CURRICULAM VITAE
206/2nd floor, zaitoon apartment.cadell road
mahim mumbai 400016
tel.00919821199466/9833524560
E-mail :
MOHD AYUB SHAIKH.
OBJECTIVE : A position with result oriented company that requires an ambitious person where acquired skill and education will be utilized towards continued growth and advancement.
NATIONALITY : INDIAN
MARITAL STATUS : MARRIED.
LANGUAGES : ENGLISH, HINDI, ARABIC AND URDU.
TOTAL EXPERIENCE (ABOARD) :19YRS. IN POWER PLANT AND OIL & GAS ONSHORE FIELD / off- shore platform /refineryvietnam
ACADEMIC QUALIFICATION:
H. S. C. PASS.
DIPLOMA IN ENGINEERING.3 year + practical exprience in electrical control room 15.75 k.v generator breaker close and 400 volt ups system handle ,6 k.v station supply breaker rack out /isolated practical experience, ALL GENERATOR PROTECTION RELAY RESETED TOTAL BLACK OUT GRID FAILURE I HAVE VERY GOOD EXPERIENCE IN EMMERGENCY SITUATION HADLE 6.K.V BLACK START GENERATOR START AND EMMERGENCY SUPPLY, HIGHLY COMBINE CYCLE EXPRIENCE,ESD SYSTEM EMERGENGY TRIP /HRSG/ CLOSE CYCLE/OPEN CYCLE SYSTEM / UTILITY GAS PLANT OPERATION SYSTEM,
TECHNICAL TRAINING :
Training attended for load dispatch Centre, Ruston Gas Turbine, England, U.K. Co in Saudia Arabia, Turbine Model TB. 5000.
Training Attend for dressRand Kongsberg, Norway, for DELTA ELECTRICAL MECHANIC COMPANY IN TABUK, SAUDIA ARABIA GAS TURBINE KG2, KG63.
Traning attended for GEC , ALSTOM EUROPEAN GAS TURBINES BELFORT, FRANCE, IN LAYAH POWER STATION SHARJAH, UAE. COURSE COMPLETED FOR DCS SYSTEM, SCADA, MARK V, & MARK IV SPEED TRONIC. OPERATION AND MECHANICAL AND MAINTAINANCE FOR GAS TURBINE MODEL FRAME VI 40 MW AND FRAME IX 120 MW CAPACITY MACHINES.
TRAINING ATTENDED FOR MINISTRY OF ELECTRICITY AND WATER (KUWAIT) & MINISTRY OF ENERGY (KUWAIT). DCS SYSTEM TYPE CRT & OPS SCREEN TOUCH KEY OPERATION MAKE MITSUBISHI NAGASAKI, JAPAN. THERMAL POWER PLANT 300 X 8. PLANT CAPACITY 2400 MEGA WATTS.
TRAINING ATTENDED FOR DIESEL ENGINE IN KING FAHAD AIRBASE IN TAIF, SAUDI ARABIA OPERATING DIESEL ENGINE PLANT CAPACITY.
TOTAL 40 MW TYPE OF ENGINE S.W.D. 16 TM-410 HOLLAND 6.5 MW
S.W.D. 6 TM-410 HOLLAND 1.5 MW
DEUTZ GERMANY 1.5 MW
GM EMD USA 1.0 MW.
TRAINING ATTENDED IN FUJAIRAH CEMENT FACTORY IN DIBBA PLANT CAPACITY 3500 TPD CEMENT. CAPTIVE POWER PLANT CAPACITY 15 MW. TYPE MAK – CAT 7.5 X 2. 15 MW CONTROL TYPE SEG – MAK. PLC CONTROL . GENERATOR EXHAUST BOILER TYPE. 4 STROKE. HFO TYPE 380 CST. QUALITY. HFO MAINTAIN 110O C TEMP. VISCOSITY 11 MPA.
PRESENLTY WORKING AT ENI GAS BV, LIBYAN BRANCH UNDER THE CONTRACT OF JAPAN GAS CORPORATION AND DIETSMANN HAS WORKING SENIOR POWER PLANT AND UTILITIES OPERATOR OIL AND GAS ON SHORE FIELD.
WORK EXPERIENCE:
SAUDI CONSOLIDATED ELECTRIC CO. (SCECO)
FROM 24.12.1986 TO 17.08.1992.
