ADDENDUM NO. ONE (1) Page 1
REQUEST FOR QUOTATION NUMBER 968-4898
January 31, 2011
COUNTY OF FRESNOADDENDUM NUMBER: ONE (1)ONE (1)
RFQ NUMBER: 968-4898968-4898
Operation and Maintenance of Landfill Gas Collection SystemOperation and Maintenance of Landfill Gas Collection System
January 31, 2011
PURCHASING USE
CJN / G:\PUBLIC\RFQ\968-4898 ADD 1.DOC
IMPORTANT: SUBMIT QUOTATION IN SEALED PACKAGE WITH QUOTATION NUMBER, CLOSING DATE AND BUYER’S NAME MARKED CLEARLY ON THE OUTSIDE TO:
COUNTY OF FRESNO, Purchasing
4525 EAST HAMILTON AVENUE, 2ND FLOOR
FRESNO, CA 93702-4599
Closing date of bid will be at 2:00 p.m., on February 17, 2011February 17, 2011.
QUOTES WILL BE CONSIDERED LATE WHEN THE OFFICIAL PURCHASING TIME CLOCK READS 2:00 P.M.
Quotes will be opened and publicly read at that time. All quotation information will be available for review after contract award.
Clarification of specifications are to be directed to: Craig NickelCraig Nickel, phone (559) 456-7110, FAX (559) 456-7831.
NOTE THE following and attached ADDITIONS, DELETIONS AND/or CHANGES TO THE REQUIREMENTS OF REQUEST FOR QUOTATION NUMBER: 968-4898 AND INCLUDE THEM IN YOUR RESPONSE. PLEASE SIGN AND RETURN THIS ADDENDUM WITH YOUR QUOTATION.
Ø Delete: San Joaquin Valley Air Pollution Control District – Permit Unit: C-3115-2-6
Insert in its place: San Joaquin Valley Air Pollution Control District – Permit Unit: C-3115-2-10 (Included with this document).
Ø To obtain a larger version of the Site Plan - Attachment “B”, please contact Craig Nickel at the Purchasing Division Office (contact information above).
G:\PUBLIC\RFQ\968-4898 ADD 1.DOC / (12/02)
ADDENDUM NO. ONE (1) Page 2
REQUEST FOR QUOTATION NUMBER 968-4898
January 31, 2011
ACKNOWLEDGMENT OF ADDENDUM NUMBER ONE (1) TO RFQ 968-4898COMPANY NAME:
(PRINT)
SIGNATURE:
NAME & TITLE:
(PRINT)
Reference Page 8: Delete (Figure 1), Insert (Attachment “A”) in its place.
Delete (Figure 2), Insert (Attachment “B”) in its place.
Reference Page 9: Delete Attachment B, insert Attachment D in its place.
Delete Attachment C, insert Attachment E in its place.
Reference Page 13, Task 3: Insert “The FST shall also consist of the CH4 destruction as a percentage.” Insert this in line 9 after “completion of the FST.”
Reference Page 14: correct to read, “Semi-annual NSPS/SSM Reports”.
QUESTIONS AND ANSWERS
Q. Can we provide reports?
A. The County can supply reports to the winning bidder if requested. There are many types of reports and they are quite voluminous.
Q. Are there any current compliance issues?
A. The site has LFG migration at GP-35, 36, 37 & GP-39
Phase I unlined (footprint ~ 30 acres), it has been determined during the Evaluation Monitoring Program that LFG from this area has impacted groundwater. It is anticipated the Phase I will be reclaimed within 3 years.
COMMENTS
Flare currently ~1400 scfm.
The Separator and Flame Arrestor were recently cleaned. The Burners were replaced in December 2010.
Current footprint for Phase II ~115 acres
Current footprint for Phase III ~ 34 acres
April 1, 2013 is the deadline for gas collection system placement in Phase III.
AB 32 surface emissions will be the basis of award. If other surface emission monitoring is required, price will be negotiated.
Attached is San Joaquin Valley Air Pollution Control District – Permit Unit Requirements 968-4898 Permit Unit Requirements.pdf (click on this link to download the Attachment).
G:\PUBLIC\RFQ\968-4898 ADD 1.DOC