The District Project Safety Officer (DPSO) is responsible for implementing and monitoring the District Safety Assurance Program for all construction contracts.

The DPSO will be familiar with all construction safety provisions, their application, and will advise the Inspector-in-Charge, as necessary, on matters relating to contractor compliance with safety regulations. He The DPSO will assure ensure that the Assistant District Executive-– Construction (ADE-C) is advised of a contractor's repeated failure to comply with the contract safety requirements.

  1. Pre-construction

The DPSO (or designee) should have attended the preconstruction conference, received and discussed the contractor's proposed safety program, identify and discuss any specific safety hazards (confined spaces, fall protection, working over water, etc.) pertinent to the project and recommended any additional safety requirements that were are required.

A US Department of Labor Poster, OSHA3165 (Job Safety and Health:It’s the Law),the Federal Hazard Communications Regulations, the contractor's emergency phone number (after hours contact personnel) , the contractor's safety officer’s name and phone number, and a listing of hazardous materials found in the workplacealong with the location of the Safety Data Sheets (SDS) for these hazardous materials should must be posted on the project bulletin board.

  1. Project Inspection
  1. Project

The Contractor is responsible for project safety.

If you see a major safety issue (life threatening), have the problem resolved immediately or stop work on that operation. If a stop work order is issued, follow up with written notification.

If you see a non-life-threatening safety concern, notify the foreman. If the problem is not corrected the next day, notify the project superintendent. If the problem still exists the next day, call the company's home office and inform the Assistant Construction Engineer/Manager (ACE/ACM). If the situation is not corrected one day after notifying the home office, the Inspector-in-Charge is to notify the ACE/ACM and document these notifications in a PSA, FID or the Master Diary, as appropriate. The ACE/ACM will promptly contact OSHA (see ATTACHMENT for contact information) with the ADE-C's concurrence and provide written notification to the Contractor. DO NOT EXPOSE YOURSELF TO A SAFETY HAZARD.

Subsequent corrective action will be documented and reported to the DPSO. A copy of the report and subsequent corrective action will be part of the permanent project records.

Promote safe practices:

Be safe yourself - show a good example.

Encourage the contractor to hold tool box talks.

Promote safety programs - Department issued hard hat stickers, newsletters, etc.

  1. District

The DPSO will perform periodic safety field reviews of projects during construction. More frequent inspections may be required for those projects having high exposure to hazardous conditions, such as, multiple operations being performed concurrently within relatively confined areas, or construction operations being performed immediately adjacent to areas of public use, or to follow-up on previous findings or reports of fatalities or disabling injuries.

The DPSO will evaluate safety compliance on construction projects. In accordance with Pub 408, Section 107.08, it is the contractor’s responsibility to comply at all times with applicable Federal, State, and local laws, provisions, and policies governing safety and health including Occupational Safety and Health regulations for construction.

The DPSO will provide a verbal report to the Inspector-in-Charge, following up with a written report of his the review, with findings and recommendations. The report should include any corrective action taken by the time the report is prepared.

The DPSO is to perform a follow-up safety review of projects on which fatalities or disabling injuries have occurred to assure ensure that safety related practices and procedures for the project are being performed in compliance with contract requirements and Department procedures.

The DPSO will maintain a log of all reported disabling injuries and fatalities on construction projects, by County, State Route and Segment, Contract Number and, when appropriate, Federal Project Number. The DPSO will log the date of the follow-up review which is made to ensure that safety related practices and procedures for the project are being performed in compliance with contract requirements and Department procedures. For vehicle accidents, the DPSO will also log the date of the notification to the contractor's insurance company.

The District will monitor the performance of the reporting procedures to ensure that the required information relating to fatalities and disabling injuries is being provided in a timely manner. The Inspector-in-Charge is to communicate with the District Traffic Unit to ensure that the Unit receives its copy of each Construction Zone Vehicular Accident Report Form. The Traffic Unit can then report to the Central Office Highway Safety and Traffic Operations Division all motor vehicle accidents and traffic related disabling injuries that occur in the construction zone as described in the Project Office Manual (POM) C.9.13.

If consultant inspection will be utilized on a project, the District will ensure that a copy of the consultant’s safety program containing their safety officer’s or responsible individual’s name and phone number is attached within their consultant agreement in ECMS.

  1. Reports and Notifications
  1. Serious Incidents

The Inspector-in-Charge will report to the DPSO and the ACE/ACM all disabling injuries and fatalities that occur within the project limits of the project signing or within a traffic queue that extends beyond the limits of the project signingto the DPSO.