POSITION :sr, POWER PLANT CONTROL ROOM OPERATOR.
DUTIES AND RESPONSIBILITIES :
DAILY ROUTINE INSPECTION ON POWER PLANT.
DAILY AND HOURLY INSPECTION AND CHECK INSIDE GAS TURBINE COMPARTMENT.
DAILY START/SHUTDOWN ON GAS TURBINES AND OBSERVE ACCORDING TO CHIEF ENGINEER.
SYNCHRONISING THE GAS TURBINE AND PARALLEL LOAD.
BACK SYNCHRONISING WITH GRID.
WEEKLY OCCUR INSPECTION / CHECKING ALL PANEL BOARD AND CABINETS.
CHECK ALL VENTILATION FANS FOR PROPER OPERATION EVERYDAY.
CHECK TURBINE LUBE OIL TANK LEVEL EVERYDAY
BOOST BATTERY CHARGER ONE HOUR EVERY WEEK AND CHANGE TO ANOTHER SET.
CHECK ALL EMERGENCY LIGHTINGS FOR PROPER OPERATION EVERY WEEK.
DRAIN EACH MAIN FUEL TANK FOR ONE MINUTE TWICE A WEEK
WEEKLY INSPECTION ON CHECK UP BATTERY FOR STAND BY GENERATOR AND FILLED HO2 DISTILLED WATER IF REQUIRED.
EVERY HOUR TAKE READING ALL PARAMETER ALL TURBINE CONTROL PANEL.
WEEKLY/ MO NTHLY FUEL CONSUMPTION REPORT SUBMITTED.
FILL IN THE DAILY LOG SHEETS EACH HOUR IN A LEGIBLE WRITING AND REPORT ABNORMILITIES TO SHIFT ENGINEER
CHECK ALL TANKS FARMS FUEL AREA AND TAKE READING.
S.S.O.C. LTD KING FAHAD AIRBASE IN TAIF
FROM 15/04/94 TO 08/02/95
POSITION : CCR& LEAD MAN POWER PLANT OPERATOR.
DUITES AND RESPONSIBILITIES:
I WAS A LEAD MAN IN ABOVE MENTIONED COMPANY AND MY RESPONSIBILITY WAS TO LOOK AFTER EACH AND EVERY OPERATOR AND THINK OF POWER PLANT DURING MY SHIFT.
AS THE LOAD WAS HIGH I INSTRUCT MY OPERATOR TO START THE ANOTHER GAS TURBINE IMMIDIATELY SYNCHRONISE AND PARALLED THE LOAD.
WEEKLY AND MONTHLY REPORT TO BE SUBMITTED.
DURING THE 24TH HOUR I USE TO CHECK LOAD AND FUEL CONSUMPTION THAT HOW MUCH IT IS UTISISED?
MINISTRY OF DEFENCE & AVIATION AND INSPECTOR GENERAL OF ROYAL SAUDI AIR DEFENCE FORCES ENGINEERING AND HOUSING DIRECTORATE.
FROM : 05/02/96 TO 04/07/97
POSITION : srCCR& GAS TURBINE OPREATOR.
DUTIES AND RESPONSIBILITIES :
DAILY OPERATION TO START/SHUTDOWN ON GAS TURBINE.
DAILY ROUTINE INSPECTIONS OF ALL INSTRUMENT METER READING PRESSURE.
EVERYHOUR CHECK PULSE CLEANING SYSTEM, DIFFERENTIAL PRESSURE FOR AIR INLET FILTER.
SYNCHRONISE THE GAS TURBINE AND PARALLEL LOAD.
LOAD BALANCING ADJUSTMENT AND GOVERNOR ADJUSTMENT.
CHECK ALL FEEDER BREAKER.
CHECK/CLEAN BASE LOAD UNIT FOR EXCESS GREASE OIL/FUEL EACH SHIFT.
I USE TO LOOK DAILY FUEL DELIVERY AND UNLOADING FUEL.
CLEAN SWITCH BOARD ONCE A WEEK.
SHARJAH ELECTRICITY AND WATER AUTHORITY (SEWA)
800 MW LAYAH POWER STATION, SHARJAH, U.A.E.
SINCE 02/12/1997. TO 08/06/1999
POSITION : GAS TURBINE AND CENTRAL CONTROL ROOM OPERATOR
DUTIES AND RESPONSIBILITIES:
HANDLING ALL LOCAL AND CENTRAL CONTROL ROOM OPREATIONS OF GAS TURBINES.
