OPERATING:-

  1. On 01.09.17, a meeting with food grains loading parties (Traders) was held at Raipur. During this meeting, various issues pertaining to food grains loading were discussed and solution suggested for improving loading by rail.
  2. On 06.09.17, Cement meeting with all Cement Sidings of Raipur division was held to review each plants performance with regard to their projection given in previous meeting and actual performance. They were apprised with various facilities being extended by railways in improving rail loading and firmly told to stick to the loading projections so that consistency in cement loading can be achieved.
  3. Another meeting was held with Dolomite suppliers of Belha was held on 07.09.17 to assess the potential of dolomite loading in the coming months.
  4. A Safety Review Meeting was held with Sr. Subordinates of Operating department at Raipur on 08.09.17 in which, critical areas identified for improvement and suggestions were made for safe rail operations.
  5. Co-ordination meeting with M/s.IOTL/Lakholi was held on 11.09.17 to assess their requirement and loading potential.
  6. A review meetings was held with NRDA officials in DRM’s Conference Hall on 12.09.17 in connection with progress of works related to construction of New Line between MNDH- NAYA Raipur-Kendri and GAD of station building.
  7. On 22.09.17, Addl.Member(T&C) visited Control office, Raipur, reviewed the performance of the division and gave valuable suggestions for further improvement.
  8. During the month, the overall revenue loading of Raipur division is 2.43 Million Tonnes against 2.67 Million Tonnes of Sep-16 (i.e, -8.99). In terms of EWW, it was 1226 over last year’s 1334 (i.e,-8.10%).
  9. During the month, Wagon Turn round improved by 5.19% (C.Y =1.46, L.Y=1.54).
  10. During the month, Wagon Interchange increased by 3.76% (C.Y=10320, L.Y=9946).
  11. During the month, N/Rake holding improved by 18.18% (C.Y=63, L.Y=77).
  12. During the month, N/Rake turn round improved by 5.88% (C.Y=1.12, L.Y=1.19)
  13. During the month, Jumbo rake turn round improved by 0.95% (C.Y=1.04, L.Y=1.05).
  14. Maintenance Blocks:- The blocks demanded & granted are as under:-

Availed (Sep ’17) / Availed (Sep-16) / % Variation over L.Y
Engineering / 535:35 / 458:40 / 16.77
OHE / 145:10 / 137:00 / 6.96
Machine / 707:50 / 641:10 / 10.40
CON. / 00:00 / 00:00 / -
Total = / 1388:35 / 1236:50 / 12.27
  1. COACHING PUNCTUALITY:-

C.Y L.Y

Overall Coaching Punctuality 99% 100%

Mail/Express trains 99% 100%

Passenger trains 100% 100%

  1. 100% Coaching punctuality: - Achieved for 04 days (i.e on 4th, th, 9th & 18th Sep ‘17).
  2. .During the month the demand to allowed percentage of disconnections was 89.67% (Total demanded 1897 nos. & allowed 1701 nos.)

COMMERCIAL:-

  1. “Swachh Rail Swachh Bharat –Swachha Diwas” Week from 15/09/2017 to 02/10/2017 has been conducted over Raipur Division. Volunteers of various NGOs, Scouts & Guides and kids of Krishna Public Academy, Raipur have participated in “Sharamdaan” at Raipur station.
  2. Extension Counter: An extension counter at Bhilai Power House station has been opened on 23/09/2017.
  3. Additional Counter:- To clear Durga Puja rush during Navratri an additional counter each at Durg & Bhilai Power House stations have been opened from 21/09/2017 to 30/09/2017.
  4. Lease Contracts for leasing of SLRD space : One 05 tons front SLRD by 18211 Durg- JDB Express has been awarded during the month to Shri Sandeep Janghel, Registered lease holder, with expected to fetch estimated revenue of Rs. 52,31,335/-, for a contract period of 05 years.
  5. Publicity and awareness of Durg- NZM HUMSAFAR EXPRESS: On 27/09/2017 Print & Electronic media persons and local civilians were invited at Durg Rly. Station to visit & look the on board features and amenities of Humsafar Express to make publicity and awareness regarding new age facilities/amenities of Durg- NZM HUMSAFAR EXPRESS. The show attracted very good response.
  6. Train & Coaches of FTR: During the month Two special trains and one ACCW, one GS coach & one VPH & one SLR on FTR were booked with additional revenue of Rs. 1.20 Cr. has been collected.

Sl. No. / From – To / Description / Amount (In `)
1 / R-HW / One Spl. Train (FTR) / 27,09,480/-
2 / MXA-NJP / One Spl. Train (FTR) / 88,96,385/-
3 / R-ST / One 3A (FTR) / 2,90,730/-
4 / R-NRJ / One GS (FTR) / 1,89,810/-
5 / Durg - MAS / One VPH & One SLR on Earmark. / 1,17,350/-
  1. Food Plaza at PF No. 01 of Raipur Rly Station was started w.e.f. 23/09/2017.
  2. Folding Ramp facility for Divyang passengers has been provided at Durg Rly. Station to facilitate Divyang passengers to easily enter the coach & get out of it. The facility soon will be spread to other stations of the Division.
  3. Battery operated vehicle for carrying of parcel packages at Raipur & Durg Rly Stations has been awarded during the month.
  4. Work for SBI-IRCTC combined card KISOK has been awarded for two locations at Raipur Rly Station & it will be commenced shortly.
  5. Special drive to arrest unauthorized entry in coaches reserved for disabled persons has been launched from 14/09/2017 to 23/09/2017 to detect unauthorized passengers.
  6. Special drive at pantry in train/static catering units at stations & all important PRS & UTS locations during Durga Puja/Dusshera/Diwali/Chatt has been conducted from 23/09/2017 to 30/09/2017.
  7. An intensive drive in mobile catering units from 15/09/2017 to 30/09/2017 has been conducted.

ENGINEERING:-

  1. Overall mobility index of the division is 83.
  2. New Officers Rest house at WRS, Raipur has been completed with all facilities and opened on 30.09.2017. It contains 10 Rooms (4 Suites & 6 Normal rooms), Cafeteria, 50 seater conference hall, lift, etc.

  1. During the month 5.00 TKm TWR has been done in DN line DGS-BYL section by MFBWP.Total 13.00 TKm TWR has been done by MFBWP upto the month.. Total 2371 AT welds have been removed by 2191 FB welds including 1098 defective AT welds removal.
  2. 186 mtr. boundary wall constructed during the month. Total 1936 mtr. boundary wall constructed upto the month against proportanate target of 1300 mtr.
  3. 03 Nos. damaged AC sheet of BOBY I Shop, WRS has been replaced with galvalume sheet. Total 40 Nos. replaced by taking extra safety measures.
  4. 22 Nos. Turbo ventilators have been fixed in BOBY II Shop, WRS for better circulation of dust, smoke, etc.
  5. 13000 plants by Forest Deptt. & 20205 plants by departmently planted during month. Total 59700 plantation has been completed upto the month.
  6. 58.36 TKm. dressing & boxing has been done during month. Total 186.28 Tkm. has been done upto the month.
  7. 6.62 Tkm. CTR has been done during month. Total 22.65 Tkm. CTR has been done upto the month.
  8. Shoulder screening of 16.78 TKm has been done by FRM during month. Total 55.82 Tkm. has been done by FRM upto the month.
  9. Overhauling of Level crossings 07 of BG section has been done. Total overhauling of 58 LCs has been done up to month against proportanate target of 28 LCs.
  10. 250 Nos. Overhead tanks have been cleaned of BYT, TLD, BIA, DUG, DRZ, Engg. Colony & WRS colony Raipur.
  11. 462 Qtrs. Leaky roofs repairs has been done during month. Total 653 Qtrs. Leaky roofs has been repaired upto the month against proportanate target of 133 Qtrs.
  12. 39 Qtrs. Identified based on survey has been repaired during month. Total 163 Qtrs. has been repaired upto the month against proportanate target of 75 Qtrs.
  13. 436600 sqmtr. Vegetation & Jungle cleaning has been done at BYT, TLD, BIA, DUG, BMY, ENGG, RVH & WRS colony during month.
  14. 500 mtr. drains repaired/improved in TLD, BMY, WRS Yard and 338 mtr. At SLH, RVH & WRS colony during month.
  15. 20 Nos. outstanding final bills & 10 Nos. live contracts bills has been cleared during month. Total 66 final bills & 69 live contracts bills has been cleared upto the month.
  16. 03 Nos. CR (Completion Report) has been drawn this month.
  17. Visual examination of 651 Nos. of fish plated joints on bridge & Yards have been done to avoid rail fracture on rail joints.
  18. Visual examination of 1472 Nos. defective/protected welding joint has been done.
  19. 02 IMR Rail, 01 IMR Weld, 10 DFWR, 03 DFW, 310 DFWO, 32 OBS Rail & 315 OBS Weld have been removed.
  20. 72 Nos. G/J renewals to avoid track circuit failure in main line & branch line.
  21. Gapless of 21 CMS Crossings has been done.
  22. Tongue rail joint welded 01 Nos. for elimination of F/P joint at TLD Yd.
  23. 624 Nos. weld collar painting has been done.
  24. 22.17 TKm. greasing of ERC has been done.
  25. Total 387 Nos. U/S broken PSC ordinary & 101 Nos. U/S broken Xing sleepers has been renewed during month.
  26. 5.00 TKm. TFR has been done.
  27. 546 AT Welds (50% GMT carried, 100 mtr. Bridge approaches & New welds USFD not done) has been protected with joggled fish plates.

