House # A 2737 phase 02 00923332524729
Gulshan-E-Hadid Bin Qasim 0092297830388
Karachi Sindh Pakistan
Asadullah Habibani
ObjectiveWorking in a mission of professional development by taking up challenging assignments keeping in view a goal of carrier building in petrochemicals and assuring to provide effective maintenance services by meticulous planning and systematic approach.
Total Experience
Control Room Operator8.0 years
QualificationUniversity/CountryYear
Bachelor of ScienceUniversity of Sindh Jamshoro Pakistan2003
DAE Petroleum Board of Technical Education Karachi 2007
Position holder
Receive Medal award.
Diploma InformationBoard of Technical Education Karachi 2008
Technology in Computer
Achievements
I have got position and receive medal from Sindh Board of Technical Education Karachi in DAE petroleum technology.
Certified during erection and commissioning of Viscose preparation section with Chinese delegation at chemi visco fibre plant Nawabshah.
Appreciate certificate during erection and commissioning of Ethanol Dehydration Unit with French delegation at Unicol ethanol Refinery.
Currently Working June 2010 to date with Tuwairqi Direct reduce Iron plant (Al-Tuwairqi Group of Industries (Saudi Arabia))
I am working as a Control room operator. The plant capacity is 1.28 million ton/Annum of Direct Reduce Iron complete gas processing plant.
I have completed these activities during commissioning
1.0Hydro test, pressure test during commissioning
2.0Heavy Process Gas centrifugal compressor (capacity 193000 m3/hr)
3.0Lobe type/ piston type compressors
4.0Hydraulic system and Burden feeder
5.0Reformer, Heat Recovery system.
6.0Centrifugal Air Blower (280000 nm3/hr
7.0Asia’s largest Reverse Osmosis plant(capacity 260 ton/hr)
8.0Classifier, Clarifier
9.0Plant is completely adopted on Honeywell DCS system.
Employment History May, 2007 to June 2010 at Unicol Ethanol Refinery plant, “Shift Engineer Production”
Unicol ethanol Refinery plant uses latest Honeywell DCS system I have completed erection and commissioning with the help of P&IDs, PFDs,EI diagramsand Isometric drawings. I am monitoring these section and equipment.
- Dehydration unit 2.0 Ethanol distillation
3.0Reverse Osmosis plant4.0Steam Boiler operation
5.0 Effluent treatment plant
6.0 loading/unloading of molasses and alcohol
7.0 Mash preparation section8.0 Pre fermentation section
9.0 Fermentation section.10.0 Operation of clarifier
11.0 Operation of Air Blower and Compressors.
12.0 Corrosion inhibitor system and Acid handling system
13.0 Sand filters/ carbon filter operation
14.0 Molasses handling and molasses dispatch system.
15.0 I have expertise in plant start-up and shutdown and troubleshooting.
April 2006 to May 2007 at Dewan Ethanol Refinery plant, “Senior DCS Operator”
Dewan Ethanol Refinery uses latest Honeywell DCS system it is designed by “Maguin interis”. I worked as a Senior DCS Process Operator. I am operating these sections.
1Dehydration unit of ethanol2.0 Ethanol distillation
- Reverse Osmosis plant4.0 Mash preparation Section
5.Loading/unloading of molasses and alcohol
6.0Pre fermentation section (Batch process)
7.0 Fermentation section (Batch process)
August 2004 to April 2006 at Al-Abbas Ethanol Refinery plant, “Plant Officer”
Al-Abbas Ethanol Refinery uses latest Honeywell DCS system it is designed by “Maguin interis”. There are two plant each plant capacity of 85000 litters /day. I worked as a Plant officer. I am controlling these sections.
- Ethanol distillation2. Effluent treatment plant
3.Mash preparation Section
4.Loading/unloadingof molasses and alcohol
5.Pre fermentation section(Continues Process)
6.Fermentation section (Continues Process)
August 2003 to August 2004 atChemi Visco Fibre Nawabshah
Chemi Visco Fibre Nawabshah uses latest Freelance2000 DCS system and the plant has complete adoptability with DCS System. I worked as a DCS operator at viscose preparation section.I worked through the erection and commissioningperiod with Chinese delegation.I started Viscose preparation section for the first time through DCS during commissioning in Chemi Viscose fibre Nawabshah, with assistance of Chinese delegation. I am operating theses sections
1.0Soda lye section
2.0Sulfurization Section
3.0Ageing & Pressing section
4.0Ripening section
5.0Recovery section
Internship Internship in BP Pakistan E&P Inc;
British Petroleum is a multinational and largest oil producing company in the world. During my internship period I learnt many plant procedures likewise
1.Di-ethanol amine process (CO2 Removal System)
2.Tri ethylene glycol process (Dehydration system)
3.Gas Compressorssingle stage, double stage, Triple stage (Piston type )
4.High pressure, intermediate pressure, low pressure separation.
5.Heater Treater functions, pigging.
6.Water injection system, test separator monitoring
7.Filtration unit, Gun Barrels & Crude oil Tanks
8.I have been involved in Dispatching of Crude oil and sampling for PTB.
I participated in a Shutdown activity. Where I learned about the Shutdown/Start-up procedureI also gone through all the procedures policies for the safe working environment of BP and learned about the Permit to Work System, Task Risk Assessment, Isolation certification etc. while at BP Pakistan I learned many modern and effective ways of safety assurance just like BP’s HSE policy and BP’s concern toward a betterenvironment
Personal Detail
Father nameAbdul Razzaque Habibani
Date of BirthMarch 24 1983
N-I-C# 41105-1103487-5
Passport # AB6034871
Reference
Available upon request
Page 1 of 3