SECTION 221120 - PLUMBING PUMPS

PART 1 - GENERAL

1.1DESCRIPTION

  1. This section describes sump pumps and in-line pumps.

1.2RELATED WORK SPECIFIED ELSEWHERE

  1. Section 220500, Common Work Results for Plumbing
  2. Section 220520, Piping Specialties for Plumbing Piping
  3. Section 220523, General Duty Valves for Plumbing Piping
  4. Section 220529, Hangers and Supports for Plumbing Piping and Equipment
  5. Section 220545, Seismic Restraints for Plumbing Piping and Equipment
  6. Section 220548, Vibration and Seismic Controls for Plumbing Piping and Equipment
  7. Section 220553, Identification for Plumbing Piping and Equipment
  8. Section 221100, Plumbing Piping

1.3SUBMITTALS

  1. For each item specified herein, submit product/material data; shop drawings; operation and maintenance data; as-constructed data; installation, startup, and testing manuals; operation and maintenance manuals; and as-constructed drawings.
  2. Include with product data for each pump: performance curves, motor data, operating weights, and pressure ratings.
  3. Include control information and wiring diagram for packaged equipment.

Use B only if Commissioning Section 019100 is included in the project manual.

  1. For each item specified herein, submit commissioning plan and schedules; checkout, startup, operational, functional and final acceptance test plans, procedures, checklists, and reports; systems manuals; and operator and maintenance training plans.

1.4QUALITY ASSURANCE

  1. Pump impellers shall not be greater than minimum impeller size plus 90 percent of the difference between the maximum and minimum impeller size for pump selected.
  2. Motor shall be non-overloading under all operating conditions.

PART 2 - PRODUCTS

2.1SUMP PUMP

  1. Acceptable Manufacturers: Aurora, Paco, Peabody Barnes, Peerless, Weil, or pre-bid approved equal.
  2. Description: Packaged sump pump, complete including pump and controls; pump with cast iron body and motor housing, cast iron impeller, mechanical seals, stainless steel shaft, and strainer. Provide float operated controls arranged to allow pump operation and high water alarm bell initiation. Provide complete control unit, including starter, float and alarm control. Provide silence switch for alarm bell and contacts for remote alarm point pickup.

2.2DUPLEX SUMP PUMP

  1. Acceptable Manufacturers: Aurora, Paco, Peabody Barnes, Peerless, Weil, or pre-bid approved equal.
  2. Description: Duplex submerged sump pump, complete, including duplex pumps and controls. Provide pump with cast iron body and housing, cast iron impeller, mechanical seals and stainless steel shaft. Provide float operated controls, arranged to allow one-pump operation, two-pump operation and alarm bell operation.
  3. Controls: Provide complete control panel, including starters, lead-lag pump selector, automatic operation of second pump if lead pump fails, and float and high water alarm control. Provide silence switch for alarm bell and contacts for remote alarm point pickup.

2.3IN-LINE CIRCULATING PUMP

  1. Acceptable Manufacturers: Armstrong, Bell & Gossett, Grundfos, Paco, Taco, or pre-bid approved equal.
  2. Description:
  3. Pipe-mounted, integral centrifugal pump and resiliently mounted motor.
  4. Flexible coupling between pump and motor.
  5. Mechanical shaft seals.
  6. Bronze fitted or stainless steel impeller.
  7. Rising head characteristics with decrease in volume.
  8. Drip-proof construction.

PART 3 - EXECUTION

3.1SUMP PUMP INSTALLATION

  1. During construction, provide temporary pumps if evacuation of sump is required. Permanent pumps provided hereunder shall not be used for removal of construction debris.
  2. Install pumps in sumps. Adjust sump level controls for size of sump provided.
  3. Lubricate in accordance with the manufacturer’s instructions before operation.
  4. Support interconnecting piping independently to prevent stresses on casings.
  5. Provide screen over grated openings to duplex sump pump pits to eliminate debris from entering pit.
  6. Provide throttling type of valve with memory stop on discharge side of duplex sump pumps, downstream of outside lever and weight check valves.

3.2IN-LINE CIRCULATING PUMP INSTALLATION

  1. Motor horizontally or vertically depending on normal design of pump.
  2. Provide convenient access to oil cups for servicing and as required by the manufacturer.
  3. Provide flexible connections, strainers, check valve, and shut-off valves on suction and discharge of pumps.
  4. Lubricate in accordance with the manufacturer’s instructions before operation.
  5. Support and isolate circulators.

Choose one of the following two articles. Use Commissioning if Section 019100 is included in the project manual, otherwise use Field Testing.

3.3COMMISSIONING

  1. Commission items specified herein.

3.4FIELD TESTING

  1. Sump Pump: After installation is complete, conduct a test of the system as follows:
  2. Operate complete pump sequence to assure proper operation of pumps with respect to fluid level in sumps.
  3. Confirm proper operation of lead lag sequencing.
  4. Confirm operation of both remote and local alarm devices.

END OF SECTION 221120