ELECTRICAL (TRS)

  1. इस माह मालगाड़ी लोको का निष्‍पादन 190.90 है जो कि रेलवे बोर्ड द्वारा निर्धारित लक्ष्‍य 179.5 से 06.35% अधिक है ।
  2. इस माह कुल 09 लोको का मेजर शेड्यूल (ए.ओ.एच./एम.ओ.एच./आई.ओ.एच./पी.ओ.एच.) निरीक्षण किया गया ।
  3. इस माह कुल 90 लोको का माइनर शेड्यूल (आई.ए./आई.बी./आई.सी. एवं आई.टी.) निरीक्षण किया गया ।
  4. इस माह आर.डी.एस.ओ. मॉडीफिकेशन संख्या SMI/0234 Rev.’0’ के अनुसार लोको संख्‍या 28196 मे दोनो रिवर्सर 1000 एम्‍पियर को बदल कर 1500 एम्‍पियर क्षमता का लगाया गया । इस प्रकार कुल 121 लोको में यह मॉडीफिकेशन पूरा किया गया ।
  5. इस माह आर.डी.एस.ओ. मॉडीफिकेशन संख्या RDSO/EL/0428 Rev0 एफ.बी. क्‍युबिकल पैनल अर्थ फाल्‍ट रिले का स्‍थानांतरण कुल 02 लोको 31305 एवं 31506 मे किया गया ।
  6. इस माह लोको संख्‍या 30206 एवं 30429 में ड्रायवर डेस्‍क ‘A’ पैनल में VCD एक्‍नॅालेजमेंट हेतु ‘BPVG’ लगाया गया । इस प्रकार कुल 06 लोको में यह कार्य पूरा किया गया ।
  7. इस माह 06.95 मैट्रिक टन लौह (Ferrous), 0.815 मैट्रिक टन अलौह (Non-Ferrous) सामग्री स्‍क्रैप करके सामान्‍य भंडार डिपो रायपुर के सुपुर्द किया गया ।

ELECTRICAL (G)

  1. 20 Nos additional fans have been provided at PF No.-1 of Raipur Railway station.
  2. 60 nos existing 20 W CFL reading light fitting replaced by 9W LED Fittings.
  3. 12 nos 250W MH replaced by 90W LED at BYT section.
  4. 07 nos 150W MH replaced by 25 W LED in L/C gates.
  5. 07 No new 450 mm Exhaust fan replaced at bogie Section, M/Shop at PP Yard/BIA.
  6. 07 Nos 1x28W (T-5) TFL fittings replaced by 20W LED lamp.
  7. 23nos conventional regulator replaced by Electronics regulator in staff quarters.
  8. 40 Nos old 40W (T-12) TFL replaced by 1x28W (T-5) TFL fittings in service building over Raipur division.
  9. 400Meter defective cable replaced departmentally at BMY settlement.
  10. IOH of 9 nos. coaches (AC -04No, TL -05 No.) done in coaching depot Durg.
  11. 120 nos. unauthorized connections removed from WRS Railway colonies.

