This MANU-SPEC(TM) utilizes the Construction Specifications Institute (CSI) Manual of Practice, including MasterFormat(c), SectionFormat(c) and PageFormat(c). A MANU-SPEC is a manufacturer specific proprietary product specification using the proprietary method of specifying applicable to project specifications and master guide specifications. Optional text indicated by brackets []; delete optional text in final copy of specification.
This MANU-SPEC specifies plastic unit skylights, as manufactured by Naturalite(TM) Skylights Systems, Oldcastle Glass® Engineered Products. Revise MANU-SPEC section number and title below to suit project requirements, specification practices and section content. Refer to CSI MasterFormat for other section numbers and titles.
SECTION 08620 UNIT SKYLIGHTS
(PLASTIC UNIT SKYLIGHTS)
PART 1 - GENERAL
1.01SUMMARY
A. The work of this Section includes unit skylights.
Note: Edit paragraph below for type of unit skylights to suit project requirements.
Types: Types of unit skylights include:
Curb-mounted skylights.
Insulated curb skylights - double wall.
Insulated curb skylights - single wall with a wood nailer.
Insulated curb skylights - single wall, wood nailer, with removable counter flashing
Ridge type skylights.
Circular skylights.
In-Tandem skylights.
Cluster skylights.
Vertex™ curb-mounted skylights.
Vertex™ self-flashing skylights.
Vertex2™ curb-mounted skylights.
Vertex2™ self-flashing skylights
Continuous Vaulted non-thermalized skylights
Continuous Vaulted thermalized skylights
Versalite™ Pre-glazed skylights.
Versaridge™ Pre-glazed skylights.
Tubular skylights.
Hurricane Resistant skylights (curb mount).
Hurricane Resistant skylights (self-flashing).
A. Specifier Note: Revise paragraph below to suit project requirements. Add section numbers and titles per CSI Master-Format and specifier’s practice.
B. Related Sections: Section(s) related to this section include:
1.Built-Up Bituminous Roofing: Division 7 Built-Up Roofing Sections.
2.Modified Bituminous Sheet Roofing: Division 7 Modified Bituminous Roofing Sections.
3.Single Ply Membrane Roofing: Division 7 Single Ply Roofing Sections.
4.Flashing and Sheet Metal: Division 7 Flashing and Sheet Metal Section.
5.Sheet Metal Roofing: Division 7 Sheet Metal Roof Section.
Specifier Note: Article below may be omitted when specifying manufacturer's proprietary products and recommended installation. Retain Reference Article when specifying products and installation by an industry reference standard. If retained, list standard(s) referenced in this section. Indicate issuing authority name, acronym, standard designation and title. Establish policy for indicating edition date of standard referenced. Conditions of the Contract or Division 1 References Section may establish the edition date of standards. This article does not require compliance with standard, but is merely a listing of references used. Article below should list only those industry standards referenced in this section.
1.02REFERENCES
A.General: Standards listed by reference, including revisions by issuing authority, form a part of this specification section to extent indicated. Standards listed are identified by issuing authority, authority abbreviation, designation number, title or other designation established by issuing authority. Standards subsequently referenced herein are referred to by issuing authority abbreviation and standard designation.
B.Aluminum Association (AA):
1.Specifications for Aluminum Structures.
C.American Architectural Manufacturers Association (AAMA):
1.2603-98 Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels.
2.2604-98 Voluntary Specification for High Performance Organic Coatings on Architectural Extrusions and Panels.
3.611-98 Specification for Anodized Architectural Aluminum.
D.American Society for Testing and Materials, ASTM:
D4802 Specification for Poly (Methyl Methacrylate) Acrylic Plastic Sheet.
ASTM E283 Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls and Doors.
ASTM E330 Test Method for Structural Performance of Exterior Windows, Curtain Walls and Doors by Uniform Static Air Pressure Difference.
E331 Test Method for Water Penetration of Exterior Windows, Curtain Walls and Doors by Uniform Static Air Pressure Difference.
E.National Roofing Contractors Association (NRCA):
1.Roofing and Waterproofing Manual.
Specifier Note: Article below should be restricted to statements describing design or performance requirements and functional (not dimensional) tolerances of a complete system. Limit descriptions to composite and operational properties to extent necessary to link multiple components of a system, and to interface with other systems.
1.03SYSTEM DESCRIPTION
A.Performance Requirements: Provide roof accessories which have been manufactured, fabricated and installed to withstand loads from [Specify code/standard reference.] and to maintain [Specify performance criteria.] performance criteria stated by manufacturer without defects, damage or failure.
