C.v
Name: - BAHAA AHMED IBRAHIM ELRASHEDY
Address: al-Sadat, monfia
Nationality Status: - Egyptian
Material Status: - Married
Military Status: - Completed
Telephone / Mobile: -(00201110026596)-(00201019112396)
E-mail:-
FirstUniversityDegree: - BSc in power and electrical machine Engineering
University : TANTA University
Faculty :-Engineering
Graduation Year: May 2001
ACCEPTED Total grade :
Grade : very good
1- Job Title:-Electrical maintenance engineer
Nubaria Power Station :- (1) (2x750 MW) Combined Cycle Consists Of 2 Modules Each Module Consists Of 2 Gas Turbine(2x250 MW) Model V94.3A Heavy Duty (From Siemens Company Germany) & 2 Heat Recovery Steam Generator(HRSG- From Alstom Company France) & One Steam Turbine 250 MW (From Mitsubishi comp. Japan).
(2) The switch yard:-
(a) 6 Main transformer 500/16.5 kV.
(b) 4 Tie transformer 500/220 kV.
(c) 8 Feeders 220 kV.
Description of job responsibilities
- Medium voltage
Corrective & preventive maintenance for the following:-
- Medium voltage 6.3 kv switchgear with 4 incoming
- 6.3/0.4kv dry transformers
- Motors control center (MCC )
- Local distribution panels
- Low voltage induction motor ,
- Medium voltage induction motors
- Emergency diesel generators
- Elevators
- Air compressors
- Power transformers
- Measuring VT & CT
- Dc system ( chargers & batteries )
- UPS system
- Distribution DC system
- Lighting & earthing system
- Plant grounding
- Electric loop wiring test
- Insulation resistance test for all types of cables , motors & bus ducts with high DC voltage
- Testing for motors (rotation direction, earthling, winding , insulation resistance...etc)
- Generator Gas Turbine& steam Turbine
- Generator auxiliary system
- Generator design & structure and visual check in inside generator
- Maintenance for generator and trouble shooting
- Maintenance for generator auxiliary system
- Operation for generator and generator auxiliary system
- Minor inspection for gas turbine (stator& Rotor)
Stator 1-measrue insulation resistances of stator winding
2-check stator winding condition (visual) (TE&EE)
3-check of flexible strips
Rotor 1-check for true running
2-check rotor end winding area
3-Measure insulation resistances of rotor winding
4-voltage drop test on slip ring supply lead
5-check rotor wedges and retaining rings(visual)
Cooler 1- check cooling water inlet and outlet pipes
2- Check vent pipes
3-Check drain pipes
4-check mounting of all coolers
5- Check condition and performance of temperature
measuring device.
- Major inspection for gas turbine (stator& Rotor)
Stator 1-measrue insulation resistances of stator winding
2-check stator winding condition (visual) (TE&EE)
3-check of flexible strips
4- D.c over potential test
5- A.c high voltage test
6- partial discharge test
7-dissipation factor tan δ test
Rotor 1-check for true running
2-check rotor end winding area
3-Measure insulation resistances of rotor winding
4-voltage drop test on slip ring supply lead
5-check rotor wedges and retaining rings(visual)
6- winding resistance test
7- winding impedance test
Cooler 1- check cooling water inlet and outlet pipes
2- Check vent pipes
3-Check drain pipes
4-check mounting of all coolers
5- Check condition and performance of temperature
measuring device.
- Excitation system(Steamturbine)
- Automatic voltage regulator (AVR)
- Excitation rectifier
- Excitation transformer ofsteamturbine generator 15Kv/600 v
- Excitation field circuit breaker
- Auto & Manual excitation control
- Excitation commissioning and start up
- Excitation system maintenance and trouble shooting
- Thyristor control excitation
- Static frequency converter (SFC)
- Machine control converter (MCC)
- Line control converter (LCC)
1-visual check of condition
2-check operator functions from central control room
3-analysis of alarms and alarm report
4-Check of all screw terminals
5-check electronics cabinet installed with voltage regulator equipment
Check power supply including incoming diode dust filter flow indicator
fixing the clamp of circuit breaker
- starting transformer ofgasturbine generator 6.3Kv/1.8kv
- Static excitationequipments (SEE)
1-visual check of condition
2-analysis of alarms and alarm report
3-analysis of alarms and alarm report
4-check operator functions from central control room
5-check electronics cabinet installed with voltage regulator equipment
Check power supply including incoming diode dust filter flow indicator
Fixing the clamp of circuit breaker
- Automatic voltage regulator (AVR)
- Excitation field circuit breaker
- Auto & Manual excitation control
- Excitation commissioning and start up
- Excitation system maintenance and trouble shooting
- Thyristor control excitation
- Excitation rectifier
- Excitation transformer ofgasturbine generator 6.3Kv/720 v
Previous employment
Job title Electrical Project Constructions Engineer
Employer: a)Two GE gas turbine (2x 250 Mw) power station
( Two horizontal STF HRSG b)
( OneAlstom STG 250 MW (HP, IP, LP) c) turbine
Employer Country: Nubaria of Egypt
Job description: Approving designs & submittals, sit acceptance tests, Commissioning and start-up for: Combustion Turbine Generator ( GE )
1- Basic operation/ maintenance(training)Siemens gas turbinev94.3A
Location : Nubaria– Egypt .
Duration : 1to15march 2008
Contents : Introduction tothe plant - Electrical – and 1 & C part
Gas turbine part
2-Operation and maintenance OF HRSG
– Egypt Nubaria: Location
From 15/march to 1/april 2008 Duration :
3-Operation and maintenance(training) OF switch yard 500kv &220kv
– Egypt Nubaria: Location
Duration : 1 to 15 april 2008
Amplissima user training program
Location : talkha gas turbine power plant– Egyp
Duration : 6to18march 2010
Contents:
- plant module function
- report generator function
- Document module function
- work order module function
- Store module function
- preventive maintenance module function
- purchasing module function
- system administrator function
Year ofExperience:7 Year.
Language: Arabic mother language –English very good