Configuration Guide for: Real Time Imbalance Energy Offset / Date: 099/17/109
Settlements & Billing
BPM Configuration Guide: Real Time Imbalance Energy Offset
CC 6477
Version 5.32
CAISO, 2018 / Page 1 of 15Settlements & Billing / Version: 5.32
Configuration Guide for: Real Time Imbalance Energy Offset / Date: 099/17/109
Table of Contents
1.Purpose of Document
2.Introduction
2.1Background
2.2Description
3.Charge Code Requirements
3.1Business Rules
3.2Predecessor Charge Codes
3.3Successor Charge Codes
3.4Inputs – External Systems
3.5Inputs - Predecessor Charge Codes or Pre-calculations
3.6CAISO Formula
3.7Outputs
4.Charge Code Effective Dates
1.Purpose of Document
The purpose of this document is to capture the requirements and design specification for a SaMC Charge Code in one document.
2.Introduction
2.1Background
With the implementation of MRTU, the current radial zonal model will be replaced with Full Network Model and Locational Marginal Price (LMP) model, which will also eliminate the use of Zones for the Settlement of Energy transactions. Locational Marginal Prices will be used in principle to settle Energy transactions. Price Locations and Aggregated Price Locations are defined on collections of network nodes. A LMP will be calculated for each Price Location and each Aggregated Price Location.
The Real-Time Market (RTM) is a market for trading Energy and Ancillary Services in Real Time. The bid submission for a given Trading Hour in the RTM is allowed after the Day Ahead Market result publication for the corresponding Trading Day and up to 75 minutes before the start of that Trading Hour. The Real-Time Market processes optimize Energy and Ancillary Services Bids with an objective of satisfying Real-Time Energy needs, mitigating Congestion, allowing resources providing Regulation service to return to preferred operating point within their regulating ranges and allowing recovery of Operating Reserves utilized in Real Time operation.
The Real-Time Economic Dispatch (RTED) is responsible for dispatching Imbalance Energy and Ancillary Services at regular intervals. RTED runs automatically every 5 min, at the middle of each 5-min interval. In addition RTED can be executed manually in Manual or Contingency Dispatch modes. Instructed Imbalance Energy (IIE) resulting from RT dispatched instructions will be calculated by CAISO usually by the end of next Trading Day.
The CAISO calculates and accounts for Imbalance Energy for each Dispatch Interval and settles Imbalance Energy for each Settlement Interval for each resource within the CAISO Control Area and all System Resources Dispatched in Real-Time.
Imbalance Energy consists of following:
IIE - Real Time Instructed Imbalance Energy Settlement (CC 6470) and HASP Energy, Congestion, Loss Pre-Dispatched Settlement (CC 6051)
UIE - Real Time Uninstructed Imbalance Energy Settlement (CC 6475)
UFE - Real Time Unaccounted for Energy Settlement (CC 6474)
2.2Description
Related to Section 11.5.4.2 of the CAISO Tariff, in allocating the non-zero amounts of the sum of IIE, UIE, and UFE, HASP and Real-Time AS Imports Congestion, and DA Virtual Award Settlements in HASP/Real-Time, the CAISO will first compute the Real-Time Congestion Offset (CC 6774) and allocate it to all Scheduling Coordinators based on Measured Demand, excluding demand associated with ETC/TOR/CVR Self-Schedules for which IFM and RTM Congestion Credits were provided.
CAISO will then compute the Real-Time Marginal Cost of Losses Offset and allocate it to all Scheduling Coordinators based on Measured Demand, excluding Demand associated with TOR Self-Schedules for which IFM and RTM Marginal Cost of Losses Credit for Eligible TOR Self-Schedules were provided.
The Real-Time Congestion Offset and the Real-Time Marginal Cost of Losses Offset considers congestion revenues and loss revenues from Virtual Awards, respectively.
To the extent that the sum of the Settlement Amounts for IIE, UIE, and UFE, HASP and Real-Time AS Imports Congestion, and DA Virtual Award Settlements in HASP/Real-Time, less the HASP and RT Energy Congestion revenues computed within Real-Time Congestion Offset (from CC 6774) less the Real-Time Marginal Cost of Losses Offsetdoes not equal zero, the CAISO will assess Charges or make Payments in Real Time Imbalance Energy Offset (CC 6477) for the resulting differences to all Scheduling Coordinators based on a pro rata share of their Measured Demand excluding demand quantity for the valid and balanced portion of TORcontract self-schedules in Real-Time and Net Measured Demand of Load Following MSSs.