B.Unit Skylight Performance Requirements:
Specifier Note: Edit Performance Requirements paragraph below for loads to suit project requirements. Roof accessories are commonly used in low-rise construction where roof elevations do not exceed 60 feet above grade. Plastic glazing materials are not designed to support live loads or concentrated impact type loads. "Risk of fall" label is applied to each dome to warn of potential danger. (1) Performance Requirements: Referenced standards establish the level of quality of unit skylights available from quality manufacturers conforming to industry standards. (2) Condensation: Under certain conditions of high humidity and/or large inside to outside temperature differentials, condensation may occur on the aluminum framing and plastic glazing material. Thermally broken frames can be specified to help control compensation on aluminum framing. Double glazing will usually reduce the occurrence of condensation on the plastic, but will not totally eliminate it. The condensation that forms between the double layers of plastic will normally dissipate as the airspace is heated by the sun. Sealed domes are more resistant to the formation of condensation and will reduce accumulation of dust and foreign matter. Sealed domes are available for most dome glazed unit skylights at additional cost.
Specifier Note: Edit paragraph below. Specify values, minimum 20 psf recommended.
1. Design framing and dome infill assembly to support the following load requirements:
a.[30] [40]-psf snow load plus dead load.
b.[30] [40]-psf negative wind or uplift load plus dead load.
2. Fabrication and installation of unit skylights shall comply with governing building code.
Specifier Note: Article below includes submittal of relevant data to be furnished by Contractor either before, during, or after construction. Coordinate this article with Architect's and Contractor's duties and responsibilities in Conditions of the Contract and Division 1 Submittal Procedures Section.
1.04SUBMITTALS
A.General: Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedures Section.
B.Product Data: Submit product data, for specified products.
C.Shop Drawings: Submit shop drawings showing layout, profiles, and product components, including anchorage, accessories, finishes and colors.
1.Submit shop drawings for approval prior to fabrication. Include details of framing members, glazing materials where applicable, sealants, fasteners, anchors and thicknesses and types of formed flashing and closures.
D.Samples: Submit selection and verification samples for finishes, colors and textures.
1.Glazing Samples: Submit a verification sample of plastic glazing material in specified color.
2.Finish Samples: Submit a verification sample of aluminum finish in specified color.
E.Quality Assurance Submittlas: Submit the following:
1.Test Reports: Certified test reports showing compliance with specified performance characteristics and physical properties.
2.Certificates: Product certificates signed by manufacturer certifying materials comply with specified performance characteristics and criteria, and physical requirements
3.Manufacturer’s Instructions: Manufacturer’s installation instructions.
4.Specifier Note: Coordinate paragraph below with Part 3 Field Quality Requirements Article herein. Retain or delete as applicable.
5.Manufacturer’s Field Reports: Manufacturer’s field reports specified herein.
F.Closeout Submittals: Submit the following:
1.Operation and Maintenance Data: Operation and maintenance data for installed products in accordance with Division 1 Closeout Submittals (Maintenance Data and Operation Data) Section. Include methods for maintaining installed products, and precautions against cleaning materials and methods detrimental to finishes and performance.
2.Warranty: Warranty documents specified herein.
Specifier Note: Article below should include prerequisites, standards, limitations and criteria which establish an overall level of quality for products and workmanship for this section. Coordinate below article with Division 1 Quality Assurance Section.
1.05QUALITY ASSURANCE
A.Qualifications:
Installer Qualifications: Installer experienced in performing work of this section who has specialized in installation of work similar to that required for this project.
Installer: Unit skylights shall be installed by workmen with a minimum of 2 years experience in installation of similar units.
Manufacturer Qualifications: Manufacturer capable of providing field service representation during construction, approving acceptable installer and approving application method.
Manufacturer: Unit skylights shall be manufactured by a firm with a minimum of 10 years experience in the fabrication and installation of plastic unit skylights. Manufacturers proposed for use, which are not named in this Section, shall submit evidence of ability to meet performance and fabrication requirements specified not less than 10 days prior to bid date, and shall include a list of projects of similar design and complexity completed within the past five years.
Specifier Note: Paragraph below should list obligations for compliance with specific code requirements particular to this section. General statements to comply with a particular code are typically addressed in Conditions of the Contract and Division 1 Regulatory Requirements Section. Repetitive statements should be avoided.
B. Regulatory Requirements:[Specify applicable requirements of regulatory agencies]
Specifier Note: Retain paragraph below for erected assemblies (either onsite or offsite) required for review of construction, coordination of work of several sections, testing, or observation of operation. Mock-ups, when accepted or approved, establish standards by which work will be judged. Coordinate below with Division 1 Quality Control (Mock-Up Requirements) Section.
Specifier Note: Article below should include special and unique requirements. Coordinate article below with Division 1 Product