Project:

Name: Yusuf khan V. Kukad Page 1 of 7

  1. PROPOSED POSITION :
  2. NAME OF STAFF:Yusuf khan V. Kukad
  3. DATE OF BIRTH:28th Oct. 1965
  4. NATIONALITY: Indian
  5. MARITIAL STATUS: Married

6.EDUCATION QUALIFICATION:

B E (Civil) in 1988 from GujaratUniversity, Ahmedabad

M.Tech (Civil), Rajasthan Vidya peeth University, Udaipur

  1. MEMBERSHIP/LICENSES OF PROFESSIONAL SOCIETIES:

Associate Member: The Institution of Engineers (India), Kolkata-AM 086632/9 (AMIE)

Chartered Engineer: The Institution of Engineers (India), Kolkata-AM 086632/9 (CE)

Fellow of Institution: The Institution of Valuars (India), New Delhi-F 9182 (FIV)

Structural Engineer: Rajkot MCD ( Town Planning & Development Depts.)

-E-133 (Str. Eng.)

Surveyor/Loss Assessors: Ministry of Finance, Govt Of India-Lic No. 149/99 (SLA)

Govt. Registered Valuars : Ministry of Finance (I.T.), Govt. Of India

-Reg. No. Category-I/2/’01-‘

Fellow/ Life Member:The Indian Institutions of Bridge Engineers, Mumbai -LF-1549 (FIIBE)

Life Member : Indian Road Congress, New Delhi-LM-36907

Life Member:Indian Concrete Institute, Chennai-LM-8077(MICI)

Member:IndianBuilding Congress, New Delhi-MIBC-3610

Member:Indian Chapter of American Concrete Institute, Mumbai-IM-06-082.

Life Member:American Society of Civil Engineers, India Section

-ASCE-IS 1110, Kolkata.

Life Member:Indian Geo Technical Society, New Delhi

Fellow Member:Association of Consulting Civil Engineers (India), Chennai

Member: Consulting Engineers Association of India

  1. PERMANENT ADDRESS:Yusuf khan V. Kukad

Niyat, 448- Sethnagar

Opp. Dwarkadish Petrol Pump

Jamnagar Road, Rajkot- 360 006 (Guj.) -India

Mob: 98250 28219

E-mail:

9. Key Qualification:

Having 22 years of extensive experience in various fields of Civil Engineering, especially in construction of Highway and Bridges Project under FIDIC conditions of contract and MORTH Specifications etc. funded by the international & National funding agencies like WORLD BANK, ADB and NHAI. Presently working as Quality Co-ordinator.Leading technical team as well as laboratory staff for soil and material testing, Geo-technical investigation and analysis, preparation and implementation quality control and quality assurance manual, design and review of various pavement materials like GSB, WMM JMF, BM, DBM, PMB, BUSG, SDBC, MSS, SD etc., design and establishment of various Concrete Grade Mix Design, fully aware of procedure of approval of various sources of material, third party laboratory and test house approval, preparation of methodology statement of construction of Highway and Structure activity. Interpretations, Compilation and presentation test result and data including establishment of laboratory for all type of testing related Highway and Structure Project.

Some of my Major Assignments include :

  • Strengthening, Widening and Paving of Shoulders of Gujarat State Highways GSHP-10 (Rajkot - Morvi) under World Bank funded.
  • Strengthening, Widening and Paving of Shoulders of Gujarat State Highways GSHP-3A (Rajkot - Jamnagar) under World Bank funded.
  • Reconstruction, Widening and Paving of Shoulder of 2 laning to 4 laning of NH-8B Ch. Km. 30+000 to 33+330 of inclusive of ROB at Bavla city of Ahmedabad – Bagodara Section of NH-8B, under NHAI funded.
  • Strengthening & widening 2-lanning to 4-lanning km. 111 to 114.925 on Ahmedabad – Mumbai section of NH no. 8 with ROB Kapurai (Vadodara bye pass), under NHAI funded.
  • Strengthening & widening 2-lanning to 4-lanning km. 122 to 125.600 on Ahmedabad – Mumbai section of NH no. 8, under NHAI funded.

12. EMPLOYMENT RECORD:

PERIOD:16.02.2009-Till date

POSITION:CLUSTER QUALITY HEAD-GUJARAT

Employer:M/s. LARSEN & TOUBRO LIMITED-IDPL.

  • Development Project Business Unit, Gujarat Region.

