APPENDIX C - DATA SHEET

UV DISINFECTION EQUIPMENT (WATER TREATMENT)

PROJECT TITLE (P) / DOCUMENT REFERENCE (P)
PROJECT NUMBER (P) / REVISION (P)
PROJECT LOCATION (P) / DATE (P)
EQUIPMENT SUPPLIER (S) / REFERENCE DRAWINGS INCLUDED (Y/N) (P)

WIMES 8.01(B)Page 1

* - Indicates Purchaser’s default requirement

3.0 OPERATING ENVIRONMENT AND SITE DETAILS

1 / Operating Environment (P)
Site Location () (P)
Inland
Coastal
Rural
Urban
Equipment Location () (P)
Inside
Outside
Ambient Temperature/Humidity Ranges (P)
Minimum/maximum ambient temperature (OC)
Minimum/maximum relative humidity (%)
EMC Environment () (P)
1st environment – C1
1st environment – C2
2nd environment – C3
2 / Special Environmental Hazards (P)
3 / References For Further Information (P)

4.0 PROCESS FLUID FLOW RATES, PRESSURES AND CHARACTERISTICS AND DETAILS OF UPSTREAM PROCESSES

4.1 Process Fluid Flow Rates and Pressures

1a) / Flow Rates for Treatment (m3/hr) (P)
Minimum
Mean
Maximum
1b) / Maximum Period with no Flow Available for Treatment (hrs) (P)
2 / Pressures at the Equipment Inlet (bar) (P)
Minimum
Mean
Maximum
3 / Maximum Rate of Change of Pressure at the Eqpt Inlet (bar/s) (P)

4.2 Process Fluid Characteristics

1 / Parameter / Min / Mean / Max
Turbidity (NTU)
TSS (mg/l)
UVT (at 245 nm) (%)
Hardness (mg CaCO3/l)
Dissolved Organic Carbon (mg/l)
Colour (°H)
pH
Iron (mg/l)
Manganese (mg/l)
Bromide (mg/l)
Chlorine (mg/l)
Nitrate (mg/l)
Nitrite (mg/l)
Ozone (mg/l)
Permanganate (mg/l)
2 / Unusual Process Fluid Characteristics (P)

4.3 Upstream Processes

1 / Details of Upstream Processes (P)

5.0 PERFORMANCE SPECIFICATION

5.1 General

1 / Service Life (Years) (P)

5.2 Disinfection Performance

1 / Disinfection Performance (P)
2 / Validation Protocol () (S)
UVDGM
ONORM
DVGW
Other (specify)
4 / 3rd Party Responsible for Validation (S)
5 / Limiting Operating Conditions to Maintain Validated Performance (S)
Maximum flow rate (m3/hr)
Minimum UVT (%)
5 / EOLL and SF Factors used During Validation (S)
EOLL factor
SF factor

5.3 Pressure Rating and Pressure Drop

1 / Pressure Rating (S)
Steady state (bar)
Maximum rate of change of pressure (bar/s)
2 / Pressure Drop (bar) (P/S)
Maximum allowable (P)
Rated (S)

5.4 Life Cycle Costs

5.4.1General

1 / LCC Assessment Required using WIMES LCC Model 05 (Y/N) (P)

5.4.2Energy Costs

1 / Maximum Equipment Power Input (kW) (S)

5.4.3 Service Lives and Costs of Consumable Components

1 / Guaranteed (G) and Expected (E) Service Lives of Components
Component (P) / Life (x 103hrs) (S)
Lamps (G and E)
Ballasts (G and E)
Sleeves (E)
UVRI sensors (E)
UVRI sensor windows (E)
UVRI sensor window seals (E)
Wiper rings (E)
Wiper arm seals (E)
Temperature sensors (E)
Level sensors (E)
Access flange seals (E)
2/3 / Costs of Components (£)/Time Required to Replace Components (hrs) (S)
Component / Cost / Time
Lamps
Ballasts
Sleeves
UVRI sensors
UVRI sensor windows
UVRI sensor window seals
Wiper rings
Wiper arm seals
Temperature sensors
Level sensors
Access flange seals

