Plymouth Municipal Airport

Hangar Construction Guidelines and Application

The Airport Manager, acting for the Commission, must be updated on any changes to the information provided and shall be kept informed of all aspects of the proposed project through written monthly progress reports.

Applicants proposing commercial operations must review, understand and comply with all the requirements outlined in the Minimum Standards for Commercial Aeronautical Activities document (12 pages, revised 11/14), available online @ pymairport.com.

The Plymouth Airport Commission is the only entity allowed to sell and dispense fuel at Plymouth airport.

Applicants must comply with all federal, state, and local regulations and rules, including those relating to permits. The Commission makes no representation as to the suitability or conditions of airport sites or the ability of applicants to obtain local permits. All local (Carver or Plymouth) building requirements must be met; the Commission is not responsible if local permitting authorities do not meet the applicants' expectations.

Full monthly rental payments shall begin upon the issuance of a local building permit or 120 days, whichever comes first, and must be paid within 30 days of the permit issuance date.

Commission approval will be rescinded if the applicant is not able to comply with the above-stated rules and adhere to the following schedule:

  • Complete the project within 365 days,
  • Meet the construction schedule milestone requirements related to zoning/FAA 74.60 (60 days),
  • Full site plans (90 days),
  • Local permits (120 days),
  • Construction commencement (150 days), as listed in the Commission's Hangar Design and Siting Policy, available online @ pymairport.com.

Appeals of any decisions made by the Airport Manager related to applications must be made in writing to the Plymouth Airport Commission.

Hangar Construction Application

Applicant Name: ______Phone: ______Date: ______

Company Name: ______Email: ______

Address: ______City: ______State: ______Zip: ______

O CorporationO PartnershipO IndividualO Other

Nature of the proposed operation (please be specific):

Number of aircraft to be housed ______Number of aircraft tiedowns needed ______

Nature of aircraft operation ______Type of aircraft ______

Commercial Operation: Yes ______No ______Rental of hangar space: Yes ______No ______

Proposed Hangar Location (attach Drawing) Plymouth ______Carver ______

Proposed Hangar Dimensions ______feet X ______feet, Total area ______

Square footage Office space ______Square footage restrooms ______

Proposed: Permits by ______Start of Construction ______Completion ______

Construction Material: ______Building color ______

Building manufacturer: ______

List attached documents:

Signature ______Date ______Print Name: ______

Form approved 4/3/15