OPERATIONS OF LUBE OIL SYSTEM AND ABLE TO PUT ON TURNING GEAR, HYDROLIC RATCHETING SYSTEM.
CHARGING LUBE OIL COOLERS, MAIN LUBE OIL AND HYDROLIC OIL, CONTROL OIL FILTERS.
HOURLY MONITORING AND LOGGING OF LOAD, POWER FACTOR, BUS VOLTAGE, TEMPERATURES, PRESSURES AND LEVEL GAUGES.
ISOLATIONS AND DEISOLATIONS OF MECHANICAL AND ELECTRICAL EQUIPMENTS.
PRE-START CHECKS, RECOMMISSIONING CHECKS AFTER MAJOROVERHAULLINGBASELOADTESTANDPEAK LOAD TEST, TURBINE AND GENERATOR PROTECTION TEST.
GAS TURBINE COMPRESSOR CHEMICAL AND WATER WASHING (ON LOAD & OFFLOAD) AND CARBOBLASTING.
SF6.33 KV SWITCH GEAR ROOM.
H GEAR GAS INSULATED, EVERY HOUR CHECK AND TAKE PRESURE READING.
6.6 KV AUXILARY SUPPLY ROOM CHECK AND READING.
MINISTRY OF ELECTRICITY AND WATER AND MINISTRY OF ENERGY (KUWAIT). SABIYA POWER & DESALLATION PLANT.
MANUFACTURE MITSUBISHI HEAVY INDUSTRIES LTD.
8 X 300 STEAM TURBINE GENERATOR THERMAL PLANT.
CONTROL TYPE : CRT, OPS, DCS CONTROL TOUCH KEY OPERATION SYSTEM. NAGASAKIJAPAN. PLANT CAPACITY 2400 MW.
FROM : 27/03/2002 TO 03/01/2004.
POSITION :srCCR& FIELD OPERATOR
DUITES AND RESPONSIBILITIES:
PRINCIPAL OPERATION CONTROL MONITORING AND ASSIST THE PLANT OPERATION START UP/ SHUTDOWN AS PER THE DEMAND.
CONTROL AND MONITORING THE AUXILARY EQUIPMENT & PLANT OPERATING PARAMETER, MAINTAIN DETAIL RECORDS OF ALL ACTIVITIES AND LOG DOWN EVERY TWO HOURS OR ACCORDING TO SENIOR SHIFT CHARGE ENGINEER.
MAINTAIN THE EQUIPMENT CHANGE OVER OPERATION AND DC EQUIPMENT, OPERATION CHECK ACCORDING TO SCHEDULE AND CAPABLE TO HANDLE ALL TYPE OFF TROUBLE DURING OPERATION PERFORMED. THE TURBINE VALVE STEAM FREEDOM TEST. MSV/ MCV/ RSV/ ICV/MEV. ALSO TURBINE PROTECTIVE DEVICE TEST, SUCH AS BRG OIL LOW. TRUST WEAR OIL HIGH, CONDENSOR VACCUUM LOW AND HP CONTROL OIL LOW, AND (MOST OIL PLAYER). MECHANICAL OIL SPEED TEST.
SUCESSFULLY CARRIED OUT THE TURBINE LOAD REJECTION TEST.
BOILER FEED WATER PUMP AND CIRCULATING WATER PUMP 60% RUN BACK TEST. ONE FDF, RAH, GRF & HALF CONDENSOR OPERATION DURING ONE MONTH RELIBILITY TEST. RUN OF THE UNIT.
DURING COMMISSIONING PERIOD I WAS WITTNESS FOR THE SAFETY INSPECTION AND PRILIMINARY RUN TEST.
ON LOAD TEST OF ALL AUXILIARY EQUIPMENT OF BOILIER AND TURBINE, SUCH AS ALL TYPES OF PUMPS AND FAN. ALSO PERFORMED PRE –BOILER AND BOILER ACID CLEANING CONDENSOR WATER.
TUBE BALL CLEANING SYSTEM CONDENSOR TUBE AUTO AND MANUAL OPERATES.
EVERY 8 HOURS AFTER SOOT BLOWER START FOR SUPER HEATER / RE-HEATER AND AIR HEATER.
