AAYUSH SHRIVASTAVA (B.E.Civil)

Address: Al-Quasis, Dubai.

Visa Status : Resident Mob : +971-56-1491592.

OBJECTIVE:

To pace up my career growth in a growing organization, and during my growth journey being a learner; acquirer of skills; and be a top-notch professional.

PERSONAL ATTRIBUTES:

Innate ability to grasp quickly using my analytical skills.

Clear and effective communicator.

Dedicated professional, winning accolades for competently completing assignments within given schedules and inspiring trust and respect through committed hard work.

Synergetic team Leader.

Professional Experience:

10 Years of extensive Experience in façade industry for high rise multi-storey, commercial and residential construction in various landmark projects in UAE/ India and Infrastructure and industrial projects in India. The work sphere includes Project Execution, Managing and Monitoring the Installation of Steel Structures In high rise towers, Industrial Sheds, Pre Engineered Buildings and aluminium architectural products including Unitized, Semi-unitized, Stick system, Spider façade and different curtain walls.

1. From Jan 2011 till date : M/S AL Abbar Aluminium.

Job Title : Project Manager - Duties and Responsibilities:

  • Project Execution in accordance with specifications provided by the main contractor and preparing Material submittals and proposing technical submittals to main contractor in co-ordination with technical department.
  • Attending weekly/ monthly progress meeting with Client, Consultants, Architects, main contractor and other trade as per project requirements.
  • Checking the latest architectural drawings provided by main contractor and compare with the tender drawings. Raising variations if any change or difference comes during comparison.
  • Getting approval for proposed materials, concept designs, shop drawings from consultant and providing clarifications in case of doubts.
  • Making arrangements for mock- tests for the proposed system of facades. Conducting test with the standards shows in the specifications. Conducting tests and providing satisfactory results.
  • Planning and scheduling of installation on site in accordance with the project plan provided by planning department and managing resources for the project. This includes manpower arrangements, tools and machineries, access as scaffoldings and cradles, etc.

Project Executed

  • Nirlon Knowledge Park Phase 2 and 1- The Project includes complete façade work for different elevations with, conventional curtain walling, ACP cladding, imported clay tiles, canopies, louvers and operable.
  • First International Financial Centre – A Project by TCG developers in BKC, Business hub in Mumbai, constitutes, Unitized glazing on concrete as well as steel structure. It also features stick system, Metal cladding, tension rods, stainless vertical and horizontal cladding, canopy and unique architectural element Copper filled glass protruding through unitized panels.
  • Naman Mid Town – 16 story commercial building with unitized glazing and louvers and metal cladding with architectural horizontal and vertical aluminum fins.
  • Nirlon Knowledge Park Phase 3 and 4 – This Project includes façade work for different elevations with stick system curtain walling, glass louvers, ACP cladding, imported clay tiles, canopies, vertical and horizontal louvers, terrace crown and operable.
  • Current Project – Dubai International Airport Concourse 4. – In progress.

2. From June 2010 till Dec 2010 : M/S Aluplex India Pvt. Ltd.

Job Title : Project manager - Duties and Responsibilities:

  • Preparing Material submittals and proposing technical submittals to main contractor in co-ordination with technical department. Dealing with suppliers, vendors for different materials to provide the material with best price to match with company’s internal project budget.
  • Project Execution in accordance with specifications provided by the main contractor. Checking the latest architectural drawings provided by main contractor and compare with the tender drawings. Raising variations if any change or difference comes during comparison.
  • Getting approval for proposed materials, concept designs, shop drawings from consultant and providing clarifications in case of doubts..
  • Co-coordinating with the procurement department and purchase department for materials comes under bulk order. Checking of availability of complete material before start of first unit production.
  • Attending site meetings with main contractor, consultant and clients regarding site work progress and highlighting necessities on site for installation works. Raising variations for changes during the project execution.
  • Monitoring and reporting of work progress provided by under cater staff, site engineers, supervisors and comparing with the original master installation plan.
  • Monitoring the quality reports prepared by the site QC and execute the project with full standard quality requirements till handing over.
  • Preparing invoices for the amount of work done on monthly basis.

