RCM QA Checklist for: ______(Task Order/Serial No./Asset)

Source Material required for review:

1.  Equipment Asset List

2.  SSI GFI Log

3.  MIL-P-24534A (NAVY)

4.  NFELC PMS Standardization & Policy Guidelines

Quality Assurance Submission
Developer / Date
Quality Assurance / Date
Rework/Revision Required / YES NO
Quality Assurance Re-submission
Comments Incorporated by developer / YES NO
Developer / Date
Quality Assurance / Date
Rework/Revision Required / YES NO
Quality Assurance Re-submission
Comments Incorporated by developer / YES NO
Developer / Date
Quality Assurance / Date
Rework/Revision Required / YES NO

Verified (QA): ______Date: ______

(Signature)

______

(Print Name)

NFELC Program Manager: ______Date: ______

(Signature)

______

(Print Name)

Step / RCM QA Procedure / Verified /
Yes / No /
1.  / Verify all forms 114, 116, 118, 119, 120, 121, 123, 129, and 124 (if applicable) are included in the package. If not, request missing forms from developer.
2.  / Verify dates are current on all forms in both prepared by and revision fields. Format for dates is MM/DD/YYYY, and M/D/YYYY for dates with one numeral in the month or day (should look like 3/17/2010 or 11/2/2010).
3.  / Verify preparers name is listed on all forms. Format for name should be first initial and last name.
4.  / Verify all forms say “ORIGINAL” in revision field.
5.  / Verify all forms say “NONE” in ship class field.
6.  / Verify Sheet numbers (Sh ___ of ___) are filled in properly and formatting is consistent across all forms. Formatting should display as:
SH OF
1 1
7.  / Verify serial numbers on bottom of pages follow the following format: SSI/<Equipment SWAB Number>/<Form Number>/5737-<Page Number>
8.  / Verify font for entries on all forms is Times New Roman size 10, with the exception of page 2 of Form 114 (Functional Block Diagram) which should be Arial size 10.
9.  / All entries in header blocks should be all CAPS.
10.  / Verify all rows on forms line up properly and margins are consistent on each page.
11.  / Verify there is one blank line between new line items on forms.
12.  / Verify Blocks 1, 4, and 7 (SWAB Group Number, Prepared By, and Revision) are left justified and Blocks 2 and 3 (Group Nomenclature and Ship Class) are centered.
13.  / Verify Block 8 on Forms 114 and 118 is centered.
14.  / Verify Block 1 (SWAB Number) on Form 114 is 500, all other forms should have the equipment SWAB number.
15.  / Verify Block 2 on Form 114 is AUXILIARY SYSTEMS, GENERAL.
16.  / Verify Group Nomenclature matches equipment name from GFI Technical Manual Transmittal Sheet and is consistent across all forms.
17.  / Verify continuation pages are listed as continuation of the page that precedes it.
18.  / Verify Functional Block Diagram has directional arrows going in and out of equipment block, and square separating in- and out-interfaces is a dotted line.
19.  / Verify center square in Functional Block Diagram is equipment nomenclature.
20.  / Verify sources of information on Form 116 is in the following format: <TM Number>: <TM Name>; APL: <APL Number>.
21.  / Verify functional failures listed in Block 12 of Form 116 is worded as: “Fails to <function from block 10>.
22.  / Verify description on Form 116 includes the following subsections (in order):
·  Redundancy
·  Protective Devices
·  Safety Features
·  Failsafe or Unsafe Features
·  Condition Indicators
·  Environment
·  Duty Cycle
·  Use Restrictions
·  Special Maintenance Features
23.  / Verify Form 118 matches Form 116, except for Blocks 1 and 2.
24.  / Verify Blocks 8 and 9 on Form 119 matches functions and functional failures listed on Form 116.
25.  / Failure modes listed in Block 10 of Form 119 should be written as adjective + noun.
26.  / Any items marked with an “N” in the Transfer field on Form 116 should be justified on the last page of that form.
27.  / Check answers at the beginning of Form 120 against rationale/justifications on later pages of Form 120 to ensure both show the same answers for the same questions.
28.  / Any rationale/justifications on Form 120 to questions 4, 5, 6, or 7 must address preventive maintenance tasks.
29.  / Any rationale/justifications on Form 120 to question 8 must address failure finding tasks.
30.  / All task descriptions listed on Form 120 must carry over to form 123. Verify all are listed, task names are consistent, and periodicities are consistent.
31.  / Verify all material specifications on Form 121 include SPINs, if available.
32.  / Verify any tasks names and periodicities listed on Form 123 are consistent with Forms 120, 121, and 124, if applicable.
33.  / Forms with as required, spell out “As Required.”
34.  / Wording for periodicities should read “Every 500 miles” or “Every 500 hours of use.”
35.  / Verify Form 129 includes the following maintenance tasks:
·  LU – Install protective covering
·  PM – Inspect idle equipment
·  PM – Cycle systems
·  SU – Prepare for use
36.  / Verify proper spelling and punctuation usage on all forms.

Note:

As applicable, this QA Form will be used when performing quality assurance review for RCM product improvements, as assigned by selected NFELC tasking, where the original RCM package is utilized as a template, or where the product improvement is designed to incorporate pre-generated/approved NFELC templates or updates to the NFELC Standardization & Policy Guidelines.

1 of 3

SSI-F-OPS-NFELC-01V2 09/09/2010