BPA F 1210.06e
(04-11)Page 1 of 1 /
U.S. DEPARTMENT OF ENERGY
BONNEVILLE POWER ADMINISTRATION (BPA) / Electronic Form Approved by Forms Mgmt. 04/22/2011DATA REQUEST
Transmission Services
BPA F 1210.06e
(04-11)Page 1 of 1 /
U.S. DEPARTMENT OF ENERGY
BONNEVILLE POWER ADMINISTRATION (BPA) / Electronic Form Approved by Forms Mgmt. 04/22/2011DATA REQUEST
Transmission Services
Please fill out the form completely and email as an attachment to: .BPA F 1210.06e
(04-11)Page 1 of 1 /
U.S. DEPARTMENT OF ENERGY
BONNEVILLE POWER ADMINISTRATION (BPA) / Electronic Form Approved by Forms Mgmt. 04/22/2011DATA REQUEST
Transmission Services
Date:I. REQUESTER INFORMATION
a. Company NameTransmission Service Provider / Reliability Coordinator
Planning Coordinator / Transmission Operator
b. Requester (Name) / c. Job Title / d. Work email address / e. Work Phone Number
I attest that I am not associated with a marketer or market affiliate. / Initials
I attest that I am requesting this data solely for use in ATC or AFC calculations for the Company identified above. / Initials
II. DATA REQUESTED (Check all that apply)
Load forecasts /Additional Information
Unit commitments and order of dispatch / Time Period / FrequencyPower flow models and underlying assumptions
Facility Ratings / Specify more detail
Contingencies (Check all that apply)
A list of Elements
A list of Flowgates
A set of selection criteria that can be applied to the
WECC base case used by BPA
Expected generation outages, additions, and retirements
Expected Transmission additions and retirements
Firm roll-over rights
The following data is available through OASIS or the BPA Website:
· Expected Transmission outages
· Firm Network Integration Transmission Service and non-firm Network Integration Transmission Service (i.e., Secondary Service)
· Firm and non-firm Transmission reservations
· Grandfathered obligations
· Values of TFC and AFC for all Flowgates
· Values of TTC and ATC for all Paths
BPA F 1210.06e
(04-11)Page 1 of 1 /
U.S. DEPARTMENT OF ENERGY
BONNEVILLE POWER ADMINISTRATION (BPA) / Electronic Form Approved by Forms Mgmt. 04/22/2011DATA REQUEST
Transmission Services
· Source and sink identification and mapping to the WECC base cases BPA Transmission Contact Contract Points ListBPA F 1210.06e
(04-11)Page 1 of 1 /
U.S. DEPARTMENT OF ENERGY
BONNEVILLE POWER ADMINISTRATION (BPA) / Electronic Form Approved by Forms Mgmt. 04/22/2011DATA REQUEST
Transmission Services
BPA does not use or maintain the following data:· Any firm and non-firm adjustments applied by BPA to reflect parallel path impacts
· Other services that impact Existing Transmission Commitments
· Values of CBM and TRM for any Path or Flowgate (the value of CBM and TRM is zero for all Paths and Flowgates for all time periods)
III. BPA USE ONLY
a. Date Received / b. Assigned To / c. Date Completed
File Code;TM40d Retention; Active + 5 yrs then destroy
[1]
[1] For use by Transmission Service Providers Only; NERC ATC Reliability Standards; MOD-001-01 R9.