Project Executed

Palm Beach Residency – This project is cluster of 6 residential towers with façade of Unitized curtain wall with horizontal sun-shades, stick curtain wall, Aluminium Louvers, sliding doors and windows and punch windows.

3. From Sept 2008 till May 2010 : M/S LARATECH STRUCTURES LTD (Mumbai) (Part of SV JIWANI Group of Companies).

Job Title : Project Manager Façade division - Duties and Responsibilities:

  • Project Execution in accordance with specifications provided by the main contractor.
  • Preparing Material submittals and proposing technical submittals to main contractor in co-ordination with technical department. Dealing with suppliers, vendors for different materials to provide the material with best prize to match with company’s internal project budget.
  • Checking the latest architectural drawings provided by main contractor and compare with the tender drawings. Raising variations if any change or difference comes during comparison.
  • Getting approval for proposed materials, concept designs, shop drawings from consultant and providing clarifications in case of doubts.
  • Making arrangements for mock- tests for the proposed system of facades. Conducting test with the standards shows in the specifications. Conducting tests and providing satisfactory results.
  • Co-coordinating with the procurement department and purchase department for materials comes under bulk order. Checking of availability of complete material before start of first unit production.
  • Planning and scheduling of installation on site in accordance with the project plan provided by planning department and managing resources for the project. This includes manpower arrangements, tools and machineries, access as scaffoldings and cradles, etc. Attending site meetings with main contractor, consultant and clients regarding site work progress and highlighting necessities on site for installation works.
  • Monitoring and reporting of work progress provided by under cater staff, site engineers, supervisors and comparing with the original master installation plan.
  • Monitoring the quality reports prepared by the site QC and execute the project with full standard quality requirements till handing over.

Project Executed:

Classic Marmo Marble Factory at Silvassa: Aisa’s one of the biggest Artificial marble factory situated at Dadra and Nagar Haveli (UT). The Factory has two major sheds with a total area of approximately 45000 sq.mtrs with more than 2000 tons of steel. The complete shed is designed and executed on PEB concept.

Status : Completed.

4. From April 2008 till Aug2008 : M/S Prisma (L.L.C) Dubai- U.A.E.

Job Title : Project manager Aluminum Division - Duties and Responsibilities:

  • Project Execution in accordance with specifications provided by the main contractor.
  • Making arrangements for mock- tests for the proposed system of facades. Conducting test with the standards shows in the specifications. Conducting tests and providing satisfactory results.
  • Planning and scheduling of installation on site in accordance with the project plan provided by planning department and managing resources for the project. This includes manpower arrangements, tools and machineries, access as scaffoldings and cradles, etc.
  • Attending site meetings with main contractor, consultant and clients regarding site work progress and highlighting necessities on site for installation works. Raising variations for changes during the project execution. Preparing invoices for the amount of work done on monthly basis.

Project Executed

Sidra Tower:- The Project includes complete façade work for five elevations with, unitized curtain walling, ACP cladding, handrails, canopies, louvers and conventional curtain walling. The total façade area is 45000 sq meters approximately. There are 45 floors in the building which are divided into residential, commercial and parking.

Status - Completed.

5. From Oct 2005 till March 2008: M/S Alumco (L.L.C) Dubai- U.A.E.

Job Title : Project Engineer Aluminum Division - Duties and Responsibilities

  • Managing and optimizing man hours, allocating resources for installation, Checking Site measurements and Controlling under cater staff.
  • Coordination with sub contractors, suppliers for various accessories, Project Production Management and Engineering departments.
  • Maintaining ISO certified quality in Installation.
  • Controlling product quality and inspection and Monitoring of quality of supplied products.
  • Inspection of aluminum profiles at their machining and fabrication stages as per project specification/drawings and standards.
  • Preparation of Incoming Material Report (IMR) and Non-Confirmation Report (NCR).
  • Co-ordination with vendors and purchase Management.
  • Inspection and Supervision of Test units at installation stages.
  • Identifying factors that may lead to poor quality and suggesting concepts to improve the standard of quality.