NOTE: Disabling injuries for this procedure are defined as those that require a doctor's care at the scene of the accident or transportation to a hospital or doctor's office for treatment. Accident victims refusing or deferring treatment or transportation for treatment shall not be reported as a disabling injury.

The Inspector-in-ChargeDPSO will notify the District Construction Office, with instructions to notify the Construction Quality Assurance Section, Bureau of Project Delivery, at (717) 787-5610 and also the County Manager, of about the occurrence of the following special events on Department projects:

  1. Chain reaction collisions of 15 or more vehicles.
  2. Accidents in construction and maintenance work zones resulting in death or disabling injury.
  3. School bus accidents resulting in death or disabling injury.
  4. Accidents involving the release of hazardous materials.
  5. Incidents which cause a major highway to be closed for six or more hours, except for closures for maintenance and construction activities where the public and county have been notified in advance.
  6. Catastrophic events such as a bridge failure.

NOTES: / 1)The Construction Quality Assurance Section is towill notify the FHWA Division Office of these special events by email at .
2)The foregoing is in addition and subsequent to following Emergency Response requirements and procedures for the notification of the Pennsylvania Emergency Management Agency (PEMA) at (717) 783-8150651-2001 when an emergency situation is discovered.
  1. Routine iIncidents and Project Accidents

The District will assure ensure that the Contractor's insurance company is notified of every vehicle accident which occurs at the construction site in accordance with the Procedures procedures found on pagein the POMC.9.14-1:.

The DPSO will maintain a log of all reported disabling injuries and fatalities of the public (not Department or Contractor Personnel) on construction projects, by County, State Route and Segment, Contract Number and, when appropriate, Federal Project Number. The DPSO will log the date of his follow-up review which is made to insure that safety related practices and procedures for the project are being performed in compliance with contract requirements and Department procedures, and the date of the notification to the contractor's insurance company.

Worker's compensation accidents in construction sites which involve contractor employees only, are not to be reported to the contractor's insurance company by the Department.

All accidents and near misses which involve a Department employee or Commonwealth vehicle must be reported, investigated, and appropriate corrective actions must be implemented in a timely manner as described in PennDOT Personnel Information Memorandum (PPIM) 13-156.

Accidents in construction sites which involve a consultant employee are to be reported to the consultant’s safety officer or responsible individual by the District.

The District will monitor the performance of the reporting procedures to insure that the required information relating to fatalities and disabling injuries is being provided in a timely manner. The Inspector-in-Charge is to communicate with the District Traffic Unit to insure that the Unit receives its copy of each Construction Zone Vehicular Accident Report Form so the Traffic Unit can report to the Central Office Highway Safety and Traffic Operations Division all motor vehicle accidents and traffic related disabling injuries that occur in the construction zone as described on pages C.9.13-1 thru C.9.13-4.

  1. Project Safety Meeting

The Inspector-in-Charge is responsible for assuring ensuring that each inspector receives briefings regarding the potential hazards to the inspector's and the contractor workmen's safety and the required safety procedures that are to be followed by the inspector and the contractor for each construction operation to which the inspector is assigned.

The briefings are to consist of an initial briefing (I) and refresher briefings (R) and may include participation in contractor safety meetings as well as in meetings conducted by Department personnel. Participation in the contractor's tool box talks is encouraged.

The initial briefing should be received prior to or within two (2) working days of the inspector's first assignment to the inspection activity on the project.

Refresher briefings are to be received at intervals of approximately two (2) weeks for as long as the inspector is assigned to the activity. More frequent briefings may be required as determined by the Inspector-in-Charge, the DPSO or their supervisors.

A consolidated record of these briefings is to be kept in a book or file marked for identification and traceable by index (or folder X) in the General File System and is to consist of the following format:

Date of Briefing / Type (I or R) &
Subject of Briefing / Signature of Inspector

This documentation will be reviewed by the DPSO as a part of his inspection of the project to determine that adequate precautions are being taken to safeguard the inspectors.

The Contractor is responsible to monitor its own operations to see that it performs in accordance with its written project safety program.The Inspector- in- Charge is to provide written notification to the contractor of unsatisfactory practices that he are observesd or that are brought to his their attention and to document in a PSA, or Master Diary, or other approved source reference, notifications of such unsatisfactory practices and satisfactory resolutions thereof.(For work zone traffic documentation, see page C.9.2-1.)

  1. Child Labor Law

The Fair Labor Standards Act specifies a minimum age of eighteen for any nonagricultural occupation which the Secretary of Labor has declared hazardous, or detrimental to the health and well-being of sixteen and seventeen-year-olds. This minimum age applies even when the minor is employed by his parent or guardian.