ENI GAS B.V WESTERN LIBYA GAS PLANT WAFA ON SHORE OIL GAS FIELD
COMPANY: DIETSMANN...S.A.M
FROM : 05/05/2005 TO 30/04/2006, TRANSFERED TO NIGERIA PROJECT
POSITION :CCR& SENIOR POWER PLANT AND UTILITIES OPERATOR
DUTIES AND RESPONSIBILITIES:
TO PROVIDE SERVICES FOR THE EFFECTIVE OPERATION OF THE GAS TURBINE GENERATOR FOR THE MAXIMUM GENERATION OF ELECTRICAL ENERGY FROM THE POWER PLANT NEEDED FROM THE OPERATION OF THE GAS PLANT COMPLEX.
OPERATES GAS TURBINE UNIT (GENERAL ELECTRICAL- NUOVO PIGNONE) SINGLE SHAFT HEAVY DUTY GAS TURBINE UNIT DRIVING AN SYNCHRONOUS GENERATOR. THE GAS TURBINE MODEL MS-5001 IS A SINGLE CYCLE SINGLE SHAFT GAS TURBINE WITH A TEN(10) COMBUSTOR, REVERSE FLOW COMBUSTION SYSTEM. THE GAS TURBINE IS USING SPEEDTRONIC CONTROL MARK V. EACH GAS TURBINE CAPACITY
17.5 X 3. TOTAL CAPACITY 62.5 COMBINE CYCLE W.H.R.U. ECR SYSTEM. ECD MANULLY
BUS BAR A.B.C. GAS TURBINE MAIN CONTROL FROM MARK V CONTROL HMI MODEL.
OPERATES, CONTROLS, AND MONITOR GAS TURBINE EQUIPMENT AND RELATED AUXILIARIES TO ENSURE OPTIMUM PERFORMANCE AND RELIABLITY TO GENERATE ELECTRICAL POWER FOR THE REQUIREMENTS NEEDED FOR THE EXPORT/ OFF GAS COMPRESSOR COOLER FAN MOTORS AND AUXILIARIES, MOTORS FOR NGL EXPEDITION PUMPS, REGENERATION GAS COMPRESSOR AND OTHER RELATED EQUIPMENT USING ELECTRIC CURRENT.
COORDINATES WITH DCS OPERATOR AND ELECTRICAL GROUP FOR THE PROPER START UP AND SYNCHRONIZATION OF GAS TURBINE IN ORDER TO ELIMINATE POTENTIAL DAMAGE TO EQUIPMENT. DURING SHUTDOWN PROCESS OF POWER PLANT, ALSO COORDINATES WITH THE SAME GROUP FOR PROPER SHUTDOWN OF THE GAS TURBINE.
STARTS WASTE HEAT RECOVERY UNIT ATTACHED TO THE GAS TURBINE USING SUPPLEMENTARY OR AUXILIARY MODE OF FIRING FOR THE HEATING UP OF HOT OIL NEEDED FRO THE GAS PROCESSING TRAINS.
MAINTAINS HOUSKEEPING AND ORDERLINESS INSIDE THE PLANT AT ALL TIMES AND ASSIST MAINTENANCE GROUP IN REPAIR ACTIVITIES TO ENSURE THAT EQUIPMENT DOWNTIME ARE MINIMIZED. IN ANY EVENT OF IRREGULAR OPERATION REPORTS THE SAME IMMEDIATELY SUPERVISOR FOR PROPER REMEDIAL PROCEDURE AT LEAST MINIMUM TIME FRAME.
ASSIST GAS TRAIN OPERATOR IN THE EVENT HE NEEDS ASSISTANCE IN MAINTAINING THE CONTINOUS OPERATION OF THE GAS PROCESSING GAS TRAINS. ASSIST ALSO THE EXPORT/OFFGAS OPERATOR DURING THE START UP OF THE SAID UNITS.
MONITORING AND CHECKING OF THE GAS TRAIN FACILITIES SUCH AS GAS SWEETENING, DEHYDRATION AND DEW POINT CONTROL UNIT.
MONITORING AND CHECKING OF LIQUID TRAIN FACILITIES FROM THE OIL SLUG CATCHER TO THE LIQUID STABILIZATION. SEE TO IT THAT THE CONDENSATE IS OF THE CORRECT SPECIFICATION PRIOR TO STORAGE TO THE STORAGE TANK.
