ETSI MTSMTS(10)0039

ETSI MTS

New Work Item Form / Form to be used when proposing new WorkItems for adoption onto the ETSIWorkProgramme.
ATTENTION: Before starting to work on a revision of a published ETSI document, contact to obtain the latest Word version In case of multi-part deliverable, please use ONE work item form for EACH part
Work Item details
Which Technical Body is responsible?
MTS
WI reference number (if known):
DTS/MTS-00135_eERP_EAC_TA
(number will be allocated by Secretariat if not shown) / Will an STF be requested? [Yes]
STF number (if known): NO
Formal title
of deliverable: / Methods for Testing and Specification (MTS);
Extended Access Control (EAC) Conformance Testing of Electronic European Resident Permit;
Test Adapter
Working title:
eERP EAC Conformance Testing Test Adapte / Scope of work to be undertaken:
The Work Item will develop theTest Adapter needed for executing the adaptation layers interfacing the TTCN-3 test drivers (system) to the underlying System Under Test (SUT) .The actual implementation case study will be of theeERP Inspection System.
This deliverable will contain :
-The Technical Description of the Test Adapter including the Adaptation layers, the security functions, the description of the HW integration of test system into the ISO 14443 platform
-Adaptation layers software
-Security/Cryptography software functions
Rapporteur (named individual person):
name: Dr. Dieter Hogrefe
organisation:University of Gottingen
e-mail: / Supporting ETSI Member organisations:
(name at least four)
  1. Conformiq
  2. University of Gottingen
  3. Testing Tech
/
  1. PQM Consultant
  2. FSCOM
  3. MTP

Deliverable document details:
What type of document will be produced?
EN[ _ ] EG[ _ ] ES[ _ ] TS[ X ] TR[ _ ] SR[ _ ] GS [ _ ]
For EN deliverables only:
Is the draft EN to be approved by One-step Approval or Two-step Approval Procedure?[OAP / TAP]
Candidate harmonized standard?[Yes / No]
Directive: ______/ Is it a new document or a revision of an existing one?
[new]
If a revision, state the deliverable (e.g. TS102987v1.1.1) being revised: ______edition / version______
Hierarchy:if this Work Item fits in a hierarchical tree (see TWP clause 1.6.1), its position shall then be indicated here by giving the reference of its parent node (WI reference / deliverable number / topic name).
______
Work schedule:
Milestone name / Target date
  • Start of the work
/ 2011/01/01
  • Early Draft
/ 2011/06/31
  • Stable Draft
/ 2011/12/31
  • Final Draft for approval
/ 2012/05/31
  • TB approval
/ 2012/06/31
To be published as version: / V1.1.1
Remarks: ______
______
Environmental Aspects / [Yes / No] / User /Consumer Aspects / [Yes / No]
Key aspects (in an overall perspective):
  • Power consumption and saving mechanisms
  • Operational conditions
  • Other matters
/ [Yes / No]
[Yes / No]
[Yes / No] / Key requirements:
  • accessibility & Usability
  • user security
  • privacy
  • safety
/ [Yes / No]
[Yes / No]
[Yes / No]
[Yes / No]
Comment:______/ Comment: ______
Security Aspects
Comments:______/ [Yes / No] / Keywords (at least 2 from those available at
______; ______;
______; ______