Summary of Project:Cost : INR-6500Cr

  • Ahmedabad-Viramgam-Maliya, four laning, GSRDC,BOT on VGF of GOI(183 km)
  • Halol-Godhara-Shamlaji, four laning, GSRDC,BOT on VGF of GOI(177 km)
  • Rajkot-Jamnagar-Vadinar, four laning, GSRDC,BOT on VGF of GOI(131 km)
  • Samakhali-Gandhidham, Six laning, NHAI,DBFO on NHDP PHASE V, GOI(56 km)

My task Includes :

  • Planning and administering a quality assurance program that aims at ensuring continuous
    production that is consistent with the adopted and established quality standards.
  • Developing and establishing standards and methods for inspection, testing, and evaluation and ensuring abiding by them.
  • Supervising and overseeing the analysis, inspection, design, and testing, to ensure the highest standards of quality.
  • Checking of the quality of material received at the sites as per the required specifications &
    quality norms to avoid use of substandard material. Coordinating the material procurement
    department for procurement of quality material.
  • Establishment of testing laboratories at the sites with the qualified QA/QC supervisors.
  • Setting and overseeing the implementation of a testing and inspection schedule and ensuring the compliance with the set date and procedures.
  • Supervising and coordinating the quality auditing efforts to ensure compliance with adopted
    standards.
  • Inspecting and checking the executed works to ensure the quality.
  • Maintaining Quality Manual and Quality Procedures Manual and ensure the awareness of all employees with regards to the criticality of quality and the adopted standards.
  • Attend Project-Kick Off meetings and Pre-Production Supplier Meetings,where applicable.
  • Supervising the function of QA/QC Engineers and providing assistance and guidance as
    required.
  • Allocates qualified Quality Control personnel to the various areas of site activity.

11. EMPLOYMENT RECORD:

PERIOD:01.04.2008-30.01.2009

POSITION:SENIOR QUALITY & MATERIAL ENGINEER

Employer:M/s. PARSONS INTERNATIONAL CONSULTANTS, INC

Mid east region, Dubai,UAE

  • Development & Construction of Arabian Canal Phase-I

Summary of Project:Cost : 11 billion USD,Canal Length: 75 km, land development 12759 hectares,1 million residential unit with integrated transport systems includes metro, people movers, water transport, bicycle tracks & walkable street.

My task Includes :

  • Overall incharge for QA&QC plan.
  • Co-ordination with Consultants and Material testing labs.
  • Monitoring day to day routine testing.
  • Identification and testing of Borrow Area for earthwork, Sub grade, GSB, Aggregates & Quarries.
  • Design establishment, constant Monitoring and Review of WMM JMF.
  • Preparation, finalization and implementation of methods statements.
  • Design establishment of various Concrete Grade Mix Design.
  • Responsible for Material/Geotechnical investigation for all Road, Cross Drainage Structure and Foundation Study of Minor and Major Bridges.
  • Calibration testing of Plant (HMP, Concrete Batch Plant, WMM Plant), Equipments and Machineries.
  • Also well converse with codal practice of international specifications, standards and contract; BS, ASTM,AASTHO,ACI,BSEN & FIDIC.

10. EMPLOYMENT RECORD:

PERIOD:15.06.2004-30.03.2008

POSITION:CHIEF MATERIALS MANAGER

Employer:M/s. NAGARJUNA CONSTRUCITON COMPNAY LTD, HYD.

  • Strengthening & Widening of SH-24 Rajkot – Morvi (Km 1+827 to 70+192) and paving of shoulders, GSHP-10 Phase II B, World Bank Aided Project
  • Strengthening & Widening of NH 8A & NH 14 from Bamanbore to Gagodar ( Package III & IV of East – West Corridor of NHAI ) ,Asian Development Bank Aided Project

Summary of Project:Cost : 993,837,989, Road Length: 68.365, Nos. of Major Bridges: 3, Rehabilitation of MajorBridge: 1, Nos. of Minor Bridges: 25, Nos. of Box Culvert : 42, Nos. of Pipe Culvert : 77 ( Details of SH 24 Projects)

My task Includes :

  • Overall incharge for QA&QC plan of Km. 68.365 road project.
  • Co-ordination with Consultants and Material testing labs.
  • Monitoring day to day routine testing.
  • Identification and testing of Borrow Area for earthwork, Sub grade, GSB, Aggregates & Quarries.
  • Design establishment, constant Monitoring and Review of WMM JMF.
  • Design establishment, constant Monitoring and Review of MSS, DBM and BC.
  • Preparation, finalization and implementation of methods statements.
  • Design establishment of various Concrete Grade Mix Design.
  • Responsible for Material/Geotechnical investigation for all Road, Cross Drainage Structure and Foundation Study of Minor and Major Bridges.
  • Calibration testing of Plant (HMP, Concrete Batch Plant, WMM Plant), Equipments and Machineries.

