Pre-Install Guidelines and Requirements

Thank you for choosing Advanced Beverages for your beverage needs. We appreciate the opportunity to serve you. We know that your time is valuable and we are committed to providing an efficient, professional, timely installation. You have been scheduled for equipment install on ______. In order to meet this commitment date we need the following items to be completed prior to this date:

1.  Installation of RPZ valve – The health code requires that a RPZ valve be installed to prevent any back flow occurring from any failing carbonator. We do not provide this service. A certified plumber must be hired to do this for you prior to installation.

2.  Bar/ Counter Tops:

a.  Should be complete and in place for equipment installation. (Wood tops should be stained/painted and dry, etc.)

b.  If bar top on back side has a downward lip, the placement of the bar top should be flushed 2 feet in order to mount gun holder and gun.

c.  Any holes in bar/counter tops needed for running lines should be predrilled by customer prior to installation date (stainless steel counter tops for valve machine must also have holes drilled prior to installation date).

d.  FRP (fiberglass reinforced plastic) should be installed.

3.  Placement of equipment will need to be arranged in an area close to floor drains.

4.  Drain lines from the equipment are run to the drains. Keep in mind: the closer the better.

5.  Jockey boxes should be installed prior to installation date for proper placement of bar guns.

6.  Beverage dispensing equipment requires a working power source in close proximity to the equipment. Carbonators for the dispensing units utilize water. Therefore, the water must be in working order.

7.  Product for the system will also be set up on the installation date, and payment for product will be required in the form of check, cash, or money order on the date of installation.

An Advanced Beverages representative will make an on site visit to check on the progress of these requirements approximately one week prior to your scheduled date. Our commitment to you is to have your service completed on the day promised.

However, if the prerequisites have not been completed at your location, service will need to be rescheduled. Due to prior commitments with the scheduling of our other customers, the rescheduled date may have a lengthy delay. Please be ready for your installation on the date agreed.

If you know in advance the installation will need to be postponed, please call as soon as possible in order for us to reschedule you with little or no lag time. Please call your Advanced Beverages representative in regards to questions, comments or concerns about these procedures.

We have agreed to install the listed equipment:

Type / # Units / Install Time
12 Button Gun
Gun Holders
Cold Plates
Racks
Pumps
QCDs
Carbinators
Tubin
Regulators
T Joints
Oetikers Clamps
Input Fittings
RPZ Fittings
Misc. Items
Totals

You have agreed to carry the listed product flavors:

I have read and understand the above information

Signed:

Name Printed:

Bar Name:

Date:

Advanced Beverages and Bar Supplies, Inc.

2403 Walnut Ridge • Dallas, Texas 75229 • Ph: 972.488.9339 • Fax: 971 488-3010

www.advancedbeverages.com