NIGERIAN AGIP OIL COMPANY(NAOC)-ENI GROUP-NIGERIA
(ON- SHORE PROJECT)
COMPANY:NETCO DIETSMANN LTD
FROM : 05/05/2006 TO23/03/09 RESIGN FROM JOB DUE TO KIDNAPING IN OIL GAS WORKERrisky country
POSITION : srcontrol room operator
ORGANISATIONAL EXPERIENCE
Since may’06 associated with OKPAI, IPP Power Plant, Nigeria as control room desk operator
(Capacity- 480 Mwatt [Alstom Gt 13 E2] 2 x 160 MW Gas Turbine Combine Cycle & Steam Turbine 150 MW)
Role:
Acting as a Desk Operator in Power Plant Zone Control Room.
Attending & resolving electrical & instrument problems, working in control room; managing emergency field operation mechanical work.
Operations Purview:
Gas Turbine Combine Cycle 2 x 160 Mw alstom made and Steam Turbine 150 MW/ ALSPA320/DCS Control System / GT/ Advant Control System Unit Start –Up / shutdown / running unit monitoring / defect of plants / daily report of power generation & unit start /stop as per grid requirement. 480 mega watt feeding in grid.
Heat Recovery Boiler / Water Treatment Plant / Fire Fighting System / Waste Water System / D M Plant Cooling Tower, Main C.W. Pumps, ACW / CCW Cooling System / Black Start / Emergency Diesel Generation Start-up.
DUTIES AND RESPONSIBILITIES: MONITORING AND ANALYSING TOTAL POWER STATION OPERATION AND AUXILIARY EQUIPMENTS
LIAISING WITH LOAD DISPATCH CONTROL AND GAS SUPPLY AGENGY
PETROVIETNAM OIL&GAS CORPORATION DUNGQUAT REFINERY ONSHORE PROJECT, SHUTDOWN START UP JOB FOR 3 MONTH
FROM : 03/05/ 09 TO 12/08/2010
POSITION : SENIOR PANEL OPERATOR
EQUIPMENTS HANDLED IN LAYAH POWER STATION SHARJAH.
2 X 22 MW GAS TURBINE: DUEL FUEL, AEROMATIC ENGINE BY
UNITED TECHNOLOGIES STARTING DEVICE :AIR START PAC. 7000 RPM TURBINE SPEED ALTERNATOR 3000 RPM.
2 X 33 MW GAS TURBINE: MARK IV SPEEDTRONIC, DUEL FUEL FRAME
VI ENGINES BY ALSTHOM ATLANTIQUE,
FRANCE TURBINE SPEED 5000 RPM ALTERNATOR 3000 RPM.
2 X 33 MW GAS TURBINE:MARK V SPEEDTRONIC DUEL FUEL FRAME
VI ENGINES BY GEC ALSTHOM, SUPER
PACKAGE, TURBINE SPEED 5000 RPM ALTERNATOR 3000 RPM.
2 X 120 MW GAS TURBINE:DUEL FUEL FRAME IX ENGINES BY GAS
EUROPEAN GAS TURBINE. TURBINE SPEED 3000 RPM ALTERNATOR 3000 RPM.
EQUIPMENTS HANDLED IN SCECO IN SAUDI ARABIA EASTERN PROVINCE.
5 X 4 MW GAS TURBINE:TB 5000 RUSTON GAS TURBINE LINCON,
ENGLAND, U.K, TURBINE SPEED 18000 RPM
ALTERNATOR 1800 RPM, AEROMATIC
ENGINE.
EQUIPMENTS HANDLED IN MODA SAUDI ARABIA.
3 X 2.7 MW GAS TURBINE:DRESSER RAND KONGSBERG, NORWAY.
MODEL KG2 AND KG3.
EQUIPMENT HANDLED IN KING FAHAD AIRBASE IN TAIF, SAUDI ARABIA OPERATING DIESEL ENGINE.
TYPE OF ENGINE / MAKE / QTY / MW / TOTAL CAPACITY.S.W.D. 16 TM-410 / HOLLAND / 04 / 6.5 / 26 MW
S.W.D.6 TM – 410 / HOLLAND / 02 / 1.5 / 3.0 MW
DEUTZ / GERMANY / 04 / 1.5 / 6.0 MW
GM EMD / USA / 05 / 1.0 / 5.0 MW
1