ENQUIRY SHEET FOR SONIC POWER SYSTEM

1. Equipment - Water Tube Boiler

  1. Manufacturer’s Name - ______

3. Evaporation Capacity - ______

4. Type of Fuel - Coal/L.S.H.S. Oil/ Furnace Oil/Bagasse /Rise husk

/waste products

  1. Constructional -

Details

A) For Super Heater Zone

1)Size of tube ______

2)No. of coils ______

3)No. of steam soot blowers ______

4)Tube pitch ______mm

(Triangular / square)

5)Water wall - Yes/ No.

If Yes

Tube Size -

Tube Pitch -

B) For Boiler Bank Zone

1)Tube Size =

2)Tube Pitch =

3)Tube Length =

4)Flue Gas temp. Inlet ______Deg. C.

Outlet ______Deg. C.

5)No. of passes = ______

6)No. of Steam Soot Blowers ______

7)Water wall in Boiler bank Zone = Yes/ No.

If Yes - Tube Size –

Tube Pitch –

8)General Arrangement Dimensional drawing

C) For Economizer

1)Size of Tube ______mm

2)Tube pitch ______mm

(Triangular /square)

3)No. of coils ______Nos.

4)Tube length ______Mtrs.

5)Tube arrangement - Plain/ Spiral Fins/ Casted Fins

6)Gas flow - Top to bottom / Bottom to top / Two pass

7)Gas Inlet Duct from - Top / Side/ Bottom

Gas Outlet duct from - Top / Side / Bottom.

8)No. of Steam Soot Blowers –

9)Gas Temp. – Inlet Degree C.______

- Outlet Degree C._____

10)Water Temp. – Inlet Degree C._____

-Outlet Degree C._____

11)G. A. Drawing/ Sketch. –

D) For Air Heater

1)Flow of Gases = Through the tube / Outside the tube

2)Size of tube =

3)No. of Tubes =

4)Tube Pitch =

5)Tube length =

6)Flue gas flow = Top to Bottom / Bottom to Top / Two pass

7)Flue gas Inlet Duct – From Top / Side

8)Flue gas Outlet Duct – From Top / Side.

9)Flue gas temp. Inlet ______Degree. C.

Outlet ______Degree C.

10)Clean Air Temp. Inlet ______Degree C.

Outlet ______Degree C.

11) G. A. Drawing / Overall dimensions / sketch –

12) Customers name & address -

ENQUIRY SHEET FOR SONIC POWER SYSTEM

Equipment type : Smoke tube package Boiler

Fuel used = Oil / Coal / Agro waste

Evaporation Capacity = TPH

No. of passes = ______

Tube Size = ______

Tube length = ______

Flue gas temp. –

At the end of IInd pass ______Degree C.

At the end of IIIrd pass ______Degree C.

At the end of IVth pass ______Degree C.

Stack temp. with clean boiler ______Degree C.

After two months ______Degree C.

Economizer after boiler - Yes/ No.

Fuel consumption ______day.

Door arrangement – Two door / Single door.

G. A. drawing

Customers name & address –

ENQUIRY SHEET FOR SONIC POWER SYSTEM

* Equipment type Bag house/ Dust Collector.

* Application

* Manufacturer’s Name

* Present Cleaning System

* Pressure drop

A)Minimum

B)Maximum

C)Allowable / designed

* Nature of Dust

* Gas flow m3/hour

* Dust load gm/m3

* Filter Bag material

* Filter Bag Size

A)Dia

B)Length

C) No of Bags.

* Gas Temp. - Inlet

- Outlet

* General arrangement drg

with overall dimensions

* Specific requirement if any

ENQUIRY SHEET FOR SONIC POWER SYSTEM

* Equipment type BINS / HOPPERS

* Application

* Manufacturer’s Name

* Present Cleaning System / Time cycle

* Pressure drop

a)Minimum

b)Maximum

c)Allowable / designed

* Nature of Dust

* Gas flow m3/hour

* Dust load gm/m3

* Collecting / Emiting electrode material

* Gas Temp. - Inlet

- Outlet

* General arrangement drg

with overall dimensions

* Specific requirement if any

1