Mohammad Arshad

Contact.no. +971 50 7938605

Senior Road & Infrastructure Engineer.

Nationality Pakistani

Religion Islam.

Computer Skills MS Office

Date Of Birth September 28, 1971

Language English, Arabic, and Urdu.

Driving License Valid UAE Driving license # 2.

E.mail Address

Summery.

I am a Civil Engineer having 22 years of experience in constrcution and supervision of Roads Highway and infrastructure works,out of which 17 years in UAE, 2 years in KSA and rest of experience in Pakistan. Currently I am working as a Project Engineer with Hill international Inc

(Project Management company) at New Abudhabi Airport project in Abudhabi U.A.E.

Objective

To excess in a suitable position by applying my professional experience and skills and strive towards fulfilling the responsibility assigned to me, I can perform well in my fields, and I assure to uphold my Employer’s quality standards, policies and procedures,I had work with contractor, Consultant & Project Management orgnization in Pakistan, Saudia & U.A.E.

Qualification

B.Sc in Civil Engineering Graduated 1995 fromNED University of Engineering & Technology Karachi Pakistan

Additional Courses

Special courses has been arranged by the HILL International in April 2015. I had completed successfully.

1-Global Anti bribery.

2-Buisness Ethics.

3-Workplace Harassment prevention for Employees.

Roads:Formation / Embankment layers for roads works, Subgrad, Subbase, Aggregate Road base, Wet mix, Prime coat and tack coat, Asphaltic layers(Base course,Binder course,Wearing course), interlock tiles work forfootpath and parking etc.

Infrastructure:Sewerage network, Storm water drainage network, protectionof all existing utilities,future road crossing duct, ICS line, Potable Water line Irrigation line, LV and MV line.

May 2014 to Present.

Hill International Inc (PMC) Abudhabi

Client: ADAC (Abudhabi International Airport Company)

Position: Project Engineer.

Project:Midfield Terminal Landside(New Abudhabi Airport project)

Project value: 420,000000 AED

The project comprise of construction of primery & secondry roads, bridges access to new Midfield terminal building(new Abudhabi airport) including parking for public and airport staff, short term and long term parking. Which covered the 700,000 square meter area, which will be the one of biggest airport in the world.

Construction of primery roads consist on 5.6 Km including elevated structures for bridges.

Construction of secondry roads on grade area consist on 6.112 Km including walkways.

Construction of future landside road near the existing logistic access road for MTB

(Midfield terminal building).

Constructon of new site north enterance via presidential flight road and closer of E10 roundabout.

Construction of precasted inlets, catch basin, manholes and drainage chute for storm water networks.

Construction of elevated exit and enterance ramps to & out of MTB elevated curbs.

In addition project consistroads & infrstructure works, such as, Sewerage line, stormwater & drainage network and potable waterline, structure work for piling work, piers, bridges. The Road structure is composed of 300mm sub grade, 175 mm granularsub base, 150mm Aggregate road base, 90mm Asphaltic Base course and 70mm Asphaltic binder course and 50 mm Asphalt wearing course.

Attending the weekly progress meeting, Quality walk and quality meeting, interface meetingand weekly safety walk and meetings.

January 2012 to May 2014.

Dorsch Consultant Gmbh Abudhabi U.A.E.

Client: ADNOC

Position:Civil / Structure Engineer.

Projects: External Infrastructure work for Package 10 & 12.

The Project comprises of External Roads & Parkings surrounding of the Ruwais Shoping Mall and Family accommodation Building at Package 10 & 12. Laying of gravel mulch and landscaping works arround Ruwais shoping Mall. Installation of parking sheds for the Ruwais shoping Mall parking area.

Inspection & Supervision of roads & infrstructure works, such as, Irrigation line, Sewerage line, stormwater & drainage network and potable waterline, structure work for storm water inlets and sewer manholes, Utility ducts, Dual carriage way Road about 2 km are constructed around the buildings. The Road structure is composed of 30cm sub grade, 20cm sub base, 5cm Asphaltic Base course and 5cm Asphaltic wearing course.

The Project value is 80 million Dirham’s.

May 2009 to October 2011.

Wilbur Smith Associates Alain U.A.E.

Client: Al Ain Muncipality

Position: Road Inspector.

Projects:1- Dualling & Improvement of Traffic safety of Alain-Nahil Road Project.

Project Discription:

The Project comprises of 34km road construction (Al Ain-Nahil Road) which is essentially a road widening project.The works involve construction of 9 Underpasses (new and extensions), Drainage Box Culverts, Gas and Water Lines’ Protection Structures (slabs and culverts) and 34 km of flexible pavement. The road structure is composed of 300mm thick sub-grade, 150mm Agg. Road Base, 80mm BBC and 50mm Wearing Course. Completion time for the project is 24 months.

Duties and Responsibilities:

Inspection of all works, all underpasses, road works, road side concrete barriers, metal beam guard rail, ducts, utility lines (irrigation, water,Electrical & Etisalat.),Supervision of All concrete work such as Guard rail foundation, Road sign foundation.Inspection and supervision of storm water line and irrigation line.

Monitoring the implementation of the works in relation to the approved drawings,
specifications, contract documents and method statements.

Inspection of the Contractors’ day to day operations.

 Liaising with the Engineer on all construction related matters.

 Recording and maintaining accurate contemporary records of site events.

 Ensuring compliance with design and specifications.

Project:2- Upgrading the traffic Movement and intersections in central area of AlainU.A.E

- Project consist on sewerage & storm water network, water line & other services.

- Construction of roads and parking at different location in Al-Ain.

- Inspected Road Works , Utility Ducts, Subbase & Road base and Asphalt pavements.

- Installation of sand fence along the road.

- Construction of catch pits and drainage chute for storm water.

- Relocation of exiting water line 600 dia DI pipe.

- Relocation of exiting irrigation line, 225, 250 & 315 dia Upvc pipe.

- Preparing of Daily & Weekly report for the work.

-Coordinate with contractor,checking RFI, Shop drawing.

After successfully completed of project 1 wilbur smith transfer me to other project.

July 2007 to March 2009.

EllisDon Project Management. Dubai U.A.E.

Client: Nakheel.

Position: Construction Coordinator.

Project: Water front / Badrah, Jumeirah Village (Triangle).

Construction of Infrastructure facilities involving civil and structural works, sewerage & stormwaternetwork,Telephone network, Electricity, Construction of new road & parking areas, Footpath and information signs.

Conduct site meeting, Coordinate with consultant & contractor, checking Shop drawing, RFI, method statement and reviews.

Review construction schedule submitted by contractor. Checking list of activities, sequence of activities, its duration, logical relationship, constraints, lags and leads, resource allocation to meet the contract requirement along with contractual mile stones.

Monitoring and controlling of Project to ensure that the construction complies with all Applicable Codes, Specifications and as per approved Method statement (MST), and Drawings issued for construction.

Carry out regular site tours and quality surveillances on different parts of the work to measure the Contractors' compliance with project requirements and specifications, record the detected quality problems (NCRs) and identify improvement opportunities.

Identify quality problems, initiate and document actions and verifies implementation of solutions, Monitoring Health and Safetyon site.

Preparing Daily & Weekly reports on work progress.

February 2007 to 31 july 2007.

Cansult Limited DubaiU.A.E.

Client: RTA

Position: Civil Inspector

Project: Wafi City Bridge Contract R885/2 Dubai.

Construction of Wafi City Bridge connected to Oud Metha Road

Widening of Oud Metha Road for Health Care City

Inspected Road Works , Utility Ducts, Subbase & Road base and Asphalt.

Reported on the work progress on daily basis

Inspection and supervise the asphalt pavement layer for carriage way

The project covered include the Reinforcement work, Retaining walls, Piers, and concrete work for the bridge.

October 2004 to 31 January 2007-

WS Atkins & Partners Overseas Alain U.A.E.

