Uttakskonkurranse NM i Automasjon 2014 – Strømmen VGS
Uttakskonkurranse NM i Automasjon 2014
Project 1:
Improving a production line with additional functionality.
Weighting (Points out of total) 25/100
Maximum time 45 minutes
Task:
Connect a relay to complete the functionality of a pre-assembled and pre-programmed station. The relay will be used to switch direction of the conveyor when the relay is activated from DO3. Whenever the conveyor moves to the right hand side, the lamp will show a green signal. Whenever the conveyor moves to the left hand side, the lamp will show a yellow signal. This has to be achieved with wiring only. No additional programming will be done.
A current limiter is included in the circuit to reduce the current spike when the conveyor starts. This component must be included with the right function to achieve full points on this task.
Documentation:
Wiring of the I/O-terminal
Input / Comment: / Output / Comment:DI0 / Workpiece at Belt Input / DO0 / Move Separator
DI1 / Workpiece at Separator / DO1 / Activate Belt
DI2 / Workpiece at Belt End / DO2 / Retract Stopper
DI3 / Separator in Basic Position / DO3 / Turn Belt Direction
DI4 / Orientation at Separator / DO4 / Not used
DI5 / Workpiece at Stopper / DO5 / Not used
Schematics Relay
Current limiter with connection example
Function description
This is a description of the required function for the production line. Points will be awarded according to how much of the function that is achieved.
Initial position:
Conveyor off
Stopper extended
Separator in Stop - position / cylinder retracted
Lights off
Initial position of the TO-module:
Gripper open
Gripper up
No workpieces at the station
Step / Description / Achieved / PointsLamp start on
Press start button
Lamp start off
A: / LQ1 on if station is in Initial Position
Place workpiece on belt input
Belt on and LQ1 off
Workpiece moves to Separator / 2
Check orientation
If workpiece is facing opening up continue with B:
If workpiece is facing opening down continue with C:
B: / Workpiece moves to end of conveyor / 2
Belt off, lamp LQ2 on / 1
Remove workpiece
LQ2 off
Continue with A:
C: / Workpiece moves to stopper / 1
Arm moves down
Grips workpiece
Arm moves up
Turn workpiece
Place workpiece on belt / 1
Belt switches direction / 3
Move workpiece to start of conveyor / 1
Belt off, LQ2 on
Remove workpiece
Continue with A:
Green signal light correct / 3
Yellow signal light correct / 3
Points / Points Max
Total Points for Function / 17
Professional Practice
PP No. / Description / Points deducted / Points per PP-0,8
-0,8
-0,8
-0,8
-0,8
PP Points Total: / 4
Time Points
Time point evaluation (Only granted if maximum points for function and at least 2,4 points for PP is achieved) / Points / Maximum time pointsPoints for time = (max. time – actual time) x max. points /(max. time – min. time) = (45.0- ...... ) x 4 Points / (45.0 - ...... ) / 4
Total Evaluation Project 1
Description / Points / Points MaxFunction / 17
Professional Practice / 4
Time Points / 4
Total Points / 25