ELECTRICAL (TRD)

  1. Scrap Disposal - Non Ferrous - 1.960 MT.
  2. 6 Nos of leaning mast deficiencies rectified.
  3. 02 Nos Alluminium cross feeder replaced by 150 sqmm copper cross feeder at BYT TSS.
  4. 82 nos Worn out dropper replaced. (22 TKM).
  5. 28 Nos Flashed insulators replaced which was detected during Foot patrolling (Stay-11 Nos, Bkt- 13 Nos & 9-Ton - 4 nos).
  6. 60 nos of RRA clamps checked.
  7. 59 nos X-Jumpers and 279 nos other jumpers checked.
  8. POH of Regulating equipment done- 11 nos.
  9. 22 nos isolators checked.
  10. 630 nos tree branches trimmed.
  11. 129 nos bird nest removed.
  12. 19 nos X-bonds, 65 nos structure bonds & 4 nos continuity bonds provided.
  13. 27 nos 42 KV LA (Failure prone Oblum make) replaced.
  14. 8 nos Gantry maintenance of various switching stations/TSS done (TSS-1, SP-2 and SSP-5).

ELECTRICAL (OP)

  1. सितंबर-17 मे 133.83 चालकदल प्रतिदिन के औसत से 4015 ट्रेन ऑर्डरिंग हेतु विद्युत चालकदल प्रदान किए गए। सितंबर -16 मे 128.47 चालकदल प्रतिदिन के औसत से 3854 ट्रेन ऑर्डरिंग हेतु विद्युत चालकदल प्रदान किए गए थे अर्थात सितंबर-17 मे प्रतिदिन औसतन 05.36 अधिक विद्युत चालकदल प्रदान किए गए अर्थात 04.17 % की बढौतरी हुई।
  2. सितंबर -17 मे रायपुर मंडल के मेंटेनेंस पॉईंटो मे 29 विफल लोकोमोटिव को सुधार कर परिचालन योग्य बनाया गया। सितंबर-16 की तुलना में सितंबर – 17 मे 20.83 प्रतिशत अधिक विफल विद्युत लोकोमोटिव को इन मेंटेनेंस पॉईंटो मे परिचालन योग्य बनाया गया।
  3. सितंबर -17 मे, विद्युत लोकोमोटिव कि सही कार्यरत अवस्था सुनिश्चित करने हेतु, विभाग के मेंटेनेंस पॉईंटो मे 128 लोकोमोटिव का फेरा निरीक्षण किया गया । सितंबर -16 की तुलना में सितंबर -17 मे 8.47 प्रतिशत अधिक विफल विद्युत लोकोमोटिव का इन मेंटेनेंस पॉईंटो मे फेरा निरीक्षण किया गया।

SIGNAL & TELECOM

  1. LC Gate No. 378 at Km. 749/13-15 has been replaced with improved boom locking type gate and commissioned on 15.09.2017
  2. Double wire signal replaced with Motor Operated Signal reversal type at MNDH UP Advance Starter.
  3. Total 02 Nos of Token Less Block Instrument (TLBI) has been replaced/ overhauled at URK (URK/E-RSD) on 20.09.17 & TLD (TLD-HN) on 12.09.17.
  4. Directive maintenance has been done at HN & BIA.
  5. Total 43 Nos. glued joints have been replaced at SLH (01), URK (02), MDH (02), RSD (02), URK-SZB IB (01), Durg (02), G/Cab (01), DPH (28), NPI (03), BYT/West (01), and HN (01).
  6. Total 04 Nos Point machine ground connections replaced at URK (02) and MDH (02).
  7. Total 01 no Motor Point machine with connection has been replaced at URK (68B).
  8. RED LED has been replaced at KMI (01 No of UP GS-1), KYS (S-2), DLBS (S-1), FMY (S-4), DGS (S-10) and BYL (S-6).
  9. Green LED with current regulator has been replaced at KMI (UP Dist.), H/Cab (S-5).
  10. Yellow LED has been replaced at KMI (01 No of Mid Inner Dist), GDZ (S-2), Durg (S-35, S-48 & S-50), BYT (GS-4), ACL Distant, NPI (S-3).
  11. Route LED has been replaced at URK (05), RSD (05), BKTH (05), DGS (01), NPI (01) and BYT (01), HN (01).
  12. Shunt Signal LED has been replaced at P/Cab (01 nos SH-22), FMY (01 Nos of SH-23), BYL (SH-16).
  13. SSDAC unit has been replaced at DLBS (1/2 set), SSDAC Coil replacement at G/Cab (01 No TX and 01 No RX), NPI-DGS IB and SSDAC card replacement at G/Cab (01 No Modem Card), BIA (02 No Modem Card, 01 No MLB1, and 01 No MLB2).
  14. Resistance of Track Circuit (TR & TPR) has been replaced at D/Cab (26T, 45T), FMY (LL1T1).
  15. Motor point replacement with ground connection and multi strand wire has been done at DRZ (Pt. 51).
  16. 03 Nos LC Gate hooters and its units have been replaced at KMI P-Gate (01) and D/Cab gate (02).
  17. Tongue Rail & Stock Rail renewal has been done at HN E/O (Pt. 33A), KMI (1/2 Set of Pt. 34A and ½ set of Pt 43B), BIA (Pt. 33A and 61C).
  18. Cable meggering has been done at BYT/West and HN.
  19. Damaged Booms of Motor Operated LC Gates have been replaced at MDH/West (01 Set), URK/West (01 Set), RVH (02 Set), Sanyasi Para (01 Set), TLD/East (01 Set), Durg Raipur Naka Gate (01 Set), NN Gate (01 set of A boom), Sirsa Gate (1 set ‘D’ boom), KG Gate (01 set of ‘D’ boom).
  20. Total 55 Nos. 200AH secondary cells have been replaced at H /Cabin (55 Nos),Total 08 Nos. 80AH secondary cells have been replaced at Durg (08 Nos) and Total 56 Nos. 40AH Secondary Cells replaced at D/Cabin(04 Nos.), A/Cab (03 Nos.), GDZ (03 Nos), BQR (02 No), FMY (02 Nos), RVH (27 No) and MNDH (15 No).
  21. Insulated Lead wires has been replaced at KMI (50 Mtr), D/Cab (25 Mtr), A/Cab (20 Mtr), H/Cab (60 Mtr), C/Cab (10 Mtr), DRZ (10 Mtr), KYS (15 Mtr), BXA (25 Mtr), LBO (20 Mtr), RSA (20 Mtr), DURG (10 Mtr), G/Cab (20 Mtr), BQR (25 Mtr), BIA (35 Mtr), P/Cab (20 Mtr), OLY (10 Mtr), FMY (50 mtr), DPH (20 Nos), DGS (20 Nos), BYL (20 Nos), NPI (12 Nos), BYT/West (22 Nos), HN (30 Nos).
  22. Bond wire has been replaced at KMI (250 Mtr), D/Cab (50 Mtr), A/Cab (20 Mtr), H/Cab (40 Mtr), C/Cab (10 Mtr), DRZ (10 Mtr), KYS (05 Mtr), BXA (10 Mtr), LBO (10 Mtr), RSA (10 Mtr), G/Cab (20 Mtr), BQR (15 Mtr), BIA (15 Mtr), FMY (150 Mtr), DPH (40 Nos), DGS (26 Nos), BYL (24 Nos), NPI (30 Nos), BYT/West (27 Nos) and HN (25 Nos).
  23. FOIS has been shifted at Dy.SS/Durg from C&W office on 07.09.17.
  24. UTN connection has been done at TTE, Lobby/Durg on 13.09.17.

MECHANICAL (C&W)

