TENDER NO.SE/VC/TECH/TENDER-5/2008-2009

COPY NO.

ISSUED TO M/S ______

______

______

MAHARASHTRA STATE

ELECTRICITY DISTRIBUTION

COMPANY LTD.VASHI CIRCLE

CONVERSTION OF MSEDCL’S OVERHEAD LINES INTO UNDERGROUND CABLES CROSSING ON PANVEL-JNPT RAILWAY SECTION Near Kalundre Village Tal-Panvel, Dist.- Raigad (KM 69/54 – 69/56)

UNDER VASHI CIRCLE, NAVI MUMBAI.

Area of operation : Panvel-City S/Dn. Under Panvel)U) Dn..

Returnable not later than 14.30 hrs on 20.05.2008.

Tender will be opened at 15.30 hrs on 20.05.2008.

Estimated cost Rs 6.00 lacs

Office of the Superintending Engineer

Maharashtra State Electricity Distribution Co.Ltd.

Circle Office, Vashi, Tel.No:27890174

Plot No 5, Nr Abhudaya Bank Bldg, 27896730

Sector-17, Vashi, Navi Mumbai.

Price Rs 1,000.00 per Copy

(Rs 1,050.00 by Post)

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

CIRCLE OFFICE, VASHI.

TENDER NO.SE/VC/TECH/TENDER-5/2008-2009

CONVERSTION OF MSEDCL’S OVERHEAD LINES INTO UNDERGROUND CABLES CROSSING ON PANVEL-JNPT RAILWAY SECTION Near Kalundre Village Tal-Panvel, Dist.- Raigad (KM 69/54 – 69/56)

UNDER VASHI CIRCLE, NAVI MUMBAI.

I N D E X

------

Sr.No. Description Page No

------

1. Instructions to the tenderer 3-7

2. Letter to the tenderer 8

3. General conditions of contract 9-11

4. Safety Provision 12-13

5. Letter to the SUPERIENTENDING ENGINEER 14

6. Particulars of contractor 15- 20

Annexure I to VI

7. Schedule "A", "B” 21-24

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

CIRCLE OFFICE, VASHI.

TENDER NO.SE/VC/TECH/TENDER-5/2008-2009

INSTRUCTION TO TENDERER

1.   Sealed and superscribed item rate tenders are invited from reputed

licensed electrical contractors experienced in the work of

excavation and laying of cables, cable jointing, loading and un-

loading of material etc. for the following work.

Name of work: conversion of overhead 22 kv lines into underground

cables across railway track at three locations 1. Near Kalundre Village Tal-Panvel, Dist.- Raigad (KM 69/54 – 69/56)

3. Period of contract: Three months from date of issue of Work order

Including monsoon

4. Brief scope of work: Conversion of existing 22 kV overhead Lines

to underground cables on Panvel-JNPT section of

Railway Track. 22 Bhingari Incoming Feeder

(Two Nos of Cable for each 22 kV overhead crossing)

& Dismantling of overhead crossing Near Kalundre

Village Tal-Panvel, Dist.- Raigad (KM 69/54 – 69/56)

5. Area of operation: Geographical area of Panvel City S/ Dn., under

O & M Division Panvel (U)

6.   The tender documents shall be issued to the competent tenderers

on non-refundable cash payment of Rs. 1000/- per copy.

7.   An EMD of 1% of the Tendered value, subject to minimum of

Rs. 6,000/- shall be paid along with the tender by Demand Draft in favour of Maharashtra State Electricity Distribution Co. Ltd. drawn on any Schedule Bank situated in Mumbai. Tenders submitted without Earnest money is liable to be rejected.

8.   The tenders duly filled in shall be deposited in person in the office

of the Superintending Engineer MSEDCL, Vashi Circle, Vashi .

Tenders will be opened if possible on the due date at 15.30 hrs at

the above office in the presence of such tenderers who choose to

Remain present.

9.   The successful Tenderer shall be required to pay security deposit

Amounting to 5% of the value of the contract either by DD/

Cheque /Pay Order etc.

10.   Before submitting their offers the tenderer shall examine closely

all documents which form part of the contract to be entered into.

11.   This is a work to be executed according to our every day requirement. The tenderer is requested to get inspected all the

area particularly the roads and see for himself the site conditions

regarding approaches, material, water supply labour etc. and all

the other matter affecting the work before filling the tender.

12. The tenderers should be registered with the Government of

Maharashtra as an Electrical contractor. Documentary evidence

should be submitted along with tender. The licence number has

to be clearly indicated in the tender. Preference will be given to

the tenderer having experience in this job.

