SPECIAL PROVISIONS - SP2016 BOOK Created August 20, 2015

Last Revision by CO Special Provisions: 09/28/17 Page 393

▲ DO NOT DELETE THE ABOVE REVISION DATE. This is how we tell which version of the SP2016 book you used when preparing your specs for your job.

S.P. Number of Your Job goes here

When copying from this document set the following Styles:

Normal: font size 10 pt.; Paragraph: left, line spacing single, spacing 0 before & 0 after

Heading 1: font size - 12pt ; Underline; Paragraph: Indent 0: hanging 1" flush left, keep with next; no tab at 0.5"

Heading 2: font size - 10pt ; flush left, line spacing single, Widow/orphan control, Level 2, Outline numbered, Tabs: 1"

TRACKING CHANGES TO SPECIAL PROVISIONS

Because of problems in the field with modifications to the Special Provisions by both contractors and field personnel, we will now start identifying those changes in the proposals.

When preparing and submitting draft special provisions please follow the following process:

Start by downloading the most current SP2016. The Special Provisions Unit will not be accepting provisions copied from prior spec books unless no current alternative exists and the specification has been brought into conformance with the current spec year.

(A) If you want to use a C.O. SP2016 write-up of an item but WILL NOT be making any changes within the write-up, then do the following:

Show Section Name and number

Example:

S-X (1910) COST ESCALATION

SP2016-53

Just show the Section Name and Number. When you leave the SP2016-Number intact, this will indicate to the Special Provisions Unit that you have not changed the section and want the most current write-up.

(B) If you want to use a C.O. SP 2016 write-up, but WILL be making changes within the write-up, then do the following prior to sending us your file:

Show Section Name and SP2016 number, followed by "modified".

Example:

S-X (1910) COST ESCALATION

SP2016-53 - MODIFIED

Show entire special provision, including your revisions. Make it as easy as possible for the Special Provisions Unit to recognize your changes. Highlight changes to the provisions in yellow so they are easily identified. In addition, select the paragraph and add a right border where the modifications were made as shown below.

If you DO NOT show the sections as “modified”, the Special Provision Unit will most likely assume you want the current section from the SP2016. So, you may not get what you want.

(C) You don’t need to mark your changes in the following sections:

Spec. # / Section Name /
/ CONTACT INFORMATION /
/ PRE-LETTING MEETING /
/ SPECIAL PROVISIONS ENCOURAGING INDIAN EMPLOYMENT /
1404 / MAINTENANCE OF TRAFFIC AND (2563) TRAFFIC CONTROL /
1505 / COOPERATION BY CONTRACTORS
1507 / UTILITY PROPERTY & SERVICE
1706 / EMPLOYEE HEALTH AND WELFARE
1718 / FURNISHING RIGHT OF WAY
1803 / PROSECUTION OF WORK
1806 / DETERMINATION AND EXTENSION OF CONTRACT TIME
1807 / FAILURE TO COMPLETE THE WORK ON TIME
2011 / CONSTRUCTION SURVEYING
2563 / TRAFFIC CONTROL SUPERVISOR

SPECIAL PROVISIONS - SP2016 BOOK Created August 20, 2015

Last Revision by CO Special Provisions: 09/28/17 Page 393

▲ DO NOT DELETE THE ABOVE REVISION DATE. This is how we tell which version of the SP2016 book you used when preparing your specs for your job.

S.P. Number of Your Job goes here

INDEX--SP2016BOOK

SP2016# ITEM# DATA PAGE

S-1 CONTACT INFORMATION 19

SP2016-1 19

S-2 CONTACT INFORMATION AND CLARIFICATION PROCESS 19

SP2016-1.1 19

S-3 PRE-LETTING CONFERENCE 20

SP2016-2 20

S-4 SPECIAL PROVISIONS RELATING TO INDIAN EMPLOYMENT 20

SP2016-3 20

S-5 EQUAL PAY 21

SP2016-4 21

S-6 RESPONSIBLE CONTRACTOR 21

SP2016-5 21

S-7 COMPLIANCE WITH TAX LAW REQUIREMENTS 22

SP2016-6 22

S-8 REFERENCE INFORMATION DOCUMENTS 22

SP2016-7 22

S-9 EMERALD ASH BORER COMPLIANCE 23

SP2016-8 23

S-10 PARTNERING 24

SP2016-9 24

S-11 USE OF ADHESIVE ANCHORS 25

SP2016-10 25

S-12 TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS 25

SP2016-11 25

S-13 MINNESOTA REPORT ON JOBS REQUIREMENTS 25

SP2016-12 25

S-14 ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR FEDERALLY FUNDED PROJECTS 25

