HR4500 Series – ReliantWindow& Door Maintenance Manual
General Description
The HR4500 Series windows and doors are constructed from hot rolled steel sections and are equipped with fully welded sections. All units receive double weatherstripping and multi-point locking hardware on windows and doors unless otherwise specified. Standard undercoating is a Zinc enriched primer and either Galvanizing or E-coating are optional. All units have a 10 year warranty available please see sample warranty and instructions.
Message from Optimum
The information contained in this manual was current at the time of issue. Optimum Window Mfg. Corp is constantly improving and upgrading their products. We ask that you consult us for new or updated information before any major repairs.
This manual was written with regard for the safety of workers and bystanders; however normal safety procedures take precedence over the guidelines provided here. Consult OSHA codes and local building regulations when working above sidewalks, pathways, or other locations where falling debris may cause injury to personnel.
Please contact Optimum Window Mfg. Corp. (845.647.1900) regarding any error or suggestions pertaining to this manual.
Table of Contents
Glass Replacement……………………………………………………………...pg 1
Cleaning Conditions………………………………………………………….....pg 2
Glass Replacement
The glass on HR4500Window is easily replaced by removal of the metal glazing beads.
1)Start by removing all glazing beads.
2)Carefully pry the glazing bead from the window starting with the vertical or shorter sections first. Once the interior items have been removed, such as the glazing bead and muntins, score the silicone on the exterior and/or interior with a utility knife to separate the glass from the frame.
3)Clean debris from the interior of the frame using a cleaning solution making sure to remove all traces of old glazing tape. Apply new glazing tape to the perimeter of the frame.
4)The replacement glass must be as specified by client. Minimum size of the glass is 7/8” larger than daylight opening of the sash. Glass may be up to 1” larger than daylight opening.
5)Next, add setting blocks and begin installation of new glass in place.
6)Replace lastperimeter glazing bead removed back in original position first. Next, replace all remaining glazing beads starting with the last bead removed, working backwards. If used, replace muntins and finally seal the exterior of the frame with glazing sealant.
*Refer to Installation Manual
Cleaning Conditions
The cleaning recommendations are an integral part of the warranty, given for gloss, color retention, and chalking. Regular cleaning must be performed periodically, at least once a year and twice a year for structures directly exposed to areas with high corrosive conditions and or high salt concentration, such as waste water treatment plants and coastal applications.
- Clean water with slight amounts of mild alkaline detergents must be used.
- The cleaning effect maybe increased by rubbing with a soft, non scratching cloth with modest pressure.
- The temperature of the parts to be cleaned must not exceed 80 degrees F.
- For removal of grease and oily substances isopropyl alcohol may be used.
- The cleaning solution must not be allowed to react for more than 1 (one) hour.
- After cleaning, the surfaces must be rinsed with clean, cold water.
- A proper maintenance record has to be kept and documented. This documentation must contain the following information; date, name and address of performing party, description of cleaning procedure and detergents used, and signature of person performing the cleaning procedure.