Projects Involved

Jumeirah Beach Residence:-

The Project includes Five Towers at JBR-Sector 6 with three towers having Basement + Ground + Mezzanine + 45 Floors. Aluminum works includes Sliding Doors, Curtain walls, skylights, Fix Windows and Frameless Doors with Aluk System. The total Facade area is 25000sq.m. Worth 20 million AED.

Status- Completed. Duration (From Oct’05 till Aug’06).

Al Karama Residential Building:-

Building with one basement, ground, mezzanine and 5 floors having more than 240 flats with segmented curved curtain walls, frameless curtain walls with many frameless doors with patch fittings and accessories. Many flats have segmented handrails and sliding doors and windows.

Status- Completed. Duration (From Aug’06 till Dec’06)

Deyaar Al Seef Towers:-

Better known as U1 and U2 Towers, one 3B+G+34 and other B+G+39 floors located at JLT(Jumeirah Lake Towers). The complete facade work follows the Stick System continuous curtain wall from level one to 39 and also the conventional curtain wall. It has the ACP cladding (Gut-bond), Steel Structure with a total Façade Area of 43000 sq.m. costing 55 million AED.

Status – Completed (From Jan’07 till Sept’07)

Citadel Tower:-

A 3B+G+6P+41 floors commercial building located at Business Bay having complete Unitized Curtain walling system and also the atrium with steel truss up to roof level. Project costs 42 million AED.

Status- Completed

6. Since June 2005 till Sept 2005: M/S Jiwani Constructions, Mumbai- India.

Project :- Foot over bridge at Charni Road Railway Station with skew plan .

Job Title: Project Engineer Bridge Construction (Trainee).

Duties and Responsibilities: -

  • Handling all on going activities on site, in co-ordination with BMC (Bombay Municipal Corporation).
  • Checking all Sub-contractor’s work and leading complete team with all supervisors and foremen.
  • Verifying all reinforcements as per detailed drawings and make them ready for concreting.
  • Preparing bills for all activities by company and sub-contractors along with monitoring manpower hours.
  • Checking and verification of all survey reports and drawings.

Qualification and awards:-

  • First Class Bachelor in Civil Engineering from Rajiv Gandhi Technical University with an aggregate of 71.1%.
  • Batch representative in batch for Civil Department.
  • Presented National Level Seminars on Blended Cements and Non-destructive Testing of Concrete.

Training and Projects :-

  • Vocational training at Railway Over Bridge on Broad Gauge in Dewas for 1 month.
  • Industrial Training at Hindustan Electro Graphite (HEG Ltd.) Mandideep, Bhopal.
  • Minor Project on Analysis of Multi-storied Building by Portal frame and Cantilever Method.
  • Major Project on Bridge Deck analysis by using computational methods and Staad-Pro.

Computer Skills :-

  • Auto-cad, Microsoft-office And Knowledge of Primavera.

Hobbies and interests :-

  • Playing cricket, football, volley-ball, Table tennis etc.
  • Playing musical instruments as key-board, mouth organ.
  • Watching movies, listening to songs.
  • Interacting with people around.

Personal Details

Name : Aayush Shrivastava.

Father’s Name : Mr. Ajay Kumar Shrivastava.

Mother’s Name : Mrs. Pratibha Shrivastava.

Date of Birth : 08 Nov’1983.

Education : Bachelor in Civil Engineering. Marital Status : Married.

Passport No : K-1656475.

Nationality : Indian

Languages known : Hindi and English (Speaking and writing).

Permanent Address : 4/8, Kothi Road, Moti bungalow,

Dewas- 455001, India.

I hereby declare that the above given Information is true to the best of my knowledge.

Place : DubaiDate:

Aayush Shrivastava.

Aayush Shrivastava - CVPage 1