SP2016-13 25

S-15 ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR STATE FUNDED PROJECTS 27

SP2016-14 27

S-16 (1103) DEFINITIONS 29

SP2016-14.1 29

S-17 (1301) CONSIDERATION OF PROPOSALS (LANE RENTAL METHOD) 29

SP2016-14.2 29

S-18 (1301) CONSIDERATION OF PROPOSALS (A+B METHOD) 31

SP2016-14.3 32

S-19 (1302) AWARD OF CONTRACT 33

SP2016-15 33

S-20 (1306) EXECUTION AND APPROVAL OF CONTRACT 35

SP2016-16 35

S-21 BLANK 35

SP2016-17 35

S-22 (1404) MAINTENANCE OF TRAFFIC AND (2563) TRAFFIC CONTROL 35

SP2016-18 35

S-23 (1505) COOPERATION BY CONTRACTORS 55

SP2016-19 55

S-24 (1505) COOPERATION BY CONTRACTORS (BRIDGE) 56

SP2016-20 56

S-25 (1507) UTILITY PROPERTY AND SERVICE 56

SP2016-21 56

S-26 (1508) CONSTRUCTION STAKES, LINES, AND GRADES 57

SP2016-22 57

S-27 (1508) CONSTRUCTION STAKES, LINES, AND GRADES 58

SP2016-23 58

S-28 (1508) CONSTRUCTION STAKES, LINES, AND GRADES 59

SP2016-24 59

S-29 (1508) CONSTRUCTION STAKES, LINES, AND GRADES 59

SP2016-25 59

S-30 (1508) CONSTRUCTION STAKES, LINES, AND GRADES 59

SP2016-26 59

S-31 (1514) MAINTENANCE DURING CONSTRUCTION 60

SP2016-27 60

S-32 (1601) SOURCE OF SUPPLY AND QUALITY 60

SP2016-28 60

S-33 (1602) NATURAL MATERIAL SOURCES 61

SP2016-29 61

S-34 (1606) STORAGE OF MATERIALS 63

SP2016-30 63

S-35 (1701) LAWS TO BE OBSERVED (WET LANDS) 63

SP2016-31 63

S-36 (1701) LAWS TO BE OBSERVED (BUILDING REMOVALS OR MOVES) 64

SP2016-32 64

S-37 (1701) LAWS TO BE OBSERVED (BRIDGE) 67

SP2016-33 67

S-38 (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES –FEDERALLY FUNDED) 68

SP2016-34 68

S-39 (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED) 69

SP2016-35 69

S-40 (1701) LAWS TO BE OBSERVED – CARGO PREFERENCE ACT, USE OF UNITED STATES - FLAGGED VESSELS 70

SP2016-35.1 70

S-41 (1701) LAWS TO BE OBSERVED – CERTIFICATION OF NONDISCRIMINATION AGAINST ISRAEL 70

SP2016-35.2 70

S-42 (1706) EMPLOYEE HEALTH AND WELFARE 71

SP2016-36 71

S-43 (1707) PUBLIC CONVENIENCE AND SAFETY 71

SP2016-37 71

S-44 (1712) PROTECTION AND RESTORATION OF PROPERTY 71

SP2016-38 71

S-45 (1717) AIR, LAND, AND WATER POLLUTION (CONCRETE GRINDING) 72

SP2016-39 72

S-46 (1717) MPCA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION STORM WATER (CSW) PERMIT 75

SP2016-40 76

S-47 (1717) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR TRIBAL LANDS 78