13. The Contractor shall be required to pay the labourers engaged by

him on the work not less than a Minimum wage( which expression

shall mean whether for whole time or piece work the respective

rates of wages as fixed under the law for the time being in force)

The contractor shall,be required not withstanding any provisions

in the contract to the contrary, cause to be paid such Minimum

Wages to labourers indirectly engaged on the work, including any

labour engaged by his labour contractors in connection with the

said work as if labourers had been immediately employed by him.

The contractor shall comply with the provisions of payment of

Wages Act, 1936, Minimum Wages Act, 1948, Employees Liability

Act 1938,Workmen’s Compensation Act 1923, Industrial Disputes

Act 1947, Indian Factories Act 1948, Maternity Benefit Act 1961,

E.P & M.P Act 1952 and Contract Labour (Regulation and

abolition) Act 1970 or any modification thereof or any other law

relating thereto and rules made there under from time to time,

and give effect to the provisions of any law for the time being

in force and regulating the rights and privileges of the labourers

employed by him directly or indirectly. The Tenderer will have to

furnish the documentary confirmation that facilities are made

available to the employees engaged by him on the job. The contractor shall indemnify the MSEDCL against any payments to be made under and for the observance of the regulations, for the time being in force without prejudice to his right to claim indemnify from his subcontractor.

14. The contractor shall be responsible for rectification of defects for

a period of 12 months from the certified day of completion of work

by the MSEDCL. This period of 12 months shall be known as Defects Liability period. Any defects or failures during this period shall be rectified within one week of intimation in writing. If the same is not carried out in the stipulated time, we shall have the right to get it repaired departmentally or through any other agency. The cost of the same shall be recovered from the contractor.

15. All the works should be guaranteed for the period of 12 months

From execution of work.

16. If the tenderer has any doubt about the meaning of any portion of

the tender he should at once get clarification from SUPERIENTENDING ENGINEER in writing sufficiently in advance and also personally meet him in this respect, before the due date. No additions or alterations in the tender form / conditions etc. should be made by the Tenderer. Tenderer should quote his percatange rates for the works

described in the schedules ‘B’ .

17. The tenderers must return the forms of schedules duly filled in

with rates in figures and in words and each schedule duly

signed. Any schedule not bearing the signature of the Tenderer,

the tender is likely to be rejected. Rates quoted for work should

be reasonable. Only one percentage in schedule ‘ B ’ rate should

be quoted. In case dual rates are quoted for the same, item the

offer is likely to be rejected. Tenderers should not offer rates for items not covered in this schedules and also should not split any item of the schedule doing so, may disqualify the offer. Discount on any account such as quantitative discount, payment discount etc., will not be considered for comparison of the rates, as such, rate should be on firm quotation basis only.

18. Special attention is invited to the requirements that all corrections

must be initiated and dated by the tenderer and that all the pages

should bear the full signature of the tenderer at the foot of each

page and each schedule should bear the seal of the tenderer.

19. Income Tax clearance certificate issued by the competent

authority in favour of the tenderer for the previous year is necessary Tenders which do not fulfil all or any of the above conditions or incomplete in any respect are liable to be rejected.

20. The submission of a tender by a tenderer implies that he has

read these instructions the conditions of contract etc., After

acceptance of the offer we shall not pay any extra charges for the

lead or for any other reasons in case the Tenderer is found later

on to have misjudged himself.

21. Tenders shall remain open for acceptance for a period of 90 days

from the date of opening of the tender. During this period no

tenderer shall be allowed to withdraw his offer. Any such with-

drawal during the said period will entail forfeiture of the Earnest

Money deposited with us.

22. The Tenderer should furnish details of his organisation, technical

experience, equipment and financial capacity to carry out the

works set out in the tender within the time stipulated for

completion. He shall furnish details of value of works, authority

under whom it was executed and period of completion.

23.   The contractor should have their office/Contact person in area

under O & M Division Panvel(U). The address along with the

name of contact person and Telephone number should

be furnished along with the offer.

24. The Tenderer will have to submit solvency certificate from

Nationalised/Scheduled Bank to the extent of Rs. 6 lacs.

Tender.

25. The Sale Tax on material or on transfer of property in goods

involved in the execution of work contract or any other material or

on furnished any fabricated material or work shall not be separat-

-ely paid as an addition to the Tender rates by the Distribution

Co. Ltd.. The rate for several items of work indicated are deem

to include all local and general taxes, excise duty etc.