For the three allocations above, Measured Demand allocation basis for MSSas specified in the Tariff11.5.4.2 shall be applied.
Neutrality is achieved in the three offset accounts for the non-zero sum of IIE, UIE, UFE and HASP and RT A/S Congestion revenueswhile factoring in the congestion credits and loss credits/charges.
CC6774 will provide neutrality for the congestion portion, while CC6477 will provide neutrality for the remaining balance, through a two bucket allocation approach as described above. CC6774 covers the HASP and RT A/S and Energy Congestion revenuesand factoring in the congestion credits to ETC/TOR holders. CC6477 will cover the sum of IIE, UIE, and UFE less the HASP and RT Energy Congestion revenues and factoring in the loss credits and charges to TOR holders.
3.Charge Code Requirements
3.1Business Rules
Bus Req ID / Business Rule1.0 / This Charge Code shall be calculated and output on a 10-minute Settlement Interval basis.
1.1 / This charge code accomplishes the second and third neutrality adjustments out of three mentioned in Tariff section 11.5.4.2, for the nonzero sum of IIE, UIE, UFE, Real-Time A/S congestion revenues, with congestion credits and loss credits/charges factored in.
1.2 / The second neutrality adjustment, covers the loss portion of the nonzero sum mentioned above, by computing for the Real-Time Marginal Cost of Losses Offset (to be called CAISOSettlementIntervalRTLossOffsetAmount in this charge code) and allocating it to all Scheduling Coordinators based on Measured Demand, excluding Demand associated with TOR Self-Schedules for which IFM and RTM Marginal Cost of Losses Credit for Eligible TOR Self-Schedules were provided.
1.2.1 / The CAISOSettlementIntervalRTLossOffsetAmount is computed as the sum of:
(1) the system-wide net RTM Marginal Loss Assessment to TOR holders having CAISO Agreements, and (2) the Real-Time marginal loss surplus.
1.2.1.1 / For each settlement interval, the CAISO Real-Time marginal loss surplus is the CAISO Day-Ahead Energy marginal loss surplus multiplied by the ratio of (a) (the CAISO Total Measured Demand minus the sum of CAISO Total Day-Ahead Demand Schedules and CAISO Total Day-Ahead Virtual Demand Award) and (b) the sum of CAISO Total Day-Ahead Demand Schedules and CAISO Total Day-Ahead Virtual Demand Award.
1.2.1.2 / The CAISO Real-Time marginal loss surplus can be negative when CAISO Total Measured Demand is less than the CAISO Total Day-Ahead Demand Schedules.
1.3 / The third neutrality adjustment, covers the remainder after subtracting for the congestion and loss portions of the nonzero sum mentioned above. The remainder amount to be called the CAISOTotalRealTimeImbalanceEnergyOffsetSettlementAmount and is allocated to all Scheduling Coordinators based on Measured Demand, excluding Demand associated with the valid and balanced TOR contract Self-Schedules in Real-Time.
1.4 / The first neutrality adjustment, covers the congestion portion of the nonzero sum mentioned above, and is accomplished in another charge code. (Fact)
2.0 / For non-MSS Operators, and for MSS Operators that are not Load following MSSs and have elected gross Settlement,the Measured Demand basis is whatever is already mentioned in the above rules for the second and third neutrality adjustments.
2.1 / For an MSS that have elected Load following or net Settlement, or both, the Measured Demand allocation basis shall be:
for the second neutrality adjustment, their MSS Aggregation Net Measured Demand excluding the valid and balanced demand quantity from contract self-schedules for which IFM and/or RTM TOR loss credits were provided for the relevant Settlement Interval.
for the third neutrality adjustment, MSS Aggregation Net Measured Demand is excluded.
