SECTION 015639 - TREE AND PLANT PROTECTION

PART 1 - GENERAL

1.1  DESCRIPTION

  1. Provide temporary fencing, barricades, and guards as necessary or required to protect trees which are to remain, from damage above and below grade.
  2. Protect root systems from smothering and compaction. Do not store construction materials or permit vehicles to drive or park within the drip line area of any tree to remain.
  3. Protect all plant growth, including root systems of trees from the dumping of refuse or chemically injurious material or liquids, and continual puddling of running water.

1.2  RELATED WORK SPECIFIED ELSEWHERE

  1. Section 329119, Landscape Grading
  2. Section 328400, Planting Irrigation

PART 2 - PRODUCTS

Not Used.

PART 3 - EXECUTION

3.1  INSPECTION

  1. Inspect all trees and document by written memorandum and photograph any unusual existing conditions. Submit copies to the Port prior to commencement of work.

3.2  FIELD SUPERVISION

  1. The Port must be present during demolition of existing conditions within the drip line of trees to remain.

3.3  GENERAL

  1. Protect root systems of trees to remain from damage due to noxious materials in solution caused by runoff or spillage during mixing and placement of construction materials, or drainage from stored materials.
  2. Protect root systems of trees to remain from flooding, erosion or excessive wetting resulting from dewatering operations and compaction.
  3. Protect all existing trees to remain against unauthorized cutting, breaking, or skinning roots and branches, skinning, and bruising of bark.
  4. Do not allow fires on the project site.
  5. Where cutting seems necessary, review conditions with the Port before proceeding, and comply with its directives.
  6. All tree pruning or root cutting to be performed with sharp pruning instruments; do not break or chop. Do not prune without explicit approval of the Port.

3.4  EXCAVATION AROUND TREES

  1. Excavate within drip line of trees only where indicated on drawings or as approved by the Port.
  2. Where trenching for utilities is required within drip lines, tunnel under or around roots by hand digging or boring. Do not cut main lateral roots or tap roots over 1 inch diameter; cut smaller roots which interfere with installation of new work. Cut roots with sharp pruning instruments; do not break or chop.
  3. Do not allow exposed roots to dry out before permanent backfill is placed; provide temporary earth cover, or pack with peat moss and wrap with burlap. Water and maintain in moist condition and temporarily support and protect from damage until permanently relocated and covered with backfill.

3.5  GRADING AND FILLING AROUND TREES

  1. Maintain existing grade within drip line of trees unless otherwise indicated on the drawing and approved by the Port.

3.6  REPAIR AND REPLACEMENT OF TREES

  1. Repair trees damaged by construction operations as directed by the Port. Make repairs promptly after damage occurs to prevent progressive deterioration of damaged trees.
  2. Remove and replace dead trees and damaged trees which are determined by the Port to be incapable of restoration to normal growth pattern.
  3. Provide new trees of same size (up to 13 inch caliper) as those damaged. Plant and maintain as directed. Species to be selected by the Port.
  4. For trees exceeding replaceable size (over 13inch caliper) the Port shall be compensated on the basis of an evaluation schedule on the damaged trees by a qualified consulting arborist registered with the American Society of Consulting Arborists.

END OF SECTION 015639

6/29/2012 / TREE AND PLANT PROTECTION