  1. 02 wagons were converted into Twin pipe brake system in this month at PPYd-BIA and 1221 till September-2017.
  2. 60 Nos. RF-361 Draft Gear repaired from out source agency & use in ROH Wagons at PPYd-BIA.
  3. New work i.e. NPOH work started using additional stiffener of channel from 23.09.17 with additional special gang consisting of 1 SSE + 1 Welder + 4 Staff and till date 03 wagon NPOH done.
  4. 01No. new Air dryer fitted in outing air pipe line at sickline Air compressor at ROH Depot PP Yard BIA.
  5. 67 Nos. of BOXNHL doors locally repaired collected from damaged door from sick line as well as Coal Empty yard PPYD/BIA.
  6. At PPYd-BIA, 106 nos. flap door for BOXN, 67 Nos. flap door for BOXNHL, 19 Nos. Hand Brake Wheel, 07 Nos. Door Mediator, Primary Break Beam (BOXNHL) repaired and reused with the help of door repairing pneumatic device salvaged from scrap materials and saved Railway revenue of Rs 890696.71 (8.9 Lakhs Approx.).
  7. SSE/C&W/BIA having one no. Hydraulic mobile road crane 10/12 Ton capacity for the use of Wagon body lifting and wheel/Bogie changing. Nylon polyester belts are utilized instead of Steel wire ropes to avoid bearing damages.
  8. Grading of 27 Nos. of welders of PPYD/BIA done & job of 05 welders sent to CMT/KGP for grading out of 50 Nos. of welders at PPYD/BIA.
  9. 208 nos. of coaches intensive cleaning done in the month of SEP-17.
  10. 02 Sets of GO & NO-GO gauges of “A” and “B” dimension for AC, NAC coaches have been prepared.
  11. 36 nos. passenger complaints through Coach Mitra , reduced day by day, due to counseling with OBHS staff.
  12. Waste steam from ironer is condensed and collected, stored in tank and which is circulated again in boiler feeding tank.
  13. Total 568 rakes examined in Raipur Division in this month.

MECHANICAL (DLS):-

  1. The loco availability for the month of Sep-17 is as below:-

Description / Target / Actual / Percentage improvement over the target
Month / Cum. / Month / Cum. / Month / Cum.
Freight / 114.8 / 112.70 / 120.34 / 117.12 / 4.83% / 3.92%
Coaching / 23.00 / 23.00 / 23.36 / 23.66 / 1.57% / 2.87%
Total / 137.80 / 135.70 / 143.70 / 140.78 / 4.28% / 3.74%
  1. New HHP Loco Shed: Work for “Expansion of capacity to home WDG4 (HHP) locos at Raipur” sanctioned in the Year: 2010-11(Pink Book item No: 491 of 2017-18), Plan Head:42. Latest Sanctioned cost: 41.61 Crs. Location: Near existing RSD-Yard/Raipur, opposite to present Diesel Loco Shed-Raipur has been almost completed and shed has been made ready. The maintenance of locomotive in this shed has been started from 11.09.2017. Loco no. 12458 was placed in this shed and given top up schedule.

  1. During the month, as advised by railway board a special 90 days safety drive has been launched on 21.08.17 for prevent accident. Total of 165 locos covered so far, under the drive and continuous checking is being done during all schedules, to ensure accident prevention.
  2. Monsoon precautions are being taken to ensure reliability of locomotives during rainy season. All locos have been covered so far & continuous checking is being done during all schedules, to ensure working of sanding gear.
  3. During the month, two WDG4D locos 70732 & 70733 have been commissioned and offered to traffic for goods services.
  4. During the month 3 locos- yearly, 1 loco – 3 yearly & 1 loco – 6 yearly, schedules of HHP loco and 01 loco-M48 schedule of ALCO have been done.

MEDICAL:-

  1. jk;iqj e.My esa vkj-,e-lh- dk izfr’kr dqy dk;Zjr deZpkfj;ksa dk 2-70% gS ,oa vkbZ-vks-Mh- dqy deZpkfj;ksa dk 0-15% gSA ekuo fnolksa dh {kfr dk izfr’kr jsyos fpfdRlk izek.k&i= ij 1-84% ,oa dk;Z ij ?kk;yksa dk 0-17% jgkA ¼;g fu/kkZfjr 2% dh lhek ds Hkhrj gSA½.
  2. Ldqy LokLF; dk;ZØe fnukad 21-08-2017 ls 24-08-2017 rd nf{k.k iwoZ e/; jsyos] feDl gk;j lsds.Mjh Ldqy ch-,e-okbZ esa v;kstu fd;k x;k ftlesa 462 fo|kfFkZ;ksa dk LokLF; ifj{k.k fd;k x;kA
  3. fpfdRlk foHkkx jk;iqj eaMy }kjk Lokbu ¶yw ij tkx:drk dk;Zdze vk;kstu fd;k x;k] ftlds varZxr fnukad 01-09-2017 dks mi eaMy fpfdRlky; ch,eokbZ esa dk;Zdze vk;kstu fd;k ,oa fnukad 02-09-2017 dks eaMy fpfdRlky; jk;iqj esa dk;Zdze vk;kstu fd;k x;k A

* * * * *

1