6.0 DESIGN SPECIFICATION

6.1 General

6.1.1 General

6 / Glass/Quartz Trap Required (Y/N) (P)
7 / Facilities for Mercury Retention Reqd.(Y/N) (P)
8 / Construction Strainer Required (Y/N) (P)
9 / Facilities for Capture and Disposal of Untreated Water Required (Y/N) (P)
11 / Reference for Particular Specification (P)

6.1.3 Weights and Lifting Arrangements

1 / Heaviest maintenance lift (kg)(S)
1 / Heaviest erection lift (kg) (S)

6.1.7 Health and Safety

4 / Specific Interlocking Requirements (P)

6.1.8Lagging and Trace Heating (Where Required)

1 / Protection Afforded to: (Minus 10 OC) (P)
2 / Reference for Particular Specification (P)

6.1.9 O & M Manuals

1 / Reference for Particular Specification (P)

6.1.10Training

1 / Reference for Particular Specification (P)

6.2 Equipment Configuration and Redundancy

1 / Number of Duty Process Streams (Reactors) (P/S)
1 / Process Stream Flow Capacity (m3/hr)
Process Stream 1
Process Stream 2
Process Stream 3
2 / Redundancy Requirements (P)

6.3 Flow Control System and Equipment Isolation

6.3.1 Flow Control System

2 / Type of Flow Control System Required/Provided for Equipment Inc. Multiple Process Streams() (P/S)
a) / Single control valve on common main/inlet manifold
b) / Dedicated control valve for each process stream
c) / Variable speed pumps
3 / Type of Control Valve (Where Required/Provided) (P/S)

6.3.2 Equipment Isolation

3 / AIV Operating Time (secs) (S)

6.4 Reactor(s)

2 / Reactor Material (SS No. 1.4401) (P)
3 / Inlet and Outlet Connections (P/S)
Size (NB) (mm)
Flange type

6.5 Lamps

1 / Lamp Details (S)
Type()
Low pressure
Low pressure high output
Medium pressure
Further Details
Manufacturer
Model/reference number

6.6 Lamp Sleeve Cleaning System (Where Required/Provided)

1 / Lamp Sleeve Cleaning System Required/ Provided (Y/N) (P/S)

6.7Monitoring Instruments

6.7.2 UVR Intensity Sensor(s)

1 / Number of Sensors per Reactor (S)

6.7.3 UVT Monitor(s)

1 / Number of Monitors Required (P)
1 / Redundancy Requirements (P)

6.7.4 Flow Meter(s)

3 / Type (Magnetic Flow Meter*) (P)
4 / Reference for Particular Specification (P)

6.9 LV Assembly and Associated Electrical Installation

6.9.1 General

2 / Assembly Configuration () (P)
Standalone
Part of a larger assembly
3 / Reference for Particular Specification (P)
4 / Type of Control System Required/Provided () (P/S)
PLC based
Micro-processor based
11 / Ballast Type () (S)
Electronic
Electromagnetic
11 / Ballast Voltages > 1000 V (Y/N) (S)
16 / Maximum Heat Dissipated by the Assembly (kW) (S)

6.9.2 Operator Controls

3 / Additional Operator Controls Required (P)

6.9.3 Local Indication of Operating Parameters

2 / Additional Operating ParameterIndication Requirements (P)

6.9.4Local Indication of Alarms and Status Signals

2 / Additional Alarm/Status Information Indication Requirements (P)

6.9.5 Remote Control and Monitoring (Where Required)

6.9.5.1 Remote Control

1 / Remote Control Requirements (P)

6.9.5.2 Remote Monitoring (e.g. via SCADA/Telemetry)

2 / Additional Remote Monitoring Requirements (P)
4 / Signal Output Requirements (i.e.Individual or Grouped) (P)

6.9.6 Data Acquisition and Recording on Site

2 / Additional Data Acquisition and Recording Requirements (P)

7.0 CONTROL PHILOSOPHY

7.1 General

1 / Dose Control Strategy () (P)
Calculated dose
Set point intensity

8.0 TEST SPECIFICATION

8.1 General

1b) / Witness FAT Required (Y/N) (P)

9.0 TRAINING REQUIREMENTS

1 / Operator Training Required (Y/N) (P)

ISSUE 1JULY 2014

WIMES 8.01(B)Page 1

APPENDIX D – SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION

Clause / Supplementary Information

ISSUE 1JULY 2014