AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-342
TO: ALL AT&T INSTALLATION SUPPLIERS Date: 06/01/2016
EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract
Submitter’s Name: Ed Williamson
TP: TP76300 Subject: Formed Cable Action: Add: Modification: Delete:
Section: J Section Title: Cabling
Subsection: 2 Section Title: Cabling Requirements
Subsection: 2.8 Subsection Title: Formed Cable
Prior to Change:
2.8.2 Wiring added to existing formed cable shall be secured at 2-inch intervals.
Post Change:
2.8.2 Internal framework cable bundles shall be secured:
a) To the framework cable management no more than twelve inches from the entrance to the framework.
b) At intervals not to exceed twelve inches within the framework.
c) Formed and dressed to maintain proper cable support, management and bend radius.
Questions relative to this IRCN should be addressed to Serena Kwong at 925-398-0391.
Serena Kwong
Specialist – Technical Process/Quality
Access the TP's on the Extranet Site - https://ebiznet.sbc.com/sbcnebs
Concurred
Area Mgr Eng Network Quality
Implementation Eng & Common Systems Date: 05-17-16
(Mike Cassidy)
Principal-Network Design Engineer (Seismic & Infrastructure) Date: 05-12-16
(Edward M Williamson)
Release Approved
Specialist – Technical Process/Quality Date: 06-01-16
(Serena Kwong)