THE JUNE LAKE VILLAGER MASTER PLAN 2013-2018

  1. ROOM INTERIORS
  2. BEDDING
  3. WINDOW COVERINGS
  4. BLACKOUTS
  5. TERRY
  6. DÉCOR
  7. CARPETS & UPHOSTERY
  8. CASE GOODS
  1. BUILDING EXTERIOR
  2. STAIN SIDING
  3. SCRAPE & STAIN FACIA AND TRIM
  4. REPLACE ALL INDOOR/OUTDOOR CARPET MOTEL
  5. REPLACE AND INSTALL NEW GUTTERS
  6. NEED GUTTERS ALONG 122-124
  7. NEED GUTTERS ALONG FRONT OF OFFICE
  8. NEED GUTTERS ALONG 119-120
  9. NEED GUTTERS ALONG 114-116
  10. NEED GUTTERS ALONG 121
  11. NEED GUTTERS ALONG 127
  1. STAIRS/SIDEWALKS/PATIOS
  2. REPLACE STAIRS AT 124 TO 110-111
  3. REPACE PATIOS AND WALKWAYS
  4. RETILE PORCHES AND WALKS
  5. REPLACE STAIRS TO COURTYARD FROM 109-111
  6. CIRCULAR STAIR ACCESS TO DECK ON 127 –WIND INSTRUMENTS PLAYED BETWEEN 5-7 PM
  1. STORM DRAINS / GROUND WATER
  2. WATER UNDER 119/120 & MOTEL
  3. SUMP PUMP UNDER MOTEL WITH EXTRACTING FAN
  4. REPLACE STORM DRAIN
  5. REMOVE OLD STORM DRAIN ON CRAWFORD
  6. INSTALL FRENCH DRAIN ALONG 119/120 & CRAWFORD
  1. CREATE GUEST LAUNDRY
  2. REMODEL STORAGE SPACE
  3. TWO STACKABLE GAS WASHER/DRYER
  4. TILE FLOOR
  5. REPLACE STORE FRONT DOOR
  6. UPGRADE EXISTING EXHAUST FAN
  1. TREE REMOVAL
  2. LARGE TREE DYING BY ROOM 127
  1. FISH STATION
  2. MOVE FISH STATION TO WHERE TREE WAS
  3. BATHROOM UPDATES
  4. REMODEL BATH 110
  5. NEW PLUMBING/ELECT FIXTURES, INSULATION, DRYWALL, PAINT, TILE FLOOR AND SHOWER, GLASS ENCLOSURE
  6. REMODEL BATH 124
  7. NEW PLUMBING/ELECT FIXTURES, INSULATION, DRYWALL, PAINT, TILE FLOOR AND SHOWER, GLASS ENCLOSURE
  8. REMODEL ROOMS 101-105
  9. INSULATION,DRYWALL,PAINT,FLOORING
  10. CLEAN AND RECAULK ALL BATHROOM SHOWERS AND TUBS
  1. PARKING
  2. NEW CONCRETE PARKING BACK OF 119/120
  3. NEW CONCRETE PARKING SIDE OF 119
  4. INSTALL NEW PARKING DRAIN BEFORE CRAWFORD
  5. ROCK AND CONCRETE RETAINING WALLS & NEW PARKING BELOW OFFICE WITH STAIR ACCESS TO PATIO & ROOMS 110 & 111
  6. NEW CONCRETE PARKING FROM MOTEL TO CRAWFORD
  7. NEW CONCRETE PARKING BY ROOMS 122-127( REFERRED TO AS UPPER PARKING) WITH DRAINAGE SYSTEM
  8. RETAINING WALL & MOVE SIGN INCREASE PARKING
  9. REPLACE ALL ASPHALT WITH CONCRETE AROUND PERIMETER OF PROPERTY TO COUNTY RIBBON GUTTER
  10. WORK WITH CALTRANS ON EASMENT OFFICE AND UPPER PARKING
  1. UTILITIES
  2. REPLACE WATER UNDER MOTEL UNIT
  3. LOSING 1000 GAL WATER/DAY
  4. REPLACE UNDERGROUND WATER TO UNITS 14-18
  5. REPLACE UNDERGROUND WATER TO OFFICE & 127
  6. REPLACE UNDERGROUND WATER TO 119/120
  7. REPLACE UNDERGROUND GAS LINES
  8. GAS REGULATORS ON ALL BUILDINGS
  9. MOVE PROPANE TANKS BEHIND RETAINING WALL BELOW OFFICE
  10. REMOVE TANKS BY ROOM 118 TO INCREASE PARKING
  11. UPGRADE POWER
  12. 600 AMP SWITCH GEAR AT CRAWFORD
  13. INSTALL UNDERGROUND POWER FROM SWITCH GEAR TO OFFICE/MOTEL UNITS 101-112/119-120/AND 122-127
  14. REMOVE POWER AND LIGHT POLES ON PROPERTY
  15. RESEARCH POWER POLE ON KNOLL??
  16. REMOVE OVERHEAD ELECTRICAL LINES
  17. LINES IN CONTACT WITH ROOF
  18. PLACE CABLE AND PHONE LINES UNDERGROUND CONDUIT FOR ROOMS 119/120; OFFICE, 122-127, AND MOTEL
  1. REMODEL OLD PUBLIC LAUNDROMAT TO HANDICAP ROOM 127
  2. REPLACE ROOFING AND SIDING
  3. ROCK WAINSCOTT IN FRONT
  4. HANDICAP PARKING AND ACCESS
  5. ALL NEW INTERIOR
  6. INSULATION, DRYWALL, ELECTRICAL, PLUMBING, ETC
  7. NEW WINDOWS
  8. TILE FLOORS, TILE WALK-IN SHOWER, GRANITE COUNTERS
  9. ELECTRICAL NEEDS SUPPLIED IN CONNECTION 600 AMP UPGRADE
  1. REMODEL ROOM 109
  2. REMOVE ALL INTERIOR DRYWALL/PANNELING
  3. REPLACE ALL WATER AND GAS LINES
  4. COMPLETE ACCORDING TO PLANS SUBMITTED
  5. ROCK RETAINING WALL NW SIDE
  1. PATIO & DECK & COURTYARD
  2. CONCRETE RETAINING WALL AT 121 PARKING FACED WITH ROCK
  3. ROCK RETAINING WALL ALONG ROOMS 123,124, & 109
  4. CONCRETE RETAINING WALL AT ROOM 118
  5. NEW TREES AND SHRUBS
  6. SPRINKLER/DRIP SYSTEM
  7. FIRE PIT
  8. EXPAND DECK OFF ROOM 127
  9. CREATE WALKWAY AND PATIO OFF 110
  10. ACESS TO PATIO FROM FISH STATION
  1. SIGNAGE
  2. MOVE SIGN CLOSER TO OFFICE BUILDING AND OUT OF PARKING AREA
  3. REPAIR SIGN
  4. REMOVE ALL OVERHEAD WIRING
  5. BRING NEW WIRING UNDER SLAB AND UP CONDUIT
  1. CONVERT MANAGERS QUARTERS
  2. TWO ROOMS ACCESSIBLE BY ROOM 126 WOOD DECK
  3. REMODEL EXISTING TWO BED, 1 BATH, AND LAUNDRY ROOM
  1. EXPAND MAIDS LAUNDRY
  2. CREATE ACCESS AND SPACE UNDER PORCH ENTRANCE
  1. OPEN BASEMENT CONVERSION
  2. POTENTIAL TWO MOTEL STYLE ROOMS
  1. HAND RAILS AND GUARDRAILS
  2. NEW GUARDRAIL ALONG PATIO EDGE BELOW ROOM 127
  3. NEW STAIR AND HANDRAIL FROM FISH STATION TO PATIO
  4. NEW GUARDRAIL ON RETAINING WALL UPPER PARKING
  5. NEW GUARDRAIL OFFICE PARKING
  1. WATER DAMAGE 122
  2. PUT BACK TOGETHER FOR RENT
  3. SUBMIT A REMODEL PLAN FOR THIS UNIT