Plymouth Municipal Airport
Hangar Construction Guidelines and Application
The Airport Manager, acting for the Commission, must be updated on any changes to the information provided and shall be kept informed of all aspects of the proposed project through written monthly progress reports.
Applicants proposing commercial operations must review, understand and comply with all the requirements outlined in the Minimum Standards for Commercial Aeronautical Activities document (12 pages, revised 11/14), available online @ pymairport.com.
The Plymouth Airport Commission is the only entity allowed to sell and dispense fuel at Plymouth airport.
Applicants must comply with all federal, state, and local regulations and rules, including those relating to permits. The Commission makes no representation as to the suitability or conditions of airport sites or the ability of applicants to obtain local permits. All local (Carver or Plymouth) building requirements must be met; the Commission is not responsible if local permitting authorities do not meet the applicants' expectations.
Full monthly rental payments shall begin upon the issuance of a local building permit or 120 days, whichever comes first, and must be paid within 30 days of the permit issuance date.
Commission approval will be rescinded if the applicant is not able to comply with the above-stated rules and adhere to the following schedule:
- Complete the project within 365 days,
- Meet the construction schedule milestone requirements related to zoning/FAA 74.60 (60 days),
- Full site plans (90 days),
- Local permits (120 days),
- Construction commencement (150 days), as listed in the Commission's Hangar Design and Siting Policy, available online @ pymairport.com.
Appeals of any decisions made by the Airport Manager related to applications must be made in writing to the Plymouth Airport Commission.
Hangar Construction Application
Applicant Name: ______Phone: ______Date: ______
Company Name: ______Email: ______
Address: ______City: ______State: ______Zip: ______
O CorporationO PartnershipO IndividualO Other
Nature of the proposed operation (please be specific):
Number of aircraft to be housed ______Number of aircraft tiedowns needed ______
Nature of aircraft operation ______Type of aircraft ______
Commercial Operation: Yes ______No ______Rental of hangar space: Yes ______No ______
Proposed Hangar Location (attach Drawing) Plymouth ______Carver ______
Proposed Hangar Dimensions ______feet X ______feet, Total area ______
Square footage Office space ______Square footage restrooms ______
Proposed: Permits by ______Start of Construction ______Completion ______
Construction Material: ______Building color ______
Building manufacturer: ______
List attached documents:
Signature ______Date ______Print Name: ______
Form approved 4/3/15