Supply & Commission new Fire Alarm System for Salalah Regional Office

  1. Scope of Work and vendor responsibilities:
  • Vendor shall be upgrading the old system into latest Gent Vigilon Fire Alarm System in Salalah Regional Office.
  • Vendor shall provide all items (not limited to):

Item / No. / Comments
Gent 2 Loop Addressable Fire Alarm System / 1
Repeater Panel c/w Battery / 1
Mimic Panel / 1
Smoke Detector c/w Base / 30 /
  • Quantity will confirm during site visit

Heat Detectors / 2 /
  • Quantity will confirm during site visit

Break Glass c/w Polycarbonate Cover / 3 /
  • Quantity will confirm during site visit

Bells / 5 /
  • Quantity will confirm during site visit

Fire alarm Cables / 100 metres /
  • Quantity will confirm during site visit.
  • Vendor shall submit options of change entire fire cables or change the defective cables only.

  • Vendor shall provide civil works whenever required (such as fixing main panel in the wall, while removing old panel and fixing new panel).
  • Vendor shall provide all manpower required during the work execution such as supervisors, electrical engineering, technicians, labours and drivers with all their requirements during the project execution period like food, accommodation and transportation.
  • Vendor shall provide all required generaltools, power tools & equipment for the work execution.
  • During work execution, vendor shall replace any damaged or defective fire cables.
  • On completion of the Works/service the vendor shall remove from the site all waste materials and rubbish, temporary buildings and facilities, tools, temporary works, contractor's Equipment and surplus materials without any additional cost.
  1. Warranty:
  • TheVendor should provide 1year’s warranty certificate for the entire system.
  • During warranty period, the vendor shall replace (not to repair) the system or any item failed or breakdown within 72 hours.
  1. HSE:
  • The vendor shall follow all HSE requirements of Oman Gas Company during the work execution.
  • Vendor shall provide detailed method statement covering all the activities for OGC approval prior to commencement of the project.
  • The contractor shall provide all required PPEs to all personnel working in OGC facilities and all shall wear required PPEs while executing the project.
  • Only defect free and certified tools and equipment to be used for execution.
  1. Price Structure:

S/N / Item Description / Qty / Rate RO / Total amount RO
1 / Gent 2 Loop Addressable Fire Alarm System / 1
2 / Repeater Panel c/w Battery / 1
3 / Mimic Panel / 1
4 / Smoke Detector c/w Base / 30
5 / Heat Detectors / 2
6 / Break Glass c/w Polycarbonate Cover / 3
7 / Bells / 5
8
8 / Installation fixing of the Devices like Panel Cancelled with Mimic Panel & Replacing Devices / L/SUM
9 / Testing Programing & Commissioning / L/SUM
Total