Thesevaluesare calculated in another charge code. (Fact)
3.0 / Measured Demand is defined for this Charge Code as a Scheduling Coordinator’s Measured Demand (for UDCs and MSS entities that have elected for gross settlement) plus net Demand (for net-settled MSS entities) which includes contractual Transmission Loss adjustments, and for RT Exports includes only the Energy types Firm, Non-Firm, Dynamic, UCTG, and Wheeling.
4.0 / The final settlement amount for this charge code to each Business Associate is the sum of each Business Associate’s share or allocation amount from the second and third neutrality adjustment.
4.1 / TOR holders shall not get a share of the allocation amount in the third neutrality adjustment for they are excluded from the Measured Demand allocation basis.
5.0 / The net imbalance amount calculated as (a) the sum of the final Settlement amount for Charge Code 6470, 6474, 6475, 6051, 6053, 6473, 6984minus the (CAISOHourlyTotalHASPEnergyCongestionAmtdh )/6 and the CAISOSettlementIntervalTotalRTEnergyCongestionAmt (from CC 6774) and (b) 6477 in a given trade interval is attributed to rounding and must be output to CC 4989 Daily Rounding Adjustment Allocation.
3.2Predecessor Charge Codes
Charge Code/ Pre-calc NameCC 6470 – Real Time Instructed Imbalance Energy Settlement (IIE)
CC 6475 – Real Time Uninstructed Imbalance Energy Settlement (UIE)
CC 6474 – Real Time Unaccounted for Energy Settlement (UFE)
CC 6051 – HASP Energy, Congestion, Loss Pre-Dispatched Settlement
ETC/TOR/CVR Quantity Pre-calculation
Measured Demand Over Control Area Pre-calculation
CC 6984 – RTM Net Marginal Loss Assessment per CAISO Agreement
CC 6774 – Real Time Congestion Offset
CC 6947 – IFM Marginal Loss Surplus Credit Allocation
RT Energy Precalculation
CC 6013 – Convergence Bidding DA Energy, Congestion, and Loss Settlement
CC 6053 – Convergence Bidding HASP Energy, Congestion, and Loss Settlement
CC 6473 – Convergence Bidding RT Energy, Congestion, and Loss Settlement
3.3Successor Charge Codes
Charge Code/ Pre-calc NameNone
3.4Inputs – External Systems
Row # / Variable Name / Description1 / MSSLoadFollowingExclusionFlag B / MSS Load Following exclusion Flag for Business Associate B.
3.5Inputs - Predecessor Charge Codes or Pre-calculations
Row # / Variable Name / Predecessor Charge Code/ Pre-calc Configuration1 / SettlementIntervalIIEAmount Brthi / CC 6470 - Real Time Instructed Imbalance Energy Settlement (IIE), d is shown in the formulas.
2 / SettlementIntervalUIESettlementAmountBrtuT’I’M’hi / CC 6475 - Real Time Uninstructed Imbalance Energy Settlement (UIE), d is shown in the formulas.
3 / PIRRealTimeUIESettlementAccrualAmount BrtuT’I’M’hi / CC 6475 - Real Time Uninstructed Imbalance Energy Settlement (UIE), d is shown in the formulas.
4 / BA_UDC_SettlementInterval_UnaccountedforEnergy_SettlementAmount BuM’mdhi / CC 6474 - Real Time Unaccounted for Energy Settlement (UFE), attribute m is taken out in the formulas of this current document.
5 / CAISOHourlyTotalHASPEnergySettlementAmth / CC 6051 – HASP Energy, Congestion, Loss Pre-Dispatched Settlement, d is shown in the formulas.
6 / HourlyHASPEnergyCongestionAmtBrth / CC 6051 – HASP Energy, Congestion, Loss Pre-Dispatched Settlement, d is shown in the formulas.
7 / BASettlementIntervalMeasuredDemandMinusBalancedTORLossQuantity_EX_RTM_IMBOFF Bmdhi / Measured Demand Over Control Area Pre-calculation
Note: This value is assumed negative in the current charge code.
Also, attribute m was dropped in the formulas.
8 / CAISOSettlementIntervalMeasuredDemandMinusBalancedTORLossQuantity_EX_RTM_IMBOFF mdhi / Measured Demand Over Control Area Pre-calculation
Note: This value is assumed negative in the current charge code.
Also, attribute m was dropped in the formulas.
