PROGRAM OF COLLOQUIUM ON NEW DEVELOPMENTS OF ROTATING ELECTRICAL MACHINES

Beijing, China

September11th-13th, 2011

TIME / Events / Location
Sept. 11th, 2011 / All day / COLLOQUIUM REGISTRATION
Sept.12th, 2011, AM / Opening & Welcome / Room No. 102 on third floor of Zone 16***
8:30 -9:00 / Chair: Li Ruomei
CNC: Lu Yanchang/ Sun Yutian;
SC A1: Erli Figueiredo/ Oscar Martinez;
Qiu Xiliang (President of HEC and HILEM * )
Invited Papers
Chairs: Erli Figueiredo/Sun Yutian
9:00 -9:20 / Guide for On-Line Monitoring of Turbo-Generators / Dan Zlatanovici
Energy Research and Modernization Institute
Romania
9:20 -9:40 / Overview of Permanent Magnet Wind Generators in China / Tang Renyuan
ShenyangUniversity of Technology
China
9:40 -10:00 / Impact of Auxiliaries Response on the Voltage Ride Through Capability ofSynchronous Generator Power Plants / Luis Díez-Maroto
Universidad Pontificia Comillas
Spain
10:00–10:10 / Official Photo
10:10 – 10:25 / Tea/Coffee Break, Poster Papers
Theme: Asset Management
Chairs: Robert Fenton/Wang Xiangheng
10:25 – 10:45 / Temperature of turbo-generator stator strands / Yasunori Satake
Hitachi
Japan
10:45 – 11:05 / Thermal analysis of Large Hydro-Generatorbased on a multi-physic approach / Mohamed Chaaban
IREQ-Institut de Research d’Hydro-Québec
Canada
11:05 – 11:25 / Methods for Fixation of the Rotor WindingOverhang of Large AsynchronousHydrogenerators / F.Ramsauer
Andritz Hydro GmbH
Austria
11:25 – 11:45 / Improvement and Optimization of Vibrationand Noise Performance of Unit 15~18 forRight Bank Power Station of TGP / He Jianhua
Dongfang Electric Machinery Co., Ltd
China
11:45 – 12:05 / Generator Stator Bar Deterioration due toVibration Sparking and Partial Discharge / William Moore
National Electric Coil
USA
12:05 – 13:00 / Lunch / Dining hall on first floor of Zone 16***
Sept. 12th, 2011, PM / Theme: Refurbishment, Upgrading, Life Assessment, Extending LifeCycle of Aged Generators
Chairs: Erli Figueiredo/Yuan Jianhua / Room No. 102 on third floor of Zone 16***
13:00 – 13:20 / Refurbishment Model of Turbine Generatorin Nuclear Power Plant / Akitomi Semba
Hitachi
Japan
13:20 – 13:40 / Experience with the Turbine Generator LifeCycle Management Process / G.C. Stone1 , J. Stein 2
1-Qualitrol - Iris Power - Canada
2-EPRI – Electric Power Research Institute-USA
Theme: Effect of Power System Disturbances on Turbogenerators
Chairs: Oscar Martinez/Chen Chen
13:40 – 14:00 / Nonlinearity of Torsional Damping and itsEffect on SSR Characteristics of Turbine-Generators / Xiaorong Xie1 , Xiaoliang Dong 2
1-TsinghuaUniversity - China
2-Northeast Dianli University - China
14:00 – 14:20 / Effect of Automatic Reclosing on theTorsional Fatigue Life Expenditure ofTurbine-Generator Shafts / Wang Xitian
ShanghaiJiaotongUniversity
China
Theme: Modeling and Testing
Chairs: Remi Tremblay/ Zhu Yuanchao
14:20 – 14:40 / Detailed On-Site Measurements to ValidateGenerator Numerical Modeling / Claude Hudon
IREQ
Canada
14:40 - 15:00 / Methods for Inter Coil Short Circuit DetectionIn Exciting Windings Coils ofTurbogenerators In Operation and InStandstill Condition / Josip Polak
Koncar – Institut za Elektrotehniku
Croatia
15:00 – 15:20 / Tea/Coffee Break, Poster Papers
Theme: Modeling and Testing
Chairs: Remi Tremblay/ Zhu Yuanchao
15:20 - 15:40 / ExperienceWith Acoustic Emission Monitoring Of Stator Winding Delaminations During Thermal Cycling Testing / H. Zhu
Powertech Labs Inc.
Canada
15:40 - 16:00 / Simulation Test and Research onEvaporative Cooling of Hydrogenerator forTGP (Underground) / Liao Yigang
Dongfang Electric Machinery Company
China
Theme: Design and Development of Wind Generators