Additional charge of SeniorBridge Engineer.

  • Preparation of Construction Programme, Planning and Resources Deployment.
  • Design of Staging and Support arrangement for Super Structure Elements.
  • Testing and Review of Repair and Rehabilitations of MajorBridge.
  • Design and Review of Safe Bearing Capacity of Soil for foundation.

Also Work as a Project Manager in absence of Project Manager.

PERIOD:Feb. 2003 – Jun. 2004

POSITION:Quality & Material Engineer

Employer:M/s Backbone Project Ltd. Ahmedabad.

  • Construction of major bridge with approaches at Br. No. 28/1,52/1,56/1 & 64/1, (GSHP-3A) on Rajkot - Jamnager Highway (SH-25). GSHP – 3 A Phase I, World Bank Aided Project

Summary of Project:Cost : 14.00 Cr., Road Length: 8.365, Nos. of Major Bridges: 4, Rehabilitation of MajorBridge: 4, Nos. of Pipe Culvert : 8.

My task Includes :

  • Overall incharge for QA & QC plan of project.
  • Co-ordination with Consultants and Material testing labs.
  • Monitoring day to day routine testing.
  • Identification and testing of Borrow Area for earthwork, Subgrade and GSB.
  • Design establishment, constant Monitoring and Review of WMM (JMF).
  • Design establishment, constant Monitoring and Review of MSS, DBM and BC.
  • Preparation, finalization and implementation of methods statements.
  • Design establishment of various Concrete Grade Mix Design.
  • Responsible for Material/Geotechnical investigation for all Road, Cross Drainage Structure and Foundation Study of Minor and Major Bridges.
  • Calibration testing of Plant (HMP, Concrete Batch Plant, WMM Plant), Equipments and Machineries.

Additional of SeniorBridge Engineer.

  • Preparation of Construction Program, Planning and Resources Deployment.
  • Design of Staging and Support arrangement for Super Structure Elements.
  • Testing and Review of Repair and Rehabilitations of MajorBridge.
  • Design and Review of Safe Bearing Capacity of Soil for foundation.

Also Work as a Project Manager in absence of Project Manager.

PERIOD:Jun. 2002 –Jan. 2003

POSITION:Quality & Material Engineer

Employer:M/s Backbone Enterprise Ltd. Ahmedabad.

  • 2 laning to 4 laning of NH 8 B @ km. 30 to 33 + 330 inclusive of ROB at Bavla city of Ahmedabad- Bagodara section of NH8

My task Includes :

  • Planning and Execution of Material Testing.
  • Development of Systems and Procedures of QA&QC Plans.
  • Identifications of Constructions Material Sources.
  • Identifications of Quarry and Borrow Area.
  • Supervise all Laboratory and Field Test.
  • Design and testing of Concrete Mix, WMM (JMF), BM, DBM and BC.
  • Also Responsible for Testing of Materials, Analysis of Data and Interpretations of Results, Pavement Investigations and Design etc.
  • Preparation of Methodology for each Construction activities complying the Specification and available resources.
  • Calibration testing of Plant (HMP, Concrete Batch Plant, WMM Plant), Equipments and Machineries.
  • Preparation of Construction Programme, Planning and Resources Deployment.
  • Design of Staging and Support arrangement for Super Structure Elements

PERIOD:Jan. 1998 –May 2002

POSITION:Quality & Material Engineer

Employer:M/s Kalthia Engineer Construction Ltd. Bhavnagar

  • Special repairs (SR) 2000-01 in km. 174.00 to 192.00 (RHS) of Ahmedabad- Mumbai Section of NH 08
  • P. R. 2000-01 in km. 202 to 218 + 200 (RHS) on Ahmedabad- Mumbai section of NH No. 8
  • SR- 2000-01 in Km. 152.0 to 174.0 (RHS) on Ahmedabad – Mumbai Section of NH No. 8
  • SR- 2000-01 in Km. 152.0 to 174.0 (RHS) on Ahmedabad – Mumbai Section of NH No. 8
  • Strengthening & widening 2-lanning to 4-lanning km. 111 to 114.925 on Ahmedabad – Mumbai section of NH no. 8 with ROBOT Kapurai (Vadodara bye pass)
  • Strengthening & widening 2-lanning to 4-lanning km. 122 to 125.600 on Ahmedabad – Mumbai section of NH no. 8.

