Quality Assurance
REQUIREMENT / YES / NO / N/O / N/A / COMMENT
  1. Verify that the contractor is performing QA/QC checks IAW the contractor’s quality plan and schedule for this service.
/  /  /  / 
Movement Control Operations
  1. Does the contractor provide the necessary personnel and equipment to establish, operate and maintain Movement Control Team (MCT) operations?
/  /  /  / 
  1. Do the personnel assigned to the MCT Ops center have a Secret Clearances? (Validate)
/  /  /  / 
  1. Does the contractor prepare and submit all required reports to the appropriate Government Accountable Officer? (Verify process)
/  /  /  / 
Fixed-Wing Air Movement Control Operations
  1. Does the contractor provide and operate fixed wing air movement control services?
/  /  /  / 
  1. Does the contractor coordinate, track and report fixed wing air movements arrival/departure of to the Government Accountable Officer?
/  /  /  / 
REQUIREMENT / YES / NO / N/O / N/A / COMMENT
  1. Does the contractor provide container, pallet, and cargo handling services to facilitate the loading, offloading, and positioning of cargo in coordination with the appropriate entities?
/  /  /  / 
  1. Does the contractor build cargo pallets IAW air movement specs? (Verify processes)
/  /  /  / 
  1. Does the contractor measure, weigh and record the number of pallets to the Government Accountable Officer? (Validate documentation)
/  /  /  / 
  1. Does the contractor provide personnel proficient in the use of the Government-provided theater movement control systems?
/  /  /  / 
Passenger Terminal Support
  1. Does the contractor provide personnel at the terminal counter to manifest passengers, maintain the flight schedule display board, conduct roll calls, provides baggage pallet placards and escort passengers to the baggage pallet area?
/  /  /  / 
  1. Does the contractor provided cargo handlers build, weigh, and mark baggage pallets appropriately?
/  /  /  / 
Movement Control
  1. Does the contractor support the MCT with equipment and personnel required to establish, operate, and maintain MCTs IAW current missions?
/  /  /  / 
REQUIREMENT / YES / NO / N/O / N/A / COMMENT
  1. Does the contractor provide Movement Control Reports and/or documentation IAW the MCT SOP? (Verify)
/  /  /  / 
  1. Does the contractor perform Area Movement Control Operations IAW the appropriate regulations?
Note: Area Movement Control Operations consists of, but is not limited to: customer service and ITV. Procedures may be updated as the mission dictates. /  /  /  / 
  1. Do the designated personnel working on Movement Control Team missions possess and maintain a Secret SecClearance? (Validate Clearances)
/  /  /  / 
  1. Does the contractor support the designated MCT and Airfield operations IAW the appropriate regulations?
Note: MCT Air Operations for fixed wing will consist of cargo processing. Processing will include validation for airworthiness, cargo documentation, and quality control (QC).
Note: Hazardous materials (HAZMAT) validation will be provided as required per air movement. Cargo processing will include validating cargo for air preparation and QC of cargo documentation. /  /  /  / 
REQUIREMENT / YES / NO / N/O / N/A / COMMENT
  1. Does the contractor inspect and validate cargo for airworthiness and appropriate documentation at originating and terminating cargo sections? (Verify process for inspections)
/  /  /  / 
  1. Does the contractor assist all units transitioning by validating HAZMAT Certification paperwork?
/  /  /  / 
  1. Does the contractor provide personnel and equipment to transport cargo to and from the aircraft?
/  /  /  / 
  1. Does the contractor coordinate with MCT or designated representative for scheduled arrival of cargo? (Verify process)
/  /  /  / 
  1. Does the contractor provide personnel and equipment to transport cargo from the staging area to the aircraft as required?
/  /  /  / 