AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-342

TO: ALL AT&T INSTALLATION SUPPLIERS Date: 06/01/2016

EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract

Submitter’s Name: Ed Williamson

TP: TP76300 Subject: Formed Cable Action: Add: Modification: Delete:

Section: J Section Title: Cabling

Subsection: 2 Section Title: Cabling Requirements

Subsection: 2.8 Subsection Title: Formed Cable

Prior to Change:

2.8.2 Wiring added to existing formed cable shall be secured at 2-inch intervals.

Post Change:

2.8.2 Internal framework cable bundles shall be secured:

a)  To the framework cable management no more than twelve inches from the entrance to the framework.

b)  At intervals not to exceed twelve inches within the framework.

c)  Formed and dressed to maintain proper cable support, management and bend radius.

Questions relative to this IRCN should be addressed to Serena Kwong at 925-398-0391.

Serena Kwong

Specialist – Technical Process/Quality

Access the TP's on the Extranet Site - https://ebiznet.sbc.com/sbcnebs

Concurred

Area Mgr Eng Network Quality
Implementation Eng & Common Systems Date: 05-17-16

(Mike Cassidy)

Principal-Network Design Engineer (Seismic & Infrastructure) Date: 05-12-16

(Edward M Williamson)

Release Approved

Specialist – Technical Process/Quality Date: 06-01-16

(Serena Kwong)