Tenderer should attach a certified photocopy of Sales Tax/VAT

Registration certificate.

26. A copy of work contract registration should be enclosed if not the

Work contract tax as specified by the Government will be deducted

Directly from Contractor’s bill.

27. The contractor on placement of the work order enumerating the

contract condition shall within the prescribed period have to

execute a written agreement on the prescribed standard form as

per Distribution Co. Ltd.’s Rules. The regular stamp fees

etc necessary for completing the agreement shall have to

be borne by the contractor

28.The Contractor shall not entrust the work on sub

contract, transfer or assign the contract or any part thereof to

any other party. In case if it is not followed it will be treated

as breach of contract and will be terminated at contractor risk

and cost.

29. General conditions of the Work Contract are as per Annexure

"I" which shall form part of the contract. The contractor shall abide

by the “General condition of Distribution Co. Ltd.’s rules for contract.

30. The right to reject any or all the offers is reserved by us and we

will not be bound to accept any offer without assigning any reason

thereof.

SUPERIENTENDING ENGINEER

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

CIRCLE OFFICE, VASHI.

TENDER NO: SE/VC/TECH/TENDER- 5 /2008-09

IMPORTANT

The Bidder shall submit his offer in two envelopes

Envelope No.1 Qualifying Bid

No.2 Price Bid

Envelope No. 1: Qualifying bid shall have attested copies of

following documents

1.  Valid Labour Licence issued by Commissioner of Labour.

2.  Valid Electrical Contractor's Licence.

3.  Employees Provident Fund Establishment Code No. along with relevant documents.

4.  Employees State Insurance Corporation (E.S.I.C), Employees Code No. along with relevant documents.

5.  Valid Sale Tax/VAT registration.

6.  Valid Work Contract registration.

7.  Experience certificate regarding completion of similar type of work amounting to Rs.10 lacs in one calendar year.

8.  Solvency certificate of Rs 6 lacs issued by Nationalised/Scheduled bank.

9.  Receipt regarding payment of E.M.D.

Envelope No.2:

Price Bid shall have only Tender Document properly filled,

quoting your PERCENTAGE rates in schedule ‘ B ’.

Initially while opening the Tenders, the envelope No.1 i.e.

Qualifying Bid will be opened first. The price Bids of only

those bidders who have qualified in the qualifying Bid will

be opened. For qualification copies all the documents

mentioned above are required.The tenderer /his authorized

representative should be present at the time of opening of

the Tender, along with all originals of the above mentioned

documents for verification/ clarification.

SUPERIENTENDING ENGINEER

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

CIRCLE OFFICE, VASHI.

TENDER NO.SE/VC/TECH/TENDER-5/2008-2009

LETTER TO TENDERER

M/s ______

______

______

Dear Sirs,

Please quote your Lowest Percentage rates in Schedule ‘ B ’ for the work of excavation laying, refilling loading and unload of material etc, as per rates Schedule "A" & "B” and return the tender document duly filled-in, signed on each page. It is also requested to note the "Instructions to the Tenderers" before submitting the offer.

The area of operation shall be the geographical areas of Panvel-City.,

Under O & M Division Panvel(U)

Please note that your tenders will not be considered if following

conditions are not fulfilled.

1.  Payment of EMD (Item No. 7 Pg. No. 2)

2.  Submission of copy of Electrical contractors license (As per Item No. 12 Pg. No. 3)

3.  Work experience of Rs 10 lacs in one calendar year for similar type of works (Item No. 7 Pg. No.7)

4.  Submission of Income Tax clearance certificate (as per Item No.19 Pg. No.5)

5.  Submission of solvency certificate for an amount of Rs. 6 lacs (as per Item No. 24 Pg. No. 6 )

Yours faithfully,

SUPERIENTENDING ENGINEER

Vashi Navi-Mumbai- 400705

Date:

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.

CIRCLE OFFICE, VASHI.

TENDER NO.SE/VC/TECH/TENDER-5/2008-2009

1. Scope:

This Specification covers the excavation, laying of cables refilling

of trenches, cable jointing work, erection of HT/LT Pillars,

supply of labour, loading and unloading of material etc.

2.   The Contractor shall be required to excavate any part of land

either in kutchcha or pakka soils, tar road, asphalt or pavement within specified time and as per approved method. Surplus sub - soil shall be removed from the sites. The unwinding and rewinding of cable from and on drums shall be required to be done as per approved methods. The work includes excavation, laying cables through pipes at road crossings and nullhas etc. and refilling of trenches.