred.

To the extent feasible and at the discretion of the Department, completed "Bidder Inquiry" forms submitted for consideration will be investigated, and responses will be posted on the Internet at:

http://www.dot.ca.gov/hq/esc/oe/project_status/bid_inq.html

The responses to bidders' inquiries, unless incorporated into formal addenda to the contract, are not a part of the contract, and are provided for the bidder’s convenience only. In some instances, the question and answer may represent a summary of the matters discussed rather than a word-for-word recitation. The availability or use of information provided in the responses to bidders' inquiries is not to be construed in any way as a waiver of the provisions of Section 2-1.03 of the Standard Specifications or any other provision of the contract, the plans, Standard Specifications or Special Provisions, nor to excuse the contractor from full compliance with those contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given.

Project plans, special provisions, and proposal forms for bidding this project can only be obtained at the Department of Transportation, Plans and Bid Documents, Room0200, MS#26, Transportation Building, 1120NStreet, Sacramento, California95814, FAX No. (916)6547028, Telephone No. (916)6544490. Use FAX orders to expedite orders for project plans, special provisions and proposal forms. FAX orders must include credit card charge number, card expiration date and authorizing signature. Project plans, special provisions, and proposal forms may be seen at the above Department of Transportation office and at the offices of the District Directors of Transportation at Irvine, Oakland, and the district in which the work is situated. Standard Specifications and Standard Plans are available through the State of California, Department of Transportation, Publications Unit, 1900RoyalOaksDrive, Sacramento, CA95815, Telephone No. (916)4453520.

The successful bidder shall furnish a payment bond and a performance bond.

The Department of Transportation hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation.

The U.S. Department of Transportation (DOT) provides a toll-free "hotline" service to report bid rigging activities. Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., eastern time, Telephone No. 18004249071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report these activities. The "hotline" is part of the DOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.

Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Labor Compliance Office at the offices of the District Director of Transportation for the district in which the work is situated, and available from the California Department of Industrial Relations’ internet web site at: http://www.dir.ca.gov. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are available through the California Department of Transportation's Electronic Project Document Distribution Site on the internet at http://hqidoc1.dot.ca.gov/. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of "Proposal and Contract" books. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.