Minutes Ebix EMD

Minutes Ebix EMD

Minutes Exchange of Metered Data Project meeting September 19th– 20th, 2006

Date:Tuesday 19th, 2006 Wednesday 20th, 2006

Time:09.00 – 18:0009:00 – 15.00

Place:RWE

Massenbergstraße 9-13, (entrance at 13B)

44787 Bochum , Germany

Appendix:

Appendix AParticipants in ebIX metered data project

Appendix BOpen actions

Appendix Cactions moved to list “done”

Appendix Dactions moved to list removed

  1. Opening,
  1. Approval of the minutes

The minutes were approved.

  1. Approval of agenda

The item for European railway metering was added tot the agenda. The agenda was approved.

  1. Action list

Because of the planned update of the ebIX website and partly because we expect more from direct distribution we will distribute the model documents to other organizations: ETSO, EFET, Eurelectric, UCTE, EASEE-gas (and ERGEG after comments) instead of publication on the ebIX website.(see also item 7)

  1. Report from:
  2. ebIX ETC
  3. modelling: nothing new
  4. EMVR
  5. Vlatka reported about the kick-off meeting for EMVR. EMVR is going to discuss an update of the role model and especially areplacement ofthe MeteringPoint by an AccountingPoint(note: in the meantime EMD has received a proposal that has already been discussed in ebIX ETC and that will be discussed during the next EMVR on the 5th and 6th of October). Another important open issue will bethe use of the EAR-document versus ebIX metered data formats.

A possible risk for the project is the (lack of) clarity about the scope of the project.

5.2.2.Role model: In a brief discussion we have taken stock of pro’s and con’s of “AccountingPoint” instead of MeteringPoint. The conclusions of the discussion have been included in the proposal (see note above). ebIX EMD sees no serious harm in renaming the MeteringPoint into AccountingPoint and differentiating this from a kind of Physical Connection Point.

  1. European railway metering

We have looked at the information Ove Nesvik has sent about the Railway project and discussed their request to participate in EMD. We see no real problem in the railway sector participating in ebIX EMD. But we would like to see clarity about scope and objectives first and we would like to see some formal arrangement between electricity and railway sector first. We will ask Ove to contact Konstantin/Hugo to contact railway sector before we (as ebIX EMD) do anything.

  1. ebIX Forum
  2. We will send the final documents (Measure Introduction; Measure, Metered data for Imbalance Settlement and Measure, Metered data for Reconciliation) to ebIX Forum for approval. (action: Kees)
  3. Status report: in the meeting we have drafted a status report.
  4. Plan 2007: no new plan.
  1. Modelling:
  2. Measure, Introduction to models: document approved for publication for comments

We discussed to split off the part of collected data from the introduction. We have decided that we probably will do this later after receiving the comments to the model and before publishing the documents as final. (action: Kees)

8.2.Measure: Metered data for Imbalance Settlement: model approved for publication for comments.

8.3.Measure: Metered data for Reconciliation: model approved for publication for comments.

8.4.Settle: Reconciliation: model approved for publication for comments. After the commenting round we will put the prices fromthe “detailed observation” back again in “observation”. (action: Kees)

8.5.Measure: Metered data for Billing: model discussed and updated and approved for publication for comments. One of the elements that has been discussed is who delivers (and therefore invoices) reactive energy? The answer is: the Grid Access Provider. The model (Class Diagrams) has been updated accordingly.

Remark: all paragraph headings for class diagrams have to be like in document imbalance settlement (E66, 23, reason, role, function + additional text also explaining to whom). (action: Kees)

8.6.Determine switch stand. The model has been discussed and completed. Kees will prepare a final draft on this basis. (action: Kees)

Based on the modelling of the determination switch stand, the UseCase for Validation has to be modified. (action: Kees)

  1. Quantity qualities, estimate origins, ….

Not dealt with: will be moved to a later meeting.

  1. How can we improve data quality?
  2. Extend request with additional information/specification
  3. …………..

Not dealt with: will be moved to a later meeting.

  1. Other documents:
  2. revised approach to modelling exchange of metered data (document 20060323)

Not dealt with: will be moved to a later meeting.

11.2.SAP questionnaire on metered data

The questions were discussed and Ingo has noted the answers.

  1. Work plan for next meetings

We discussed the options for the next meeting in Stockholm. Lars proposed to organise the meeting on board of the ferry to Tallin. The original dates posed a problem for Vlatka. Other options had to be checked later after the meeting. At the meeting we reserved October 18th and 19th for a meeting on board the ferry. Vlatka will inform the group as soon as possible about the new dates based on information from Lars. (action: Vlatka)

Meeting 23: 28-29 November, Skaerbaek (Denmark)

  • Last review of the model for metered data for billing
  • Finalize modelling “Determine switch stand”
  • How to improve data quality.