SP2016-41 78

S-48 (1718) FURNISHING RIGHT OF WAY 80

SP2016-42 80

S-49 IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT 80

SP2016-43 80

S-50 (1801) SUBLETTING OF CONTRACT 81

SP2016-44 81

S-51 BLANK 81

SP2016-45 81

S-52 (1802) TRAINING FOR CONSTRUCTION TRUCK OPERATORS 82

SP2016-46 82

S-53 PROSECUTION OF WORK (ADA) 82

SP2016-47 82

S-54 (1803) PROGRESS SCHEDULES 87

SP2016-48 87

S-55 (1803) LIMITATION OF OPERATIONS - NIGHT CONSTRUCTION 92

SP2016-49 92

S-56 (1806) DETERMINATION AND EXTENSION OF CONTRACT TIME 93

SP2016-50 93

S-57 (1806) DETERMINATION AND EXTENSION OF CONTRACT TIME (LANDSCAPING) 95

SP2016-51 95

S-58 (1807) FAILURE TO COMPLETE THE WORK ON TIME 96

SP2016-52 96

S-59 (1910) COST ESCALATION 97

SP2016-53 97

S-60 (2011) CONSTRUCTION SURVEYING 97

SP2016-54 97

S-61 (2011) CONSTRUCTION SURVEYING (METRO) 102

SP2016-54.1 102

S-62 (2011) CONSTRUCTION SURVEYING – DIGITAL SURFACE MODEL METHOD USING THE AMG-EXCAVATION SYSTEM) 107

SP2016-54.2 107

S-63 (2011) CONSTRUCTION SURVEYING FOR ASPHALT BOND BREAKER LAYER UNDER CONCRETE OVERLAYS 113

SP2016-55 113

S-64 (2011) AS-BUILTS 114

SP2016-56 114

S-65 (2013) ROAD/WEATHER SENSOR AND CABLE 116

SP2016-57 116

S-66 (2013) ROAD WEATHER INFORMATION SYSTEM (R/WIS) 121

SP2016-58 121

S-67 (2016) QUALITY MANAGEMENT - PAVER MOUNTED Thermal Profile (PMTP) Method 124

SP2016-59 124

S-68 (2016) QUALITY MANAGEMENT SPECIAL – INTELLIGENT COMPACTION (IC) METHOD 137

SP2016-60 137

S-69 (2031) FIELD OFFICE AND LABORATORY 151

SP2016-61 151

S-70 (2031) FIELD OFFICE AND LABORATORY – BROADBAND SERVICES 152

SP2016-62 152

S-71 (2031) COMBINATION FIELD LAB OFFICE 153

SP2016-63 153

S-72 (2041) ON-THE-JOB-TRAINING PROGRAM 154

SP2016-64 154

S-73 (2051) MAINTENANCE AND RESTORATION OF HAUL ROADS 158

SP2016-65 158

S-74 (2101) CLEARING AND GRUBBING 158

SP2016-66 158

S-75 (2102) PAVEMENT MARKING REMOVAL 159

SP2016-67 159

S-76 (2103) BUILDING REMOVAL 161

SP2016-68 161

S-77 (2103) CONSTRUCTION WASTE MANAGEMENT AND DEBRIS RECYCLING REQUIREMENTS 162

SP2016-69 162

S-78 (2104) REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES 163

SP2016-70 163

S-79 (2104) REMOVE AND HAUL TREATED WOOD 164

SP2016-71 164

S-80 (2104) REMOVE TANK 165

SP2016-72 165

S-81 (2104) ABATE ASBESTOS-CONTAINING PIPES OR CULVERTS 166

SP2016-73 166

S-82 (2104) ASBESTOS CONTAINING WASTE MATERIAL ABATEMENT 168

SP2016-73.1 168

S-83 (2104) ASBESTOS AND REGULATED WASTE ASSESSMENT 170

SP2016-74 170

S-84 (2104) REGULATED WASTE ASSESSMENT (BRIDGE) 171

SP2016-75 171

S-85 (2104) REMOVAL OF ASBESTOS AND REGULATED WASTE (BRIDGE) 171

SP2016-76 171

S-86 (2104) REMOVE ASBESTOS AND REGULATED WASTE MATERIAL 172