Client: Al Ain Muncipality

Position: Road Inspector

Project: Maintinance of Roads and bridges in Al Ain-Phase II Zone 1

Maintenance & Rehabilitation of roads & bridges at various locations.

Construction of new roads and parking at different location in AlAin, Al-Quaa, Al-Wagan, Sh.Maktoumpalace& Sh.Tahnoon palace

Inspected Roads,Utilityduct,subgrad,subbase,stormwater,drainage & sewerage system.

Inspection & supevision of asphalt layersfor new and existing roads and parking.

September 2003 to September 2004

Dr. Ahmed Abdul Warith Engineering Consultant AlAin U.A.E.

Position: Site Inspector

Project: Internal Roads and Parking at Qureiyah-II

Construction of carriage way from Jebal hafeet R/A to Mezyed road.

Construction of road and parking at quarraya area, Al Ain.

Inspected & Supervision of roads work, Utility ducts and embankments.

Observed asphalt placement for internal roads and carriageway.

November 2002 to August 2003

Prago Project Engineering Consultants AlAin U.A.E.

Position: Road Inspector

Project: Maintenance of Roads and Parking for (Sh. Zayed palace) Al Maqam.

The projects covered included the roads and parking of various fams for H.H Sheikh Zayed Bin Sultan Al-Nahyan.

Inspected & Supervision of Earthwork, Utility ducts and concrete work.

Observed asphalt pavement layer for roads.

Worked on rain dam project at khatm Al Shikla.

Laying of R.C.pipes 800mm dia.

Inspection of reinforced steel structure work for inlets and outlets pipes.

Reported on the work progress on a daily basesinEnglish.

January 2000 to October 2002

BRICC Company Abu Dhabi AlAin U.A.E.

Position: Civil Engineer.

Project: Development of InternalRoads & Parking in Al Towayya district.

During my stay with BRICC, I have worked on the following projects,

  • Development of internal roads & parkings in Al-Towayya dist- Phase II Alain
  • Widening of Hazzah Bin ZayedRoad in Abu Dhabi.
  • Jabel Underpass Project in Alain.

Worked for the development of the roads in Al Towayya district.

Planned the day to day work and operation.

Supervisethe quality of work as per comply of approved shop drawing & Specification.

Monitored the excavation and establishment of drainage channals, Storm Water, drainage system and varioussplit & future ducts.

Laying of D.I Pipes,1m Diameter for water line network in Abu dhabi.

Worked for the Development of roadsIn Somalia Island.

September 1999 to December 1999

Byinder Insaat Turkish Company Pakistan.

Position: Civil Engineer.

Project: Islamabad Peshawar Motorway Project Pakistan.

Worked as a Civil Engineer for a International Turkish company on theIslamabad-Peshawar Motorway project.

Construction of roads and bridges under the NHA authority,

project involved construction of pipe culvert, retaining walls, slope protection and reinforced concrete work.

To supervised the work for Earthwork, access road & parkings, spillways and rest areas.

Supervisethe quality of work as per comply of approved shop drawing & Specification.

September 1997 to July 1999

Nashie Naffa Al Sehli Establishment,Jeddah K.S.A.

Position: Site Engineer.

Construction of Internal roads and parkings for shoaiba area, Dealing with consultant and governament authorities,

Monitor & coordinate the execution of the project as per specification and contract requirements.

Managing the site operation and road construction material.

Project involved asphalt and heavy civil works, reinforce concrete work, drainage works under ground duct laying.

December 1995 to August 1997

Daewoo Corporation Lahore Islamabad Motorway Project Pakistan.

Position: Civil Engineer.

Project: Lahore Islamabad Motorway Project Pakistan.

Worked with International Korean company on the Lahore Islamabad Motorway project.

Construction of Infrastructure facilities involving civil and structural works for sewerage, storm water, Drainage, Electricity, Street lighting,

Construction of roads pavement, Information sign, pavement marking & protection of existing utilities.

Construction of Motoway from Pindi bhatian Interchange to Salem Interchange.

Prepare the daily report on work progress.