Serco Leisure
RISK ASSESSMENT
It is essential that where risks are not adequately controlled, i.e. further action is identified, a “Risk Reduction Action Plan”, Ref: HSF007 is completed. Refer to Risk Assessment Guidance Notes, Ref: HSF006 for further information.
Site Name: BISHAM ABBEY NSC / Area /Section: ABBEY RECEPTION / Subject /
Activity : WORKPLACE SAFETY - GENERAL
Ref No. / Hazard
(What could cause harm – this may be physical, chemical, biological , psychological etc. ) / Risk of
(What could happen / nature of injury – how might someone be harmed?) / Risk to
(Who might be harmed – directly or indirectly) / Existing Control Measures
(List all relevant controls making reference to all key controls, e.g. elimination of hazard, reduction, isolation, training, PPE) / Likelihood / Severity / Risk Ranking / Further Action
Y / N
25a / Flooring
Walls
Furnishings and fittings
Equipment / Slips, trips, falls
Cuts / Staff, users and visitors /
- Duty Managers Site Inspection Checklist (SQLF039 - new) completed daily to check building is suitable for opening and to highlight cleaning requirements.
- Cleaning Procedure (SLQP035).
- Suggestion and Concern (SAC) Report (SQLF008) available for staff to complete. Form records action taken and completion date.
- Equipment Out Of Order Notice (SQLF009) used to notify people of out of order items.
- Suggestion, Concern and Defect Reporting Procedure (SLQP039).
- Technical and Maintenance Procedure (SQLP060) for planned preventative maintenance.
- Planned Preventative, Reactive and Operational Maintenance Technical Working Procedure (TWP02) and Planned Maintenance Schedule (SLQF085 – new)
- Uneven floors / steps clearly marked with black & yellow tape
25b / Ceiling & Lights / Falling objects Causing cuts, bruises and head injuries, power failure / Staff, Users & Visitors /
- Lights are enclosed with protective guards
- Duty Managers Site Inspection Checklist (SQLF039 - new) completed daily to check building is suitable for opening and to highlight cleaning requirements and lighting failures
- Suggestion, Concern and Defect Reporting Procedure (SLQP039) for faulty lighting
- Signage in place to warn customer that no ball games are to be allowed in the area due to low lighting
- All lights controlled at Reception
25c / Electricity / Electrocution, burns, electric shock caused by Installation Fault, equipment fault, error use / Staff, Users & Visitors / Fixed electrical equipment tested and followed as TWP 05
Portable electrical appliances tested and followed as TWP 16
Suggestion and Comment Report (SLQF008) used by staff to report problems electrical equipment
Out of order sign put on faulty equipment SLQF 009
Visual check of cables and condition of equipment before use
Electrical installation is done by a Qualified person
Electrical distribution boards are secure from unauthorised access
Premises issued with a current certificate of inspection / 1 / 4 / 4 / N
25d / Emergency Exits / Slip, trips, falls, burns, entrapment etc / Staff, Users, Visitors / Emergency lighting to be subject to periodic testing e.g. six monthly
Suggestion, Concern and Defect Reporting Procedure (SLQP039).
Duty Managers daily checks in place (SLQF039)
Records to be maintained of all maintenance, inspections and tests of emergency lighting
Staff work in accordance with TWP04
- All exit routes checked daily by Duty Manager
25e / Fire / Fire / Staff, Users & Visitors /
- See Fire General Risk Assessment
25f / Unhygienic toilet areas / Discomfort
Infection / Users and visitors /
- Daily Toilet Cleaning Check Log created to ensure that all toilets are cleaned daily and inspected every hour and appropriate action taken.
25g / Unhygienic circulation areas / Discomfort
Slips and trips
Infection
Pests / Users and visitors and staff /
- Cleaning Procedure (SLQF035).
- Cleaning Checklists (SLQF015 to 036 amalgamated)
- Cleaning Inspection Record completed by Duty Manager at regular intervals (SLQF039)
- Cleaning Schedule (SLQF038) developed to ensure a regular cleaning regime.
- COSHH Procedures (see risk assessment number 004 and related COSHH Assessments).
25h / Faulty Equipment / Personal Injury from damaged equipment / Customers, Contractors, Staff /
- Suggestion, Concern and Defect Reporting Procedure (SLQP039).
- Duty Managers daily checks in place (SLQF039)
25i / Structural Damage / Personal injury / Customers
Contractors
Staff /
- Emergency Action Plan and Serious Incident Pack in place and staff trained every 6 months
25j / Bomb Threat / Personal injury, fire, structural damage / Customers
Contractors
Staff /
- Emergency Action Plan and Serious Incident Pack in place and staff trained every 6 months
25k / Radiators / Burns/ scalds / Customers
Contractors
Staff /
- Adjustable valves on radiators to help with the temperature.
- Adaptable windows to be open and closed
25l / Theft/ Robbery / Loss of property, physical and verbal abuse / Staff
Contractors
Staff /
- Staff carry radio’s to stay in contact.
- Cashing up procedures
- CCTV in place, with signage.
- See Building and Staff security risk assessment
25m / Hot weather conditions / Heat stroke, dehydration, exhaustion / Staff /
- Drinking facilities provided.
- Windows that open.
- Fans provided when asked for
25n / Cold weather conditions / Hypothermia, ill-health / Staff /
- Heating controlled manually by the individual.
- Uniform provided to include jumpers
Documentation considered when
carrying out this risk assessment: / Comments:
Assessment
Carried
Out By: Nick Gee / Date:July 2017 / Reviewed
By: Craig Philander / Date:July 2017 / Next
Review
Date: July 2018
Ref: HSF004Issue 3 November 2005Page 1 of 4