January 2008 RFP - Unit Contingent Fixed Price Product

PART 1
PROPOSAL SUBMISSION FORM

COVER SHEET

Note: The symbol  denotes required fields.

Bidder Name: / [FLD 1]
State of Incorporation or Organization: / [FLD 2] Note: Do not use an abbreviation in this field.
Type of Entity: / CorporationLimited Liability CompanyPartnershipLimited Partnership[FLD 3]
Credit Support Provider (if different from Bidder): / [FLD4]
Bidder Contact: / Name: [FLD 5]
Company: [FLD 6]
Street/P.O. Box: [FLD 7]
City, State, Zip Code: [FLD 8]
Phone Number: [FLD 9]
Fax Number: [FLD 10]
Federal Tax I.D. Number: [FLD 11]
Bidder E-mail Address: / E-mail Address: [FLD 12]
Ownership of Generating Facility: / [FLD 13]
Marketer of Generating Facility’s Capacity and Energy: / [FLD 14]
Name of Generating Facility: /  [FLD 15]
Location of Facility:
- County or Parish
- State: / [FLD 16]
[FLD 17]

PART 2
PROPOSAL SUBMISSION FORM
Unit Contingent Fixed Price Product

RESOURCE SUMMARY

Note: The symbol  denotes required fields

Is this Generating Facility a “Qualifying Facility”? / NoYes[FLD 18]
Size of Generating Facility: / [FLD 19] MW (Capacity at 97°F, 56% Relative Humidity, net of station service loads)
Generating Facility Configuration: / 1 x 12 x 1 3 x 1Other [FLD 20]
If “Other” then explain Generating Facility configuration here: [FLD 21]
Generating Facility’s Technology (CCGT, Solid Fuel or Other):
Equipment Make/Model/Supplier’s Name: / [FLD 22]
If “Other” then explain Generating Facilitytechnology here: [FLD 23]
[FLD 24]
Commercial Operation Date: / [FLD 25] (MM/DD/YYYY)
Control Area:
Entergy Interconnection Point or distance to the closest Entergy System substation or Interface to which transmission reservation is to be utilized:
If Control Area is not “Entergy” please identify the anticipated Interface with the Entergy System to which deliveries will be made: / [FLD 26]
 [FLD 27] Please specify the Entergy Interconnection Point to which deliveries will be made.
[FLD 28]
Fuel Type (Primary): / natural gascoalpetcokelignitenuclearOther (specify)[FLD 29]
If “Other” specify Fuel Type here: [FLD 30]
Multiple Fuel Capability:
(identify types if applicable): / NoYes[FLD 31]
If “Yes” specify Fuel Type here: [FLD 32]

PART 3
PROPOSAL SUBMISSION FORM
Unit Contingent Fixed Price Product

ECONOMIC AND OPERATIONAL

Instructions:Furnish the information requested by this Proposal Submission Form.

Capacity Quantity / [FLD 33] MW
100 MW or greater per proposal, up to approximately 250 MW per proposal.
Product Type
(Choose one) / (none selected) [FLD 34]
7 x 24 Product
7 x 16 / 7 x 8 Combined Product
5 x 16 Product
Energy Payment
Select one of the following energy price options:
1.)Fixed Energy Price
2.)Fixed Heat Rate multiplied by the Gas Price
3.)Combined Product
If bidder selected option 1 above, enter the Fixed Energy Price. If bidder selected option 2 above, enter the Fixed Heat Rate for the specified Capacity Quantity above and the Fixed Gas Basis Adder. If bidder selected option 3 above, enter an on-peak and off-peak value for Fixed Energy Price, Fixed Heat Rate, or a combination of both.
Note on Gas Price: The Gas Price will be the levelized (i.e. single value) NYMEX Henry Hub forward gas price for the 5 year period beginning January 1, 2009 and ending December 31, 2013.
If the primary fuel is something other than gas, Bidder must specify a Fixed Energy Price. / 123[FLD 35] Select 1, 2 or 3
[FLD 36]$/MWhFixed Energy Price
[FLD 37]Btu/kWhFixed Heat Rate
[FLD 38] $/MMBtuFixed Gas Basis Adder
Fuel Supply and Transportation
Provide information on the proposed firm fuel supply and transportation arrangements including pipelines, fuel supply sources, type of transportation service and any other relevant information. /  [FLD 39]
Credit/Collateral Requirements
All proposals must specify, in detail, all credit terms expected for the purchaser and the bidder’s ability and plans to meet the bidder credit requirements. /  [FLD 40]

The statements contained in this Product Package are made subject to the Reservation of Rights set forth in the RFP

JANUARY 2008 RFP – JANUARY 7, 2008

January 2008 RFP - Unit Contingent Fixed Price Product

Special Considerations
Bidders should be aware that ESI will not negotiate any material terms unless (a) a resource is otherwise attractive but not physically capable of meeting a requirement specified in the Summary of Principal Terms and (b) the bidder has explained the fact of and basis for this situation in this section of its proposal. Please describe in detail any special items which ESI should take into consideration.[FLD 41]

The statements contained in this Product Package are made subject to the Reservation of Rights set forth in the RFP

JANUARY 2008 RFP – JANUARY 7, 2008

January 2008 RFP - Unit Contingent Fixed Price Product

Contact Name:

Title/Position:

Signature:

The statements contained in this Product Package are made subject to the Reservation of Rights set forth in the RFP

JANUARY 2008 RFP – JANUARY 7, 2008