SP2016-77 172

S-87 (2104) HAUL SALVAGED MATERIALS 173

SP2016-78 173

S-88 (2104) ABANDON PIPE SEWER 174

SP2016-79 174

S-89 (2104) REMOVE SEALANT MATERIALS 174

SP2016-80 174

S-90 (2104) REMOVE SEALANT MATERIALS 174

SP2016-81 174

S-91 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) 175

SP2016-82 175

S-92 (2105/2106) EXCAVATION AND EMBANKMENT – DIGITAL SURFACE MODEL METHOD USING THE AMG-EXVCAVATION SYSTEM 176

SP2016-82.1 176

S-93 (2105) ROCK BLASTING SPECIFICATIONS 177

SP2016-83 177

S-94 (2105) ROCK EXCAVATION (PRODUCTION BLASTING) 182

SP2016-84 182

S-95 (2105) SETTLEMENT PLATES 183

SP2016-85 183

S-96 (2105) CONSTRUCT TURN LANE 183

SP2016-86 183

S-97 (2105) WEEP TRENCH 184

SP2016-87 184

S-98 (2105) SHOULDER TRENCHING 184

SP2016-88 184

S-99 (2105) SOIL STABILIZATION GEOGRID 184

SP2016-89 184

S-100 (2105) GEOTEXTILE FABRIC BOND BREAKER INTERLAYER FOR CONCRETE OVERLAY 185

SP2016-89.1 185

S-101 (2105) GEOTEXTILE FOR SEPARATION (STABILIZATION) 187

SP2016-90 187

S-102 (2105) CONTROLLED EXCAVATION 188

SP2016-91 188

S-103 (2105) SUBGRADE SOIL MODIFICATION 191

SP2016-91.1 191

S-104 (2105) RAILROAD TRACK SUB-BALLAST 195

SP2016-92 195

S-105 (2106) EXCAVATION AND EMBANKMENT 196

SP2016-93 196

S-106 BLANK 196

SP2016-93.1 196

S-107 BLANK 196

SP2016-93.2 196

S-108 (2112) SHOULDER PREPARATION 196

SP2016-94 196

S-109 (2118) AGGREGATE SURFACING 197

SP2016-94.1 197

S-110 (2118) AGGREGATE SURFACING (CV) CLASS __ 197

SP2016-95 197

S-111 (2123) TRACTOR MOUNTED BACKHOE 198

SP2016-96 198

S-112 (2123) CRAWLER MOUNTED BACKHOE 198

SP2016-97 198

S-113 BLANK 198

SP2016-98 198

S-114 (2211) AGGREGATE BASE 198

SP2016-99 198

S-115 BLANK 199

SP2016-99.1 199

S-116 (2215) RECLAMATION 199

SP2016-100 199

S-117 BLANK 202

SP2016-100.1 202

S-118 (2221) SHOULDER BASE AGGREGATE 202

SP2016-101 202

S-119 (2231) BITUMINOUS PATCHING MIXTURE 203

SP2016-102 203

S-120 (2231) PAVEMENT SEATING 203

SP2016-103 203

S-121 (2231) PAVEMENT CLEANING 204

SP2016-104 204

S-122 (2231) PAVEMENT CRACKING 204

SP2016-105 204

S-123 (2231) BITUMINOUS SURFACE (CRACK AND JOINT REPAIR) 205

SP2016-106 205

S-124 (2231) PAVEMENT BREAKING (RUBBLIZING) 206

SP2016-107 206

S-125 BLANK 207

SP2016-108 207

S-126 (2232) MILLED RUMBLE STRIPS 207

SP2016-109 207

S-127 (2232) MILLED RUMBLE STRIPS 207

SP2016-110 207

S-128 (2232) MILLED SINUSOIDAL RUMBLE STRIPS 208

SP2016-110.1 208

S-129 (2232) MILLED RUMBLE STRIPS (CONCRETE) 208

SP2016-111 208

S-130 (2232) MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE) 208

SP2016-111.1 209

S-131 (2232) MILLED RUMBLE STRIPS - INTERMITTENT 209

SP2016-112 209

S-132 (2232) MILLED SINUSOIDAL RUMBLE STRIPS - INTERMITTENT 209

