INDEPENDENT CLEANUP PATHWAY FINAL REPORT

For [insert name and location of site]

ECSI No:

Date:

Prepared For:

[Insert name, address and phone number of client.]

Prepared By:

[Insert name, address and phone number of authoring firm and Oregon Registered Geologist or Professional Engineer stamp.]

Guide For Preparing

Independent Cleanup Pathway Reports

Updated 3/21/01

EXECUTIVE SUMMARY

[Summarize the investigation steps and results, and cleanup actions completed, if any. Include description of the source(s), nature, extent and distribution of contamination, potential migration pathways, and the current and future risk that contamination poses to human health and the environment. Show that any proposed or completed cleanup actions are protective of human health and the environment; and treats hot spots of contamination to the extent feasible. Describe the residual risk following completion of the removal or remedial action.]

Table of Contents

Guide For Preparing

Independent Cleanup Pathway Reports

Updated 3/21/01

List of Figures......

List of Tables......

List of Appendices......

1.0 Introduction......

1.1 Project Introduction......

1.2 Purpose and Objectives......

2.0 Site Background......

2.1 Site Location......

2.2 Site Description......

2.3 Site History and Facility Operations......

2.3.1 Ownership History......

2.3.2 Operating History......

2.4 Regulatory History......

2.5 Previous Investigation......

3.0 Environmental Setting......

3.1 Climate Information......

3.2 Topography......

3.3 Surface Water Hydrology......

3.4 Regional and Site Geology and Soils......

3.5 Hydrogeology......

4.0 Site Investigation......

4.1 Site Characterization Plan......

4.2 Sampling Methods......

4.3 Sampling Results......

5.0 Sources, Nature and Extent of Contamination......

5.1 Define the Source(s) of Contamination......

5.2 Nature of Contamination......

5.3 Extent of Contamination......

5.3.1 Soil......

5.3.2 Groundwater......

5.3.3 Other Media......

6.0Exposure Pathway Summary......

6.1 Groundwater Pathways of Exposure......

6.2 Direct Contact (Soil, Structures) Pathways of Exposure......

6.3 Surface Water and Sediment Pathways of Exposure......

6.4 Air Pathways of Exposure......

7.0 Contaminant Fate and Transport......

7.1 Contaminant Transport......

7.2 Contaminant Degradation/Persistence......

7.3 Demonstration of No Impact to Groundwater......

7.4 Preliminary Hot Spot Determination......

7.5 Conceptual Site Model......

7.6 Locality of the Facility......

8.0 Land and Water Use Determinations......

8.1 Current and Future Land Use......

8.2 Beneficial Uses of Water......

9.0 Risk Assessment......

9.1 Baseline Human Health Risk Assessment......

9.2 Baseline Ecological Risk Assessment......

10.0 Cleanup Standards and Hot Spots......

10.1 Selection of Cleanup Standards......

10.2 Final Hot Spot Determination......

11.0 Feasibility Study......

11.1 Development of Remedial Action Alternatives......

11.2 Evaluation of Remedial Action Alternatives......

11.3 Recommended Remedial Action......

12.0 Removal or Remedial Action Report......

12.1 Work Completed......

12.2 Verification Sampling......

12.3 Engineering Controls......

12.4 Institutional Controls......

13.0 Residual Risk......

13.1 Residual Risk Assessment......

13.2 Protection of Human Health and the Environment......

13.3 Inspection and Maintenance Program......

13.4 Residuals Management Plan......

14.0 References......

Guide For Preparing

Independent Cleanup Pathway Reports

Updated 3/21/01

List of Figures

  1. Site Location Map
  2. Site Features Map
  3. Sample Location Map
  4. Geologic Cross Section
  5. Groundwater Elevation Contour Map
  6. Hydrogeologic Conceptual Model
  7. Extent of Soil Contamination
  8. Extent of Groundwater Contamination
  9. Conceptual Site Exposure Model

List of Tables

  1. Site History
  2. Compounds of Interest
  3. Well Construction Details
  4. Analytical Sampling Schedule
  5. Groundwater Elevation Data
  6. Soil Analytical Data
  7. Groundwater Analytical Data
  8. Preliminary Remedial Goals (PRGs)

List of Appendices

  1. Site History (aerial photographs, historical site plans, etc.)
  2. Elevation Survey Maps
  3. Field Investigation Procedures
  • Drilling Method
  • Logging
  • Sampling Methods (soil, groundwater, sediment)
  • Analytical Schedule
  • Chain-of-Custody Procedures
  • Decontamination Procedures
  • QA/QC
  • PID Measurements
  • Investigation Derived Waste Management
  • Record Keeping
  1. Boring Logs/Well Completion Diagrams (if applicable)
  2. Laboratory Data Reports
  3. Well Survey/Beneficial Use Determination Documentation (if applicable)
  4. Geophysical Survey Reports (if applicable)
  5. Site-Specific Health and Safety Plan
  6. Disposal Receipts

Guide For Preparing

Independent Cleanup Pathway Reports

Updated 3/21/01

1.0 Introduction

1.1 Project Introduction

1.2 Purpose and Objectives

2.0 Site Background

2.1 Site Location

2.2 Site Description

2.3 Site History and Facility Operations

2.3.1 Ownership History

2.3.2 Operating History

2.4 Regulatory History

2.5 Previous Investigation

3.0 Environmental Setting

3.1 Climate Information

3.2 Topography

3.3 Surface Water Hydrology

3.4 Regional and Site Geology and Soils

3.5 Hydrogeology

4.0 Site Investigation

4.1 Site Characterization Plan

4.2 Sampling Methods

4.3 Sampling Results

5.0 Sources, Nature and Extent of Contamination

5.1 Define the Source(s) of Contamination

5.2 Nature of Contamination

5.3 Extent of Contamination

5.3.1 Soil

5.3.2 Groundwater

5.3.3 Other Media

6.0Exposure Pathway Summary

6.1 Groundwater Pathways of Exposure

6.2 Direct Contact (Soil, Structures) Pathways of Exposure

6.3 Surface Water and Sediment Pathways of Exposure

6.4 Air Pathways of Exposure

7.0 Contaminant Fate and Transport

7.1 Contaminant Transport

7.2 Contaminant Degradation/Persistence

7.3 Demonstration of No Impact to Groundwater

7.4 Preliminary Hot Spot Determination

7.5 Conceptual Site Model

7.6 Locality of the Facility

8.0 Land and Water Use Determinations

8.1 Current and Future Land Use

8.2 Beneficial Uses of Water

9.0 Risk Assessment

9.1 Baseline Human Health Risk Assessment

9.2 Baseline Ecological Risk Assessment

10.0 Cleanup Standards and Hot Spots

10.1 Selection of Cleanup Standards

10.2 Final Hot Spot Determination

11.0 Feasibility Study

11.1 Development of Remedial Action Alternatives

11.2 Evaluation of Remedial Action Alternatives

11.3 Recommended Remedial Action

12.0 Removal or Remedial Action Report

12.1 Work Completed

12.2 Verification Sampling

12.3 Engineering Controls

12.4 Institutional Control

13.0 Residual Risk

13.1 Residual Risk Assessment

13.2 Protection of Human Health and the Environment

13.3 Inspection and Maintenance Program

13.4 Residuals Management Plan

14.0 References

APPENDICES

Guide For Preparing

Independent Cleanup Pathway Reports

Updated 3/21/01