Meeting 24: ……………………

  • Metered data as an XML-schema (instead of Edifact message)
  • …………..
  1. Any other business
  • ebIX presentation for the conference Metering, Billing & CRM/CIS Europe 2006 in Copenhagen
  • we reviewed the presentation. Vlatka will contact Peter with some questions about the intended results of this part of the presentation. (action: Vlatka)
  • SAP questions on role model (see also 10.2)

Not dealt with: will be moved to a later meeting

Appendix AParticipants in ebIX metered data project

Members

Name / Company / Telephone / Mobile / E-mail
Vlatka Cordes / RWE / +49 234 515-1638 / +49 162 2519714 /
Hugo Dekeyser / UMIX / +32477558003 /
Adrian Fuchs / Etrans / +41585802328 /
Oscar Ludwigs / SvK / +4687397784 / +46705397784 /
Lars Munter / SvK / +4687397850 / +46705397850 /
Walter Müller / TenneT / +31263731277 /
Christian Odgaard / Energinet.dk / +45 76 224463 / +45 23 338555 /
Henri Rix / Energinet.dk / +45 76 224261 / +45 23 338848 /
Lucy Sarkisian / EBO / +31263731631 /
Kees Sparreboom / ebIX / +31 6 22667911 /

Observers

Peter Bauhofer / A&B / +435125708830 / +4369912572511 /
Ingo Haug / SAP /

Information to:

Name / Company / Telephone / Mobile / E-mail
Erik Hartwell / ETSO TF14 / +4576224450 /
Ove Nesvik / ebIX / +4722421380 / +4792822908 /

Appendix BOpen actions

Action / Name / Originated from meeting / Planned end date / End date
Publish combined models / Kees Sparreboom / 19 / Meeting 20
Distribute draft proposal error handling to Sweden and other ebIX groups / Kees Sparreboom / 19 / Meeting 20
Check for need of confidential metered data for billing / Hugo Dekeyser / 20 / Meeting 21
Check model Determine Switch Stand / All / 20 / Meeting 21
Address cooperation IEC and ETSO regarding CC’s in kick-off EMVR / Vlatka / 21 / 22
Ask ebIX ETC to review Domain model / KSp / 21 / -
Draw up overview models to be used as an annex to various model documents / KSp / 21 / -
Update annex 1 Introduction / KSp / 21 / 22
Check annex 1 Introduction / All / 21 / 22
Make user guide for the ebIX models (caused by remarks about include/extend and showing or not showing owner in UseCases etc.). First we make a draft for ebIX ETC. (“How should I read the ebIX models”) / Lucy / 21 / 22
Find an interim solution for visually linking in UML models the new code list names and the present QDT-names / KSp / 21 / 22
Check all class diagrams for aggregated data and see whether “last update date” should be added / Work group / Asap after publication and comments / 22
Update Introduction and distribute this / KSp / 21 / 22
See where to put the generic model elements for collected data, validated data and aggregated data / KSp / 21 / 22
Update Measure for Imbalance Settlement and distribute this / KSp / 21 / 22
Update Measure for Reconciliation and distribute this / KSp / 21 / 22
Update Settle, Reconciliation and distribute this / KSp / 21 / 22
Send models
Measure: Introduction,
Measure: Metered Data for Imbalance Settlement
Measure: Metered Data for Reconciliation
Settle: Reconciliation
to the ebIX Forum for approval / KSp. / 22 / 23
Send models
Measure: Introduction,
Measure: Metered Data for Imbalance Settlement
Measure: Metered Data for Reconciliation
Settle: Reconciliation
to other organizations (ETSO, EFET, UCTE, EASEE-gas and Eurelectric) for comments / KSp. / 22 / 23
Model Settle, Reconciliation: after the commenting round we put the prices in detailed observation back again in observations / KSp. / 22 / 23
Bring all paragraph names for Class Diagrams in line with Imbalance settlement (e65, 23, … (text…)) / KSp. / 22 / 23
Prepare final draft for Measure: Determine switch stand / KSp. / 22 / 23
Determine dates for next meetings / Vlatka / 22 / asap
Contact Peter regarding presentation for Metering Europe / Vlatka / 22 / 23

Appendix Cactions moved to list “done”

Action / Name / Originated from meeting / Planned end date / End date
Re-organise model documents (one generic introduction) / Kees Sparreboom / 20 / Meeting 21 / Meeting 21
Change reason E23 into various specific reasons / Kees Sparreboom / 20 / Meeting 21 / Meeting 21
Rename Non-Confidential Metered Data / Kees Sparreboom / 20 / Meeting 21 / Meeting 21

Appendix Dactions moved to list removed

Page: 1