9 / CAISOSettlementIntervalTotalRTEnergyCongestionAmtmdhi / CC 6774 – Real Time Congestion Offset, , attribute m is taken out in the formulas of this current document..
10 / BASettlementIntervalRTMNetMarginalLossAssessmentSettlementAmount Bhi / CC 6984 – RTM Net Marginal Loss Assessment per CAISO Agreement
11 / BASettlementIntervalMeasuredDemandMinusBalancedTORDemandQuantity_EX_RTM_IMBOFF Bmdhi / Measured Demand Over Control Area Pre-calculation
Note: This value is assumed negative in the current charge code.
Also, attribute m was dropped in the formulas.
12 / CAISOSettlementIntervalMeasuredDemandMinusBalancedTORDemandQuantity_EX_RTM_IMBOFF mdhi / Measured Demand Over Control Area Pre-calculation
Note: This value is assumed negative in the current charge code.
Also, attribute m was dropped in the formulas.
13 / CAISOHourlyDAEnergyMLS h / CC 6947 – IFM Marginal Loss Surplus Credit Allocation
14 / SettlementIntervalDayAheadEnergy BrtuT’I’M’F’S’hi / RT Energy Precalculation
15 / CAISOTotalHourlyDAVirtualDemandAwardQuantity mdh / CC 6013 – Convergence Bidding DA Energy, Congestion, Loss Settlement
16 / CAISOHourlyTotalVirtualAwardHASPAmount mdh / CC 6053 – Convergence Bidding HASP Energy, Congestion, Loss Settlement
17 / CAISOHourlyTotalVirtualAwardHASPCongestionAmount mdh / CC 6053 – Convergence Bidding HASP Energy, Congestion, Loss Settlement
18 / CAISOHourlyRTVirtualSupplyOrDemandAwardEnergySettlementAmount mdh / CC 6473 – Convergence Bidding RT Energy, Congestion, Loss Settlement
19 / CAISOHourlyRTVirtualSupplyOrDemandAwardCongestionSettlementAmount mdh / CC 6473 – Convergence Bidding RT Energy, Congestion, Loss Settlement
CAISO, 2018 / Page 1 of 15
Settlements & Billing / Version: 5.32
Configuration Guide for: Real Time Imbalance Energy Offset / Date: 099/17/109
3.6CAISO Formula
3.6.1BusinessAssociateRealTimeImbalanceEnergyOffsetAllocationAmountBdhi =
BASettlementIntervalRTLossOffsetAllocationAmountBdhi +BASettlementIntervalRTIEOffsetNeutralityAllocationAmountBdhi
3.6.2BASettlementIntervalRTIEOffsetNeutralityAllocationAmount Bdhi=
(BASettlementIntervalCAMD_RTImbalanceEnergyOffset_BQBdhi* RealTimeImbalanceEnergyOffsetPrice dhi)
3.6.2.1Where
IF
MSSLoadFollowingExclusionFlagB= 1
THEN
BASettlementIntervalCAMD_RTImbalanceEnergyOffset_BQBdhi= 0
ELSE
BASettlementIntervalCAMD_RTImbalanceEnergyOffset_BQBdhi=
BASettlementIntervalMeasuredDemandMinusBalancedTORDemandQuantity_EX_RTM_IMBOFF Bdhi
3.6.2.2Where
IF
CAISOSettlementIntervalCAMD_RTImbalanceEnergyOffset_BQ dhi>0
THEN
RealTimeImbalanceEnergyOffsetPrice dhi=
(-1) * (CAISOTotalRealTimeImbalanceEnergyOffsetSettlementAmount dhi / CAISOSettlementIntervalCAMD_RTImbalanceEnergyOffset_BQ dhi)
ELSE
RealTimeImbalanceEnergyOffsetPrice dhi= 0
END IF
3.6.2.3Where CAISOSettlementIntervalCAMD_RTImbalanceEnergyOffset_BQ dhi=
BASettlementIntervalCAMD_RTImbalanceEnergyOffset_BQBdhi
3.6.2.4And
CAISOTotalRealTimeImbalanceEnergyOffsetSettlementAmount dhi=CAISOTotalRealTimeIIESettlementAmount dhi+CAISOTotalRealTimeUIESettlementAmount dhi +
