Application for Non-Residential Building Permit Procedure

 Applicant completes item 1 – 11 of the Non-Residential Building Permit Application

 Applicant provides a copy of his/her Workers Compensation Certificate or file an Affidavit of Exemption.

 Provide proof of Department of Agriculture plan approval (for food handling).

 Provide three (3) complete sets of building plans and specifications with registered design, professional seal, and signature.

 Applicant to provide an 8 ½ x 11 sheet of paper(s) showing proposed floor plan layout of tenant space drawn to scale or adequate dimensions. Floor plan must show room/space uses, room sized, aisle way sizes, door sizes, counter areas, exits, and fire extinguisher location(s).

 Applicant to submit completed fire prevention survey form.

 The application is received and checked for completeness. The applicant will be notified of incomplete applications.

 The applications will be reviewed for Zoning compliance and Building and Fire Prevention Code compliance.

 Applicant must indicate which 3rd party inspections are required.

 Applicant will be notified of permit issuance, submit applicable fees, and receive permit.

Application for Non-Residential Zoning Approval Procedure

 Applicant completes items 1 – 4 of the non-residential zoning approval application

 Provide two (2) copies of the approved site plan on an 8 ½” x 11” sheet

 Provide two (2) copies of the floor plan layout on an 8 ½” x 11” sheet

 Applicant completes the proposed use narrative on the next page

 Provide the completed fire prevention survey

 The application is received and checked for completeness. The applicant will be notified of incomplete applications.

 The application will be reviewed for Zoning compliance and Building and Fire Prevention Code compliance.

 Applicant will be notified of permit issuance, submit applicable fees. The zoning approval will be issued after passing a site inspection.

TRAFFIC IMPACT FEES ARE REQUIRED TO BE PAID BEFORE A BULDING PERMIT IS ISSUED.

THE CURRENT FEE IS $1,426.08 PER VEHICLE TRIP

Non-Residential Building Permit Application

1.  Location of Property

______

Development Name Street Address Suite # (if applicable)

2.  Description of Building/Structure to be Constructed______

3.  Type of Permit(s) Requested:

(check all that apply)  Building  Plumbing  Mechanical  Demolition

4.  Check One of the Following that Apply:

 New Non-Residential Structure (NEWNRS)  Interior Alterations of existing tenant space (NRSALT)

 Interior Build out of new space (NRSBLD)  Footer/Foundation Only (NRSFO)

5.  Third Party Inspections Required – Check all that apply:

 Soils Bolt Tightening

 Concrete  Electrical

 Welding  Miscellaneous ______

6.  Estimated Cost of Construction $______X .0015 = Review Fee $______

7.  ______8. ______

(Owner Name) (Contractor/Company)

______

(Street Address) (Street Address)

______

(City, State, and Zip Code) (City, State, and Zip Code)

______

(Phone) (Fax) (Phone) (Fax)

9. ______10. Worker’s Compensation Certification Provided with

(Engineer/Architect Name) this Application: ‮ YES  NO

______Applicant is Exempt (No Employees-Exemption Form

(Street Address) Completed with this Application):  YES  NO

______

(City, State, and Zip Code)

______

(Phone) (Fax)

11. I hereby acknowledge the information contained herein is true and correct, and I hereby agree that all applicable provisions of the Zoning and Building Codes shall be complied with.

______

Applicant Signature Date

______

Print Name E-mail Address (optional)

(FOR TOWNSHIP USE ONLY – PLEASE DO NOT WRITE BELOW THIS LINE)

AP # ______

Map & Parcel # ______

Zoning District: ______

Number of Stories: ______NAICS: ______

Desc of Constr Activity: ______

Building Use Classification ______

Total Square Footage: ______

BCAB/ZHB # If Applicable: ______

Construction Type Classification: ______

Floodplain:  Yes  No

Conditions of Issuance______

______

Fees: Building Permit Fee: ______

Occupancy Permit Fee: ______

Road Occupancy Permit Fee: ______

Plan Review Fee: ______

Zoning Approval: ______

Impact Fee: ______

Zoning Fee: ______

Misc. Contribution: ______

Electrical Inspection Fee: ______

Electrical Administration Fee: ______

PA State Administration Fee: $4.00

TOTAL: ______

______

Building Code Official Approval Date

Non-Residential Zoning Approval

8.  Name of Property Owner______Phone # ______

Address______Fax # ______

9.  Name of Applicant/Lessee______Phone # ______

Address______Fax # ______

10.  Name of Business ______Business Address ______

______

11.  Proposed use(s) as per defined in the Zoning Ordinance

______

______

**Application Narrative must be Provided** (included in Non-Residential building package)

I hereby acknowledge the information contained herein is true and correct, and I hereby agree that all applicable provisions of the Zoning and Building Codes shall be complied with.

