PLUNGER LIFT OPTIMIZATION SEMINAR
8:00 A.M.TO 5:00 P.M., May 16-20, 2005
Holiday Inn
401 Broad Street
WICHITA FALLS, TEXAS
Dear Sir:
Echometer Company is offering a five-day Plunger Lift Optimization seminar to be held in Wichita Falls, Texas on May 16-20, 2005. All artificial lift methods used for deliquification of liquid loaded gas wells will be discussed during the seminar with emphasis on new Echometer technology for analyzing, troubleshooting and optimizing plunger lifted wells. The seminar will cover how to use acoustic measurements to: identify liquid loading in gas wells, determine how much production is restricted due to back pressure on the formation and identify downhole problems and failures. Data collected using the Echometer Well Analyzer and TWM software will be evaluated throughout the seminar. An outline and schedule of the seminar is enclosed.
Updated and new software will be distributed at this seminar. Many of you have contributed to the development of this software. We appreciate your help.
The course is free of charge and attendance is limited to the first 50 registrants. To enroll in the course, please return the enclosed registration card. Or, register by fax to 940/723-7507 or by E-mail to .
Please contact me if you desire additional information regarding the seminar. We will have classroom instruction as well as field demonstrations.
NOTE: FOR HOTEL RESERVATIONS, A BLOCK OF ROOMS IS RESERVED AT THE HOLIDAY INN FOR THOSE ATTENDING THE PLUNGER LIFT OPTIMIZATION SEMINAR. THE RATE IS $72 PER NIGHT. THE HOTEL PHONE NO. IS 940-766-6000. PLEASE REFERENCE “EMC” WHEN MAKING RESERVATIONS WITH THE HOTEL TO RECEIVE THE SPECIAL RATE. THE BLOCK OF ROOMS WILL BE AVAILABLE UNTIL MAY 2, 2005.
Best wishes,
Jim McCoy
ECHOMETER COMPANY
5001 DITTO LANE WICHITA FALLS, TEXAS 76302 USA
PHONE: 940/767-4334 FAX: 940/723-7507 E-MAIL:
Please enroll the following in the Wichita Falls Plunger Lift Optimization Seminar
Name______Phone ______
Company ______Address ______
City______State______Zip Code ______
Fax______E-Mail ______
Please indicate which days you will attend:
All Sessions Tuesday Thursday
Monday Wednesday Friday
Will you bring your Well Analyzer equipment? If so, please indicate below and include serial numbers.
Well Analyzer______Computer ______
Remote Fire Gun ______Pressure Trans. ______
Compact Gas Gun ______Horseshoe Trans. ______
Polished Rod Trans.______Power Probe ______
PLUNGER LIFT OPTIMIZATION SEMINAR
May 16-20, 2005
Holiday Inn - 401 Broad Street - WICHITA FALLS, TEXAS
ECHOMETER SEMINAR OUTLINE
Monday - 8:00 A.M. to 5:00 P.M.
Introduction
Check-in equipment for testing, repair, upgrade and calibration
Overview of TWM software and Well Analyzer
Acoustic liquid level depth determination
Bottom hole pressure determination, well production and inflow performance
Downhole anomalies in gas lift and flowing gas wells
Advanced processing of acoustic records
Analysis of acoustic data from field measurements
Tuesday - 8:00 A.M. to 5:00 P.M.
Introduce and recognize gas well liquid loading
Introduce popular method to remove liquid loading
Velocity string - use of critical velocity and Nodal Analysis
Types of compression
Plunger lift operation and considerations
Beam pumping gas wells
Gas lift in low pressure wells
Hydraulic pumping for gas well dewatering
Injection systems, foaming, effects of foam, and soap sticks
Care and maintenance of wellhead attachments and transducers
Wednesday - 8:00 A.M. to 5:00 P.M.
New plungers and operational techniques using plungers
Programmed acquisition of acoustic liquid level data
Field demonstration of pressure transient testing and liquid level tracking
Downhole gas separators
Timer control of beam pumped wells
Introduce new Echometer Plunger Lift Analysis System
Thursday - 8:00 A.M. to 5:00 P.M.
Plunger tracking – acoustic determination of fall velocities
Monitoring the plunger lift cycle
Know at all times where the plunger is
When does the plunger reach the bumper spring
Determine appropriate shut-in time, plunger arrival time and plunger fall time
Breakout sessions and special topics
Friday-8:00 A.M. to 12:00 Noon
Use of predictive rod pumping programs
TWM utilities, pumping unit database, report printing, data management, etc.
Troubleshooting Well Analyzer
Field demonstration of plunger lift analysis
Friday-1:00 P.M. to 5:00 P.M.
Additional field measurements (if requested)
"TWM", the Windows® based Well Analyzer software will be used as the primary teaching tool during the Well Analyzer seminar. Additional support will be available outside of normal class hours.
ECHOMETER COMPANY 5001 DITTO LANE WICHITA FALLS, TEXAS 76302 USA
PHONE: 940/767-4334 FAX: 940/723-7507 E-MAIL: