RESUME

MANIK CHANDRA DUTTA

Address for communication:

Flat no. 3C, 3rd Floor

Sonartori Apartment

Boral Lake Pally, Garia

Dist. - South 24 Parganas E-mail:

Kolkata- 700 154

West Bengal Mobile No. +91 8013265341

India +91 9836137698

OBJECTIVE

To work for a challenging career and fully devote myself towards the growth of

The Organization.

EDUCATIONAL QUALIFICATION

Diploma inSurvey Engineering Discipline obtained from West Bengal Survey Institute, Bandel, Hooghly,passed out with First Class with 73.7% of marks on 21st September, 2006.

EXPERIENCE SUMMARY (Total Period – 10years)

Tenyears of extensive experience in all kinds of survey work i.e. Land Survey, MechanicalSurvey as well as Civil Execution & skilled in functions of Total Station (Sokkia, Topcon, Leica, Kolida, Pentax, Foif), Digital Theodolite, Transit Theodolite-1”, 20” & Auto Level, Dumpy Level.

Present Assignment:

Working as a Sr. Engineer-Survey with M/s KND Engineering Technologies Limited, 10, Raja Subhod Mallick Square,5thFloor, Kolkata- 700 072, India(from 14th October, 2014 totill date).

(I) Project : Vedant Fashions Private Limited of Proposed (B+G+9) of Retail

Cum Office Complex at Plot no. AA-IIE/23, Action Area- IIE,

Street no. -1111 and Street no. – 0777, New Town, Kolkata-

700 156, India (from 30th December to till date).

Division : Surveying & Pile Execution.

Responsibility : In-charge of Pile.

(II) Project : Pratham Project of Dhoot Group of Proposed (B+G+XVIII) &

(B+G+XIX) Storied Residential Building at 26, B.T. Roadunder

Kamarhati Municipality, Kolkata -700058(from 25th June 2015 to

29th December 2015).

Division : Survey & Civil Execution.

Responsibilities : In-charge of Tower-3.

(III) Project : ITC Limited, Proposed Industrial Building IntegratedConsumer

Goods Manufacturing & Logistics Facility at Uluberia, Howrah,

West Bengal (from 14th October 2014 to 24th June 2015).

Division : Survey & Civil Execution.

Responsibilities : In-charge for all Survey work as well as Civil Execution.

Setting out of columns & footings are marked by Total Station.

Level marking each & every column using of Auto Level machine.

Calculations of co-ordinates are performed by Auto Cad software.

Past Assignment:

A. Worked as onSr. Survey Engineer with M/s Ahluwalia Contracts (India) Ltd, Ahluwalia

House,4,Community Centre Saket, New Delhi- 110 017, India(from 19th February, 2008 to

23rd October, 2014).

(I) Project : Bengal Shristi Infrastructure Development Limited, Shristinagar,

Asansol (from 24th December 2013 to 23rd October, 2014 ).

Division : Survey & Civil Execution.

Responsibilities : In-charge for all Surveywork as well as Civil Execution.

Setting out of columns & footings are marked by Total Station.

Level marking each & every column using of Auto Level machine.

Calculation of co-ordinates are performed by Auto Cad software.

(II) Project : ITC Phoenix Ltd, 93/1, Karl Marx Sarani, Khidderpore, Kolkata-

700 043 (from 26thJune 2012 to 23rd December 2013)

Division : Survey & Civil Execution.

Responsibilities : Setting out of Structure & centre line marking of road by using of

TotalStation.Collecting Co-ordinate from Auto Cad software

whichis extensively used for this project. Level Marking by Auto

LevelMachine.

(III)Project : Calcutta Riverside Project, Batanagar, Kolkata-700 140, West

Bengal (from 21st November 2010 to 25th June 2012)

Division : Survey & Civil Execution.

Responsibilities : Lay-out of Pile point by Total Station & Setting Out of Civil

Foundation, Level Marking & Handing Over of Civil Foundation,

Quantity Calculation for civil work.

(IV)Project : Vedanta Aluminum Smelter Project, Jharsuguda, Orissa (From

19th February, 2008 to 20th November, 2010).

Division : Survey & Civil Execution.

Responsibilities :Setting out by Total Station, Level marking & handing over of civil

foundation. Preparation of Survey report & it is checked by client.

B. Worked as on Survey-Superintendent with M/s UB Engineering Limited, Sahyadri

Sadan,Tilak Road, Pune-411 030, India (from February 2007 to February 2008).

Project : 234 MW CPP Panipat Naptha Craker Project, Panipat, Haryana.

(From February 2007 to February 2008).

Division : Erection & Alignment of HRSG & Boiler.

Responsibilities : In-charge for all type of Survey of 5 nos. HRSG & 2 nos. Utility

Boiler of 234 MW of CPP. All Machines & Equipments are

alignment by Theodolite & Level machine.

C. Worked as onSurveyor with M/s Mistry Construction Pvt. Ltd., 337, Chandavarkar

Road, Matunga, Mumbai-400 019 (from June, 2006 to February 2007).

Project : Bhushan Steel & Strips Limited, Meramundalli, Orissa.

(from June, 2006 to February 2007).

Division : Survey work & Calibration of Survey Instrument.

Responsibilities :Area Demarcation by Total Station for Excavation of Earth &

Spot Level collecting for Excavated & Unexcavated Earth.

COMPUTER PROFICIENCY
  1. Operating System- Windows-98, 2000, Windows-XP, Vista, Windows-7, 8.
  2. Application Software- Auto Cad, MS-Word, MS-Excel, Internet Application.

PERSONAL PROFILE

Date of Birth : 11.02.1982

Sex : Male

Fathers Name : Mr. Sudhir Ranjan Dutta

Marritutial Status : Married

Children : One Daughter

Caste : General

Religion : Hindu

Nationality : Indian

Language Known : Bengali, Hindi & English

Extra Curricular Activities : Diploma in Computer Application

Salary Expected : Negotiable

I hereby declare that the above furnished details are true and correct to the best of my knowledge.

Yours Sincerely

Date: 06/04/2016 Manik Chandra Dutta

(Mob. 08013265341

Place: Garia, Kolkata 09836137698)