CAISOTotalUFESettlementAmount dhi+
CAISOTotalHASPEnergySettlementAmount dhi -
CAISOSettlementIntervalTotalRTEnergyCongestionAmthi -
CAISOSettlementIntervalHASPEnergyCongestionAmt dhi-
CAISOSettlementIntervalRTLossOffsetAmountdhi +
[(1/6)*(CAISOHourlyTotalVirtualAwardHASPAmount mdh - CAISOHourlyTotalVirtualAwardHASPCongestionAmount mdh
+ CAISOHourlyRTVirtualSupplyOrDemandAwardEnergySettlementAmount mdh -
CAISOHourlyRTVirtualSupplyOrDemandAwardCongestionSettlementAmount mdh)]
3.6.2.4.1Where
CAISOTotalRealTimeIIESettlementAmount dhi= SettlementIntervalIIEAmount Brtdhi
3.6.2.4.2And
CAISOTotalRealTimeUIESettlementAmount dhi =
(SettlementIntervalUIESettlementAmount BrtuT’I’M’dhi ) +
3.6.2.4.3And
CAISOTotalUFESettlementAmount dhi = BA_UDC_SettlementInterval_UnaccountedforEnergy_SettlementAmountBuM’dhi
3.6.2.4.4And
CAISOTotalHASPEnergySettlementAmount dhi =
(1/6)*CAISOHourlyTotalHASPEnergySettlementAmtdh
3.6.2.4.5
CAISOSettlementIntervalHASPEnergyCongestionAmt dhi=
(1/6)*HourlyHASPEnergyCongestionAmt Brth
3.6.3BASettlementIntervalRTLossOffsetAllocationAmountBdhi=
(BASettlementIntervalMeasuredDemandMinusBalancedTORLossQuantity_EX_RTM_IMBOFF Bdhi* CAISOSettlementIntervalRTLossOffsetPrice dhi)
3.6.3.1WhereCAISOSettlementIntervalRTLossOffsetPrice dhi
IF CAISOSettlementIntervalMeasuredDemandMinusBalancedTORLossQuantity_EX_RTM_IMBOFF dhi>0
THEN
CAISOSettlementIntervalRTLossOffsetPrice dhi =
(-1) * (CAISOSettlementIntervalRTLossOffsetAmountdhi / CAISOSettlementIntervalMeasuredDemandMinusBalancedTORLossQuantity_EX_RTM_IMBOFF dhi)
ELSE
CAISOSettlementIntervalRTLossOffsetPrice dhi = 0
END IF
3.6.3.2Where CAISOSettlementIntervalRTLossOffsetAmountdhi=
{CAISOSettlementIntervalRTMNetMarginalLossAssessmentAmountdhi+[(1/6)*CAISOHourlyDAEnergyMLS h *(CAISOTotalSettlementIntervalMeasuredDemandControlAreaQty dhi–(CAISOSettlementIntervalDADemandScheduleQuantitydhi+ CAISOTotalSettlementIntervalDAVirtualDemandAwardQuantity dhi)) / (CAISOSettlementIntervalDADemandScheduleQuantitydhi+ CAISOTotalSettlementIntervalDAVirtualDemandAwardQuantity dhi )]}
3.6.3.2.1And
CAISOSettlementIntervalRTMNetMarginalLossAssessmentAmount dhi=
BASettlementIntervalRTMNetMarginalLossAssessmentSettlementAmount Bdhi
3.6.3.3CAISOSettlementIntervalDADemandScheduleQuantitydhi=
SettlementIntervalDayAheadEnergy BrtuT’I’M’F’S’hi
WHERE t = “LOAD” or “ETIE”
3.6.3.4CAISOTotalSettlementIntervalDAVirtualDemandAwardQuantity mdhi =
(1/6)*CAISOTotalHourlyDAVirtualDemandAwardQuantity mdh
3.7Outputs
Output ID / Name / DescriptionIn addition to any outputs listed below, all inputs shall be included as outputs.
1.0 / BusinessAssociateRealTimeImbalanceEnergyOffsetAllocationAmountBdhi / Total Real Time Instructed Imbalance Energy Settlement Amount for the CAISO Control Area by Business Associate ID (B) Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
1.1 / RealTimeImbalanceEnergyOffsetPrice dhi / The per unit charge price to be applied to the billable quantity for the Real Time Imbalance Energy Offset ($/MWh).
1.2 / CAISOTotalRealTimeImbalanceEnergyOffsetSettlementAmountdhi / Total Real Time Imbalance Energy Settlement Amount for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
2.0 / CAISOTotalRealTimeIIESettlementAmountdhi / Total Real Time Instructed Imbalance Energy Settlement Amount for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
2.1 / CAISOTotalRealTimeUIESettlementAmountdhi / Total Real Time Uninstructed Imbalance Energy Settlement Amount for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
2.3 / CAISOTotalUFESettlementAmountdhi / Total Unaccounted for Energy Settlement Amount for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
2.4 / CAISOTotalHASPEnergySettlementAmountdhi / Total HASP Energy Settlement Amount for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i).
2.5 / CAISOSettlementIntervalHASPEnergyCongestionAmt dhi / Total HASP Energy Congestion Revenue for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i). ($/MWh).
2.6 / CAISOSettlementIntervalRTMNetMarginalLossAssessmentAmount dhi / Total RTM Net Marginal Loss Assessment for the CAISO Control Area by Trading Day (d), Trading Hour (h) and by Settlement Interval (i). ($/MWh).
3.0 / BASettlementIntervalCAMD_RTImbalanceEnergyOffset_BQ Bdhi / The billing quantity for the RT Imbalance Energy Offset for BA ID B, for Settlement Interval (i) of Trading Hour h of Trading Day (d).
4.0 / BASettlementIntervalRTLossOffsetAllocationAmount Bdhi / The BA’s allocation of RT loss surplus for its relevant specific Measured Demand for Settlement Interval (i) of Trading Hour h of Trading Day (d). This is the first of two components of BusinessAssociateRealTimeImbalanceEnergyOffsetAllocationAmount Bdhi
4.1 / BASettlementIntervalRTIEOffsetNeutralityAllocationAmount Bdhi / The BA’s RT Neutrality Allocation amount assessed at applicable Measured Demand for Settlement Interval (i) of Trading Hour h of Trading Day (d). This is the second of two components of BusinessAssociateRealTimeImbalanceEnergyOffsetAllocationAmount Bdhi. This does not apply to TOR holders, for their Measured Demand associated with valid and balanced contract self-schedules.
4.2 / BASettlementIntervalRTLossOffsetQuantity Bdhi / The BA’s applicable Measured Demand quantity for the distribution of RT loss surplus for Settlement Interval (i) of Trading Hour h of Trading Day (d).
4.3 / CAISOSettlementIntervalRTLossOffsetPrice dhi / The CAISO RT Loss Offset price for Settlement Interval (i) of Trading Hour h of Trading Day (d).
4.4 / CAISOSettlementIntervalRTLossOffsetAmountdhi / The CAISO RT Loss Offset amount to be distributed to applicable Measured Demand for Settlement Interval (i) of Trading Hour h of Trading Day (d).
4.5 / CAISOSettlementIntervalDADemandScheduleQuantity dhi / The CAISO Total Day-Ahead Demand Schedules for Settlement Interval (i) of Trading Hour h of Trading Day (d).
4.6 / CAISOTotalSettlementIntervalDAVirtualDemandAwardQuantity dhi / Total of DA Virtual Demand Awards for all BAs of the CAISO Control Area, for Trading Day d, and Trading Hour h, and Settlement Interval i.. (MW)
4.Charge Code Effective Dates
Charge Code/Pre-calc Name / Document Version / Effective Start Date / Effective End Date / Version Update Type
CC 6477 – Real Time Imbalance Energy Offset / 5.0 / 04/01/09 / 09/30/09 / Documentation Edits Only
CC 6477 – Real Time Imbalance Energy Offset / 5.1 / 10/01/09 / 10/31/09 / Configuration Change Required
CC 6477 – Real Time Imbalance Energy Offset / 5.2 / 11/01/09 / 01/31/11 / Configuration Impacted
CC 6477 – Real Time Imbalance Energy Offset / 5.3 / 02/01/11 / Open / Configuration Impacted
CAISO, 2018 / Page 1 of 15