My task Includes :

  • Monitoring day to day routine testing.
  • Identification and testing of Borrow Area for earthwork, Sub grade, GSB, Aggregates & Quarries
  • Design establishment of various Concrete Grade Mix Design
  • Responsible for Material/Geotechnical investigation for all Road, Cross Drainage Structure and Foundation Study of Minor and Major Bridges.
  • Calibration testing of Plant (HMP, Concrete Batch Plant, WMM Plant), Equipments and Machineries
  • Implementation & Monitoring of MSS, DBM, BC, BUSG, SDBC & PMB
  • Design of Staging and Support arrangement for Super Structure Elements.
  • Testing and Review of Repair and Rehabilitations of MajorBridge.
  • Design and Review of Safe Bearing Capacity of Soil for foundation.
  • Checking the alignment of newly construction pavement and fix the permanent TBM.
  • Checking OGL status for cutting and filling in new alignment
  • Involve in preparation of MPR & DPR.
  • Preparation of Construction Programme, Planning and Resources Deployment.
  • Design of Staging and Support arrangement for Super Structure Elements

PERIOD:Jan. 1993 –Dec. 1997

POSITION:Highway/Material Engineer

Employer:Kalthia Engineering and Construction Ltd.,

  • Improvement of Riding Surface for Shihor – Tana section of Bhavnagar – Kandla State Highway under R&B Dept., Bhavnagar Costing to Rs. 19.0 Millions
  • Improvement of Riding Surface for Tana – Varal section of Bhavnagar – Kandla State Highway under R&B Division, Bhavnagar Costing to Rs. 13.0 Millions.
  • Urgent Repair of Sanesh – Kala Talao road under R&B Dept., (Panchayat) costing to Rs. 4.5 Millions.
  • Periodical repairs to Mamas – Alang section of State Highway under R&B Dept., Bhavnagar costing to Rs. 11.0 Millions.
  • Special Repairs to Mahuva – Rajula Section of State Highway under R&B Dept., Bhavnagar costing to Rs. 3.5 Millions.

My task Includes :

  • Carrying out the required field and laboratory test during construction.
  • Conversant with all laboratory and field test as per IS, IRC and ASTM for soil, sand, aggregate, bitumen and concrete work.
  • Carried out the detail investigation of soil and other materials present in pavement concrete.
  • The duties also involved in surveying, fixing of new alignment, design of pavement and culverts etc.
  • Adequate emphasis was given at the investigation stage in checking the property of soil and other material to make right choice of material for use in Highway Construction.
  • Conversant with all Job Mix Procedure for GSB, WMM, DBM, BM also conversant with Concrete Mix Design with relevant standard test required as per specification.
  • Responsibility including identification of quarry, laboratory testing of material to assess adequacy and suitability, mix design for RCC and Bituminous Concrete including soil stabilization and subgrade, GSB etc. Involve in design of Highway, Geometric Design for straight alignment, Horizontal Curve including spiral transition at each intersection point of minimum and maximum grade as IRC specification choosing suitable gradient involved in the design of vertical curve giving due consideration to the sight distance also checking in gradients. Involved in the setting out of horizontal and vertical curve.
  • Involve in preparation of MPR & DPR.

PERIOD:June 1988 –Dec. 1992

POSITION:Site Engineer

Employer:Shri Hari Constructions - Rajkot

  • Periodical repairs & strengthening of 19 Kms long Ribda – Haltara section of State Highway under R&B Dept., Rajkot costing to Rs. 7.5 Millions.
  • Improvement of Riding Surface for Botad – Paliad section of State Highway under R&B Dept., Bhavnagar costing to Rs. 2.5 Millions.

My duties involved :

  • Checking the alignment of newly construction pavement and fix the permanent TBM.
  • Checking OGL status for cutting and filling in new alignment.
  • Excavation of soil base on the laboratory test result.
  • Preparation of quality assurance system.
  • Concluding the all quality test to get required quality of work.
  • Involve in preparation of MPR & DPR.
  1. CERTIFICATION:

I, the undersigned, certify that to the best of my knowledge and belief, this bio-data correctly describes my qualifications, my experience and myself.

Signature of Candidate ______

CURRICULUM VITAE E-mail: