Review of Schedule 3.1
Bid and offer validation data

Final

Please return the completed form to:

AEMO Onboarding

Level 2

20 Bond Street

Sydney NSW 2000

This form should not be altered without the prior consent of AEMO.

Table of Contents

SECTION A. Authorisation 2

A.1 REGISTERED Participant Details 2

A.2 Declaration 2

SECTION B. Scheduled and semi-scheduled PLANT Data 3

B.1 DISPATCHABLE PLANT Identification 3

B.1.1 Generating Unit data 3

B.1.2 Scheduled Load Data 4

B.1.3 Scheduled Network Service Data 4

SECTION C. Ancillary Service Generating UNIT/ Load data 5

C.1 Unit Identification 5

C.2 Unit Information 5

Review of Schedule 3.1 - Bid and Offer Validation Data

Error! Unknown document property name. II

SECTION A.  Authorisation

A.1  REGISTERED Participant Details

Registered Participant:[1] ……………………………………………………………………………………………

(full name, eg The First Energy Company Pty Ltd (trading as Energy First))

ABN: ...…………………………………………………………………………………………………

A.2  Declaration

…………………………………………………………………………………………………………

(insert name)

…………………………………………………………………………………………………………

(insert title)

DECLARE that I am authorised by the Registered Participant to request changes to bid and offer validation data on the Registered Participant’s behalf and certify that the contents of this submission are true and correct.

…………………………………………………………………………………. / ……/……/20……
Signature / Date

SECTION B.  Scheduled and semi-scheduled PLANT Data

Please duplicate and complete this section for each:

·  Scheduled / semi-scheduled generating unit (DUID)

·  Scheduled load (DUID)

·  Scheduled network service

In case changes are required to the maximum generation or maximum ramp rate, please indicate the change by including the original values crossed out.

B.1  DISPATCHABLE PLANT Identification

Participant ID
Name[2]
Dispatchable Unit Identifier (DUID)[3]
Maximum generation/load/service[4]
Maximum ramp rate[5]
(MW/Min)

B.1.1  generating Unit data

All aggregated Scheduled Generators and Semi-scheduled Generators, please indicate the maximum generation of each individual generating unit within the dispatchable plant identified in Section B.1. Please indicate the maximum generation by grouping the individual generating units of same maximum generation and specifying the number of individual generating units within each group.

Group Label[6] / Maximum generation / No. of individual units

B.1.2  Scheduled LOAD DATA

All aggregated scheduled loads, please indicate the number of individual loads that have been aggregated within the dispatchable plant identified in Section B.1.

No. of individual units

B.1.3  SCHEDULED Network Service Data

All aggregated scheduled network services, please indicate the number of individual scheduled network services that have been aggregated within the dispatchable plant identified in Section B.1.

No. of individual units

SECTION C.  Ancillary Service Generating UNIT/ Load data

Please duplicate and complete this form for each ancillary service generating unit or load, or for each group of generating units or loads that have the same registration details other than dispatchable unit identifer:

C.1  Unit Identification

Power Station/ load installation name
Generating unit/ load name
Dispatchable unit identifier(s)

C.2  Unit INFORMATION

In case changes to the registration are required for ancillary services, please indicate the change by including the original values crossed out.

Frequency Control Ancillary Services / Service provided (Y/N) / Switching controller (Y/N) / Max market ancillary service Capacity (MW) / Min Enablement Level (MW) / Max Enablement Level (MW) / Max Lower Angle (Deg) / Max Upper Angle (Deg)
Fast Raise Service (RAISE6SEC)
Fast Lower Service
(LOWER6SEC)
Slow Raise Service (RAISE60SEC)
Slow Lower Service (LOWER60SEC)
Delayed Raise Service (RAISE5MIN)
Delayed Lower Service (LOWER5MIN)
Regulating Raise Service (RAISEREG)
Regulating Lower Service (LOWERREG)

C.3  Determination of Ancillary Service Generating Unit Information

Determination of Ancillary Service Generating Unit Information
Please tick appropriate boxes below to indicate the basis on which the changes on the ancillary services generating unit information has been determined, and provide further details where required:
The generating unit design parameters
The services previously provided under an ancillary services agreement
The results of tests
Mathematical modelling of the plant
Other (please describe):

C.4  Controls, Communications and Telemetry Information

Controls, Communications and Telemetry Information /
Please describe the facilities installed to receive dispatch instructions for the enablement of each ancillary service from AEMO’s market systems. For example, how will the plant operator find out when the ancillary services are enabled by AEMO’s market systems? Does the plant operator have access to AEMO’s market systems, or does the plant operator rely on someone else telling them when necessary?
Please describe the control facilities installed for each ancillary service in accordance with the market ancillary service specification, including communications and telemetry, where applicable. For example, are the fast and slow services to be provided by governor systems or under- or over-frequency relays? Are the regulating services to be provided in response to generation setpoints or raise/lower pulses? Is the plant controlled from a location other than the power station to provide these services?
Please identify any generating units with switching controllers that share frequency comparison equipment such that they cannot use separate frequency settings. For example, which generating units (if any) share the same under- or over-frequency relay for initiating the ancillary service response?
Please describe the monitoring and recording facilities installed for each ancillary service in accordance with the market ancillary service specification, including communications and telemetry, where applicable. What is the sampling interval of active power and frequency records?

Review of Schedule 3.1 - Bid and Offer Validation Data

07 March 2016 3

[1] Italicised terms are defined in the National Electricity Rules.

[2] Means: For scheduled and semi-scheduled generation – power station ID

For load – load installation name/ID.

For scheduled network services – name of installation/link.

[3] Means dispatchable unit identifier. For scheduled network service includes the connection point identifier for each terminal node.

[4] Means: For scheduled and semi-scheduled generation – generated.

For load – the maximum load to which the scheduled load may be dispatched.

For scheduled network service - maximum power transfer capability at each terminal node.

[5] Means: For scheduled and semi-scheduled generation – The sum, where applicable, of the maximum ramp rate of each generating unit outlined in B.1.1

For load – maximum ramp rate of the scheduled load.

For scheduled network service - maximum ramp rate of power transfer capability at each terminal

node.

[6] Where possible, the Group Label should align with the naming in the Generator Performance Standards.