SP2016-112.1 209

S-133 (2232) MILL AND PATCH BITUMINOUS PAVEMENT (ADA) 210

SP2016-113 210

S-134 (2301) CONCRETE PAVEMENT FOR ALTERNATE BID 211

SP2016-114 211

S-135 (2301) CONCRETE PAVEMENT 212

SP2016-115 212

S-136 (2301) DOWEL BAR 223

SP2016-115.1 223

S-137 (2301) DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED) 223

SP2016-116 223

S-138 (2301) HIGH PERFORMANCE DOWEL BAR – 1.25 inch 223

SP2016-117 223

S-139 (2301) HIGH PERFORMANCE DOWEL BAR – 1.5 inch 224

SP2016-118 224

S-140 (2301) CONCRETE PAVEMENT LUGS 224

SP2016-119 224

S-141 (2301) SLAB JACKING 224

SP2016-120 224

S-142 BLANK 225

SP2016-121 225

S-143 (2302) CONCRETE PAVEMENT REHABILITATION (CPR) 225

SP2016-122 225

S-144 (2302) CONCRETE GRINDING 248

SP2016-123 249

S-145 (2302) CONCRETE GRINDING WITH NO INCENTIVES 255

SP2016-124 255

S-146 (2331) BITUMINOUS JOINT SAWING AND SEALING 261

SP2016-125 261

S-147 (2331) PAVEMENT JOINT ADHESIVE 264

SP2016-126 264

S-148 (2331) COLD-IN-PLACE RECYCLED (CIR) BITUMINOUS 266

SP2016-127 266

S-149 (2331) COLD CENTRAL PLANT RECYCLING (CCPR) BITUMINOUS 272

SP2016-127.1 272

S-150 (2331) MASTIC FOR VOID FILLING 278

SP2016-128 278

S-151 (2331) BITUMINOUS PAVEMENT CRACK TREATMENT 279

SP2016-129 279

S-152 (2331) BITUMINOUS PAVEMENT CRACK TREATMENT CLEAN AND SEAL 284

SP2016-130 284

S-153 (2353) ULTRATHIN BONDED WEARING COURSE (UTBWC) (MSCR) 289

SP2016-130.1 289

S-154 (2356) BITUMINOUS SEAL COAT 289

SP2016-131 289

S-155 (2356) BITUMINOUS UNDERSEAL 290

SP2016-132 290

S-156 (2356) OTTA SEAL 292

SP2016-133 292

S-157 (2357) BITUMINOUS TACK COAT 295

SP2016-134 295

S-158 (2357) BITUMINOUS MATERIAL FOR SHOULDER TACK 296

SP2016-135 296

S-159 (2358) BITUMINOUS PRIME COAT 296

SP2016-135.1 296

S-160 BLANK 296

SP2016-136 296

S-161 BLANK 296

SP2016-137 297

S-162 (2360) PLANT MIXED ASPHALT PAVEMENT (MSCR) 297

SP2016-137.1 297

S-163 BLANK 300

S-164 (2360) PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (MSCR) 300

SP2016-138.1 300

S-165 BLANK 305

SP2016-139 305

S-166 (2360) PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR) 305

SP2016-139.1 305

S-167 (2360) POROUS ASPHALT PAVEMENT 308

SP2016-140 308

S-168 (2360) FINE-GRADED (4.75 mm) ASPHALT MIXTURE 319

SP2016-140.1 319

S-169 (2360) PLANT MIXED ASPHALT PAVEMENT - THICKNESS PAYMENT SCHEDULE 323

SP2016-141 323

S-170 BLANK 324

SP2016-141.1 324

S-171 (2363) PERMEABLE ASPHALT STABILIZED STRESS RELIEF COURSE (PASSRC) AND PERMEABLE ASPHALT STABILIZED BASE (PASB) (MSCR) 325

SP2016-141.2 325

S-172 BLANK 325

SP2016-142 325

S-173 (2365) STONE MATRIX ASPHALT - SMA (MSCR) 325

SP2016-142.1 325

S-174 (2399) PAVEMENT SURFACE SMOOTHNESS 326