ENQUIRY SHEET FOR SONIC POWER SYSTEM
1. Equipment - Water Tube Boiler
- Manufacturer’s Name - ______
3. Evaporation Capacity - ______
4. Type of Fuel - Coal/L.S.H.S. Oil/ Furnace Oil/Bagasse /Rise husk
/waste products
- Constructional -
Details
A) For Super Heater Zone
1)Size of tube ______
2)No. of coils ______
3)No. of steam soot blowers ______
4)Tube pitch ______mm
(Triangular / square)
5)Water wall - Yes/ No.
If Yes
Tube Size -
Tube Pitch -
B) For Boiler Bank Zone
1)Tube Size =
2)Tube Pitch =
3)Tube Length =
4)Flue Gas temp. Inlet ______Deg. C.
Outlet ______Deg. C.
5)No. of passes = ______
6)No. of Steam Soot Blowers ______
7)Water wall in Boiler bank Zone = Yes/ No.
If Yes - Tube Size –
Tube Pitch –
8)General Arrangement Dimensional drawing
C) For Economizer
1)Size of Tube ______mm
2)Tube pitch ______mm
(Triangular /square)
3)No. of coils ______Nos.
4)Tube length ______Mtrs.
5)Tube arrangement - Plain/ Spiral Fins/ Casted Fins
6)Gas flow - Top to bottom / Bottom to top / Two pass
7)Gas Inlet Duct from - Top / Side/ Bottom
Gas Outlet duct from - Top / Side / Bottom.
8)No. of Steam Soot Blowers –
9)Gas Temp. – Inlet Degree C.______
- Outlet Degree C._____
10)Water Temp. – Inlet Degree C._____
-Outlet Degree C._____
11)G. A. Drawing/ Sketch. –
D) For Air Heater
1)Flow of Gases = Through the tube / Outside the tube
2)Size of tube =
3)No. of Tubes =
4)Tube Pitch =
5)Tube length =
6)Flue gas flow = Top to Bottom / Bottom to Top / Two pass
7)Flue gas Inlet Duct – From Top / Side
8)Flue gas Outlet Duct – From Top / Side.
9)Flue gas temp. Inlet ______Degree. C.
Outlet ______Degree C.
10)Clean Air Temp. Inlet ______Degree C.
Outlet ______Degree C.
11) G. A. Drawing / Overall dimensions / sketch –
12) Customers name & address -
ENQUIRY SHEET FOR SONIC POWER SYSTEM
Equipment type : Smoke tube package Boiler
Fuel used = Oil / Coal / Agro waste
Evaporation Capacity = TPH
No. of passes = ______
Tube Size = ______
Tube length = ______
Flue gas temp. –
At the end of IInd pass ______Degree C.
At the end of IIIrd pass ______Degree C.
At the end of IVth pass ______Degree C.
Stack temp. with clean boiler ______Degree C.
After two months ______Degree C.
Economizer after boiler - Yes/ No.
Fuel consumption ______day.
Door arrangement – Two door / Single door.
G. A. drawing
Customers name & address –
ENQUIRY SHEET FOR SONIC POWER SYSTEM
* Equipment type Bag house/ Dust Collector.
* Application
* Manufacturer’s Name
* Present Cleaning System
* Pressure drop
A)Minimum
B)Maximum
C)Allowable / designed
* Nature of Dust
* Gas flow m3/hour
* Dust load gm/m3
* Filter Bag material
* Filter Bag Size
A)Dia
B)Length
C) No of Bags.
* Gas Temp. - Inlet
- Outlet
* General arrangement drg
with overall dimensions
* Specific requirement if any
ENQUIRY SHEET FOR SONIC POWER SYSTEM
* Equipment type BINS / HOPPERS
* Application
* Manufacturer’s Name
* Present Cleaning System / Time cycle
* Pressure drop
a)Minimum
b)Maximum
c)Allowable / designed
* Nature of Dust
* Gas flow m3/hour
* Dust load gm/m3
* Collecting / Emiting electrode material
* Gas Temp. - Inlet
- Outlet
* General arrangement drg
with overall dimensions
* Specific requirement if any
1