The Inspector-in-Charge is to request a birth certificate or certification of age when a violation is suspected. The prime contractor is to be advised, and he must direct removal of any person in violation.

  1. PROCUREMENT NOTE

Occupational Safety and Health Administration (OSHA) regulations pertaining to construction are contained in Federal Regulations for Labor, CFR 29 Parts 1910, General Industry, and 1926, Construction.

These regulations can be obtained in paperback form and/or CD-ROM by purchasing Volume 1, General Industry Standards and Interpretations (Part 1910), and Volume III, Construction Standards and Interpretations (Part 1926), from the Superintendent of Documents, P.O. Box 371954, Pittsburgh, PA 15250are available on OSHA’s website https:/

For details refer to Attachment, page B.4.7-6 (copy of Mail Order Form), however, the prices shown on the form are subject to change. Questions regarding prices, etc., can be answered by calling (202) 512-1800. Specific questions can be addressed by a local OSHA office. See Attachment, pages B.4.7-7 6 thru B.4.7-8 7 for area OSHA offices.

ATTACHMENT

GPO Sales Items

Please Do Not Return This Form to OSHA

Circle the publications you wish, complete the information at the bottom of this list, and send with a check to Superintendent of Documents, U.S. P.O. Box 371954, Pittsburgh, PA 15250, (202) 512-1800. GPO also accepts MasterCard or Visa; fax completed form to (202) 512-2250.

Title 29 CFR Parts 1901.1 to 1910.999

General Industry (revised 7/1/01)

Order #S/N 869-044-00104-7; Cost $55.00

Title 29 CFR Parts 1910.1000 to End

General Industry (revised 7/1/01)

Order #S/N 869-044-00105-5; Cost $42.00

Title 29 CFR Part 1926

Construction (revised 7/1/01)

Order #S/N 869-044-00107-1; Cost $45.00

Name:
Address:

ATTACHMENT

U.S. Department of Labor

Area Offices for the Occupational Safety and Health Administration

Allentown Area Office Philadelphia Area Office

Saucon Valley Plaza U.S. Department of Labor – OSHA

3477 Corporate Parkway, Suite 120 U.S. Custom House, Room 242

Center Valley, PA 18034 Second and Chestnut Street

Telephone: (267) 429-7542 Philadelphia, PA 19106-2902

Telephone: (215) 597-4955

Erie Area Office Pittsburgh Area Office

U.S. Department of Labor – OSHA U.S. Department of Labor – OSHA

1128 State Street, Suite 200 William Moorhead Federal Building, Room 905

Erie, PA 16501 1000 Liberty Avenue

Telephone: (814) 874-5150 Pittsburgh, PA 15222

Telephone: (412) 395-4903

Harrisburg Area Office Wilkes-Barre Area Office

U.S Department of Labor – OSHA U.S. Department of Labor – OSHA

43 Kline Plaza The Stegmaier Building, Suite 410

Harrisburg, PA 17104-1529 7 North Wilkes-Barre Boulevard

Telephone: (717) 782-3902 Wilkes-Barre, PA 18702-5241

Telephone: (570) 826-6538

ATTACHMENT

U.S. Department of Labor

Area Offices for the Occupational Safety and Health Administration

PENNSYLVANIA

Allentown Area

Stabler Corporate Center

3477 Corporate Parkway

Suite 120

Center Valley, PA 18034

Telephone: (267) 429-7542

Erie, PA 16501

Suite 200

1128 State Street

Telephone: (814) 461-1492

Harrisburg, PA 17109

Progress Plaza

49 N. Progress Street

Telephone: (717) 782-3902

Philadelphia, PA 19106

U.S. Custom House, Room 242

Second and Chestnut Street

Telephone: (215) 597-4955

Pittsburgh, PA 15222

U.S. Department of Labor-OSHA

William Moorhead Federal Building, Room 905

1000 Liberty Avenue

Telephone: (412) 395-4903

Wilkes-Barre, PA 18702

The Stegmaier Building, Suite 410

7 North Wilkes-Barre Boulevard

Telephone: (570) 826-6538

U.S. Department of Labor Regional Office

for the

Occupational Safety and Health Administration

REGION III (Washington DC, DE, MD, PA, VA, WV)

U.S. Department of Labor – OSHA

The Curtis Center – Suite 740 West

170 S. Independence Mall West

Philadelphia, PA 19106-3309

Telephone: (215) 861-4900

This page left intentionally blank.

April 2014 Edition