RELEASE INTO SERVICE EXPOSITION (RISE)
For
Equipment/ Project Title
DT Reference :MAA Reference: CertATMEQP……
Issue : 1 / Date :
Copy Number:
Holder :
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
RISE EXPOSITION
This Exposition has been prepared by the Military Aviation Authority (MAA)for the guidance of the Release into Service Process (RiSP)[1] Exposition submission.
RA 3134 Air Traffic Management (ATM) Equipment RiSP should be read and understood before completion and submission of this document.
On completion of this form it should be submitted to
Author Signiture......
Name and Post......
Dated………………………
DTL/PTL Signiture......
Name and Post......
Dated………………………
For and on behalf of......
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
LIST OF CONTENTS
LIST OF CONTENTS
PART 1
PROGRAMME DESCRIPTION
PART 2
MAA REGULATORY PUBLICATIONS (MRP) COMPLIANCE
PART 3
ATM EQUIPMENT SAFETY CASE (SC)/ REPORT (SCR)
PART 4
REGULATION AND LEGISLATION REQUIREMENTS
PART 5
DEFENCE STANDARD (DEF STAN)
00-972
PART 6
SAFETY TARGETS
PART 7
EQUIPMENT INTO SERVICE
PART 8
EQUIPMENT RESTRICTIONS
PART 9
SUMMARY
LIST OF ANNEXES
DISTRIBUTION LIST
COPY TO.
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 1
PROGRAMME DESCRIPTION
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
OVERVIEW OF PROGRAMME
1.1A programme overview of the equipment including but not limited to:
- Overview of the programme
- Why the programme exists
- The procurement strategy being used
- Governence arrangements
- ATM Approved Organization Scheme (AAOS)[2] Approval
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 2
MAA REGULATORY PUBLICATIONS (MRP) COMPLIANCE
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
2.1Confirm compliance with all relevant MRP[3].
- List all relevant MRP and state how compliant.
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 3
ATM EQUIPMENT SAFETY CASE (SC)/ REPORT (SCR)
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
3.1Statement[4] confirming DTL/PTL have signed and authorized parts 1-3 of the ATM Equipment SC iaw RA 3132.
3.2Annex parts 1, 2 and 3 of the ATM Equipment SC[5] or the most recent ATM Equipment SCR.
3.3Annex draft of the ATM Equipment SC part 4.
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 4
REGULATION AND LEGISLATION REQUIREMENTS
4.1Detail and evidence of how equipment meets all relevant regulation and legislation requirements.
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
PART 5
DEFENCE STANDARD (DEF STAN)
00-972
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
5.1Detail mapping and evidence showing the equipment is compliant with all parts of Def Stan 00-972[6].
5.2If there are areas of non compliance, additional information and evidence should be provided to show it is still considered safe for ATM use.
5.3Performance
- Detail and provide evidence to show all levels of performance are compliant with the Def Stan.
5.4Safety
- Detail and provide evidence to show the equipment is safe in accordance with Def Stan 00-972.
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 6
SAFETY TARGETS
RISE TEMPLATE / Page 1 of 23RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATE
6.1Detail and evidence showing the equipment has met all of the safety targets.
1 of 23
RELEASE INTO SERVICE EXPOSITION (RISE) TEMPLATEPART 7
EQUIPMENT INTO SERVICE
7.1Provide detail on how the equipment will be brought into service and how personnel will be trained and authorized.
PART 8
EQUIPMENT RESTRICTIONS
8.1Detail any proposed restrictions on the operation of the equipment.
PART 9
SUMMARY
9.1Summary of key areas of exposition and any additional thoughts/comments that are deemed relevant.
LIST OF ANNEXES
Annex A.Title of Document
DISTRIBUTION LIST
Post of recipient
COPY TO.
Indiviual posts
RISE TEMPLATE / Page 1 of 23[1] RA 3134 Air Traffic Management (ATM) Equipment Release into Service Process (RiSP)
[2] As mandated by RA 3100 – Air Traffic Management (ATM) Approved Organization Scheme (AAOS) Application Process and Validity of Approval
[3] MAA Regulatory Publications can be found at
[4]This could include an annex of a letter signed by DTL/PTL
[5]RA 3132 ATM Equipment Safety Case
[6]As mandated by RA 3120 ATM Equipment Standards