Applicant-Signature______Date ______

Print Name ______E-mail Address (optional) ______

(FOR TOWNSHIP USE ONLY – PLEASE DO NOT WRITE BELOW THIS LINE)

AP # ______Map & Parcel # ______NAICS ______

Permitted Zoning Use ______Zoning District ______# Employees ______

Fee: $______

______

Code Administrator Approval Date

Proposed Use Application Narrative

Please print all information

Complete the below proposed use narrative and submit with building permit applications.

 Business name ______

 Exact nature of business ______

______

 Days of business ______

 Hours of business operation ______

 Number of employees ______

 Materials/products/supplies used in conjunction with business ______

______

 List hazardous materials used or manufactured (MSDS sheets are required)

______

______

 Does the business-operation require reporting to the U.S. EPA? Yes  No

 Address of business main office ______

______Phone Number ______

 Emergency contact name ______Phone Number______

 Gross square footage of tenant space ______

Fire Prevention Survey

DATE ______

Name of Establishment ______Location ______

Address ______Suite # ______

Business Phone ______

Nature of Business ______

Emergency Contact ______ Key holder ______

(Name)  Occupant (Phone #)

Emergency Contact ______ Key holder ______

(Name)  Occupant (Phone #)

ICC type of Construction ______Roof materials ______

Number of Stories______Number of Floors ______Basement (Yes/No) ______

Length of Building ______Width of Building ______No. of Elevators ______No. of Stairways ______

Use Group ______

Notes to Fire Department ______

______

Fire Protection Equipment:

Automatic Sprinkler System  Full  Partial  None

Number of Risers ______Type of System:  Wet  Dry  Combination

Fire Department Connection (Yes/No) ______Location ______

Standpipes & Hose Cabinets (Yes/No) ______Location ______

Fire Alarm System (Yes/No) ______ Smoke Detectors  Heat Detectors

 Pull Stations  Duct Detectors

Fire Alarm Panel Location Remote Panel ______

Main Panel ______

Facilities with cooking appliances:

Hood provided (Yes/No) ______Automatic Hood suppression provided (Yes/No) ______

Last test date of hood suppression system: ______

Utilities:

Electric ______Panel Location ______

Gas ______Shut off Valve Location ______

Water ______Shut off Valve Location ______

Hazardous Materials Stored/Processed?  Yes  No

Building Placarded?  Yes  No

Explosive Materials?  Yes  No

If yes, what type? ______

Flammable liquids (i.e.: Gal. Above ground) ______

Flammable liquids (i.e.: Gal. Below ground) ______

List of Hazardous Materials”

______Quantity ______

______Quantity ______

______Quantity ______

Provide complete list for additional items. Check here if additional list is provided ٱ

Knox Box provided (yes/no) ______If yes, list location of box ______

FOR TOWNSHIP USE ONLY- PLEASE DO NOT WRITE BELOW THIS LINE

 Site plan provided on 8 ½ x 11 sheet

 Floor plan layout provided on 8 ½ x 11 sheet

 Fire Prevention Survey complete

 MSDS Sheets provided for HAZMAT

 Locations of Knox Box, Fire Alarm panels, sprinkler valves, fire hydrants, etc. on plans.

Permits required: ______

Building Plan Review Requirements

In order to perform a thorough Building Plan Review, the following specifications, drawings and details must be submitted:

Complete signed and sealed architectural plans, structural plans and material specifications of all work.

A site plan including the following information:

1. Size and location of all new construction and all existing structures on the site.

2. Distances from lot lines.

3. Established street grades and proposed finish grades.

Architectural plans and specifications to include:

1. Description of uses and the proposed use group(s) for all portions of the building. The design approach for mixed uses (as applicable).

2. Proposed type of construction of the building.

3. Fully dimensioned drawings to determine areas and building height.

4. Adequate details and dimensions to evaluate means of egress, including occupant loads for each floor, exit arrangement and sizes, corridors, doors, stairs, etc.

5. Exit signs/means of egress lighting, including power supply.

6. Accessibility provisions.

7. Description and details of proposed special occupancies such as a covered mall, high-rise, mezzanine, atrium, public garage, etc.

8. Adequate details to evaluate fire-resistive construction requirements, including data substantiating required ratings.

9. Details of plastic, insulation, and safety glazing installation.

10. Details of required fire protection systems.

Structural plans, specifications, and engineering details to include:

1. Soils report indicating the soil type and recommended allowable bearing pressure and foundation type.

2. Signed and sealed structural design calculations which support the member size on the drawings.

3. Local design load criteria, including frost depth.

4. Earthquake seismic zone/effective peak acceleration coefficient.

5. Details of foundations and superstructure.

6. Provisions for required special inspections.

7. Applicable construction standards and material specifications (i.e.: masonry, concrete, wood, steel, etc.)

Commercial Building Plan Review Procedure

q  Completed building permit application.

q  Completed zoning approval application.

q  Three (3) complete sets of building plans and specifications with all required information for plan review to determine code compliance.

q  All construction documents required for a building permit shall be prepared by a registered design professional consistent with the professional registration laws of the state of Pennsylvania.

q  When the proposed work is minor in nature and has no effect on the structural integrity of an existing building, and is in compliance with all other provisions of this code, plans need not be prepared by a licensed engineer, or registered architect provided such plans are drawn to scale and contain sufficient detail and clarity that the work will be of sound construction and in compliance with the provisions of this code.

q  The permit applicant for a commercial plan review for a new structure shall submit a review fee calculated at .0015 x estimated construction value. This review fee shall be submitted with application. If plans are sent to the ICC for review, the applicant shall also pay the full ICC review fee.

q  Upon receipt of submittal, the Township will perform an administrative review of the submission for completeness.

q  A determination will be made by the Department of Community Development as to whether review of plans will be in-house by the Department or forwarding plans to ICC for review.

q  A commercial plan review is 10 – 15 working days.

q  Review comment letter will be sent to applicant.

q  Permit applicant shall provide written responses, item by item, for review comments and revise plans and specifications to meet code compliance.

q  Applicant shall submit two (2) complete sets of revised plans, specifications and written response to plan review comments.

q  Township may forward new or revised structural calculations to ICC for review if necessary to determine code compliance.

q  If plan review comments are minor in content and require no plan or specification revisions, then the applicant may provide a written response form the plans and specification preparer for the comments.

q  Prior to permit issuance, applicant is required to provide copies of Department of Agriculture for food handling.

q  Once it has been determined by the Township that the plans and specifications are code compliant, the plans and specs are stamped approved and one set of documents for construction are returned to applicant with building permit issuance. These approved plans should be retained on-site as a reference for construction.

Climatic and Geographic Design Criteria

Ground Snow Load / Wind Speed (mph) / Seismic Design Category / Subject to Damage From / Winter Design Category / Ice Shield Under-layment Required / Flood Hazards / Air Freezing Index / Mean Annual Temp
Weathering / Frost Line Depth / Termite / Decay
25 / 90 / A / Severe / 36” / Mod/
Hvy / Slt/
Mod / 0-20 / Yes / FEMA / 1500 or less / 50

Mechanical Plan Review Requirements

In order to perform a thorough Mechanical Plan Review, the following specifications, drawings and details must be submitted:

Complete signed and sealed plans and specifications of all heating, ventilating and air conditioning work.

Labeling criteria of all mechanical equipment.

Heating equipment data including the following information:

1. Equipment capacity (b.t.u.)

2. Controls

3. Appliance layouts showing location, access and clearances.

4. Disconnect switches

5. Indoor and outdoor design temperatures.

Ventilation data, ductwork and equipment including the following:

1. Ventilation schedule indicating the amount of outside air (in c.f.m.) supplied to each room or space.

2. Layout showing outside air intakes.

3. Construction of ducts, including support and sheet metal thickness.

4. Duct lining and insulation materials with flame spread and smoke-developed ratings.

5. Exhaust fan ductwork layout and termination to the outside.

6. Size of louvers and grilles for attic ventilation.

Boiler and water heater equipment and piping details including safety controls and distribution piping layout.

Gas and fuel oil piping layout, material, sizes, and valves.

Combustion air intake quantities and details.

Commercial kitchen exhaust equipment details including hood and fan drawings, details of automatic fire suppression, and clearances.

Chimney and chimney connector or vent and vent connector details and connector gages and clearances.

Mechanical refrigeration equipment data and details.

Solid fuel burning appliance details including incinerator and fireplace drawings and details.

Energy conservation equipment data and details.

Plumbing Plan Review Requirements

In order to perform a thorough Plumbing Plan Review, the following specifications, drawings and details must be submitted:

Complete signed and sealed plans and specifications of all plumbing work.

Plumbing fixture and piping material specifications including identification of the applicable referenced standard.

Note: all changes/installations to plumbing under the floor slab must be approved/inspected by the Sewer & Water Department.