Chairs: Arkadiusz Biernacki/Miao Lijie
16:00 - 16:20 / 2G HTS Wind Turbine Generators / Ya.B. Danilevich1 , Li Weili 2
1-Institute of Silicate Chemistry of RussianAcademy of Sciences -Russia
2-Harbin University of Science and Technology -China
16:20 – 16:40 / Modeling and Simulation of Direct-coupled Permanent Magnet Wind Generators System with Maximum Power Point Tracking Control Using Simplorer / Sun Shumin 1 , Du Jinhua 2
1-Shandong Electropower Research Institute China
2-Xi’an JiaotongUniversity -China
16:40 – 17:00 / Design of Permanent Magnet Wind Generators with Fractional Slot Concentrated Winding / Tang Renyuan
ShenyangUniversity of Technology
China
17:00 – 17:20 / The Development of 5MW Off-shore Direct-drive wind turbine generator / Lei Xiangfu
Xiangtan Electric Manufacturing Corporation
China
17:20 – 17:40 / Brushless Excitation System 2G HTS Wind Turbine Generator Based On Topological Generator (Flux Pump) / Yu.F. Antonov
Institute of Silicate Chemistry of RussianAcademy of Sciences
Russia
18:00 – 21:00 / Dinner offered by HEC / Dining hall on first floor of Zone 16***
Sept.13th, 2011, AM / Theme: Development and Experience with New Monitoring and
Prognosis Systems
Chairs: Dan Zlatanovici /Shen Liangwei / Room No. 102 on third floor of Zone 16***
8:30 -8:50 / On-line PD Monitoring System with Microstrip Antenna for Rotating Machines / Hiroshi Sako
Mitsubishi Electric Corporation
Japan
8:50 – 9:10 / The Conditional Diagrams Between the Electric Generator and the Electric Grid to which it is Connected / Rodica Zlatanovici
ICEMENERG – Energy Research and Modernization Institute
Romania
9:10 -9:30 / A Novel Online Diagnosing Technique of Rotor Turn-to-Turn Short Circuit of Large Turbine Generator / Zhang Zhengping
Power Science Institute of Guangdong Power Grid
China
9:30 – 9:50 / Tea/Coffee Break, Poster Papers
Theme: New Developments in Machine Design and Insulation Materials
Chairs: Trevor Stokes /Liu Gongzhi
9:50 – 10:10 / The Design and Operation of 700MW Class Totally Air-Cooled Hydroelectric Generators / Sun Yutian
Harbin Research Institute of Large Electrical Machinery
China
10:10 -10:30 / Technical Characteristics of 1100MW Nuclear Power Generator Designed by Shanghai Generator Works / Wang Tingshan
Shanghai Electric Power Generation Equipment CO
China
10:30 – 10:50 / The developing road of HEC Turbine generator / Shen Liangwei 1 , Jiao Xiaoxia 2
1-Harbin Research Institute of Large Electrical Machinery
2-Harbin Electric Machinery Company -China
10:50 -11:10 / Recent Technologies for Hydro Generators and Generator-Motors / Toru Kubo
Toshiba
Japan
11: 10 – 11:30 / Calculation of Electric Field and Design of Internal Shielding Structure for Conductor in Stator Bar of 1000MW Turbo-Generator / Sun Liang 1 , Yuan Xiaohong 2
1-Harbin University of Science and Technology
2-Harbin Research Institute of Large Electrical Machinery
China
11:30 – 11:50 / The Development of Insulation Materials / Lu Chunlian, Man Yuguang
Harbin Research Institute of Large Electrical Machinery
China
11:50 – 12:10 / Comprehensive Risk Evaluation for Chemical Materials Applied to a Turbine Generator, and the Comprehensive Chemical Risk Comparison between Different Generators / Hiroshi Hatan
Toshiba
Japan
12:10 – 13:00 / Lunch / Dining hall on first floor of Zone 16***
Sept.13th, 2011, PM / 13:00-17:00 / Visiting Forbidden City**
18:00-21:00 / Buffet / Dining hall on first floor of Zone 16***

(*)HILEM - Harbin Research Institute of Large Electrical Machinery; HEC - Harbin Electric Machinery Company Limited.

(**)This activity is afforded by the organizer of the meeting

(***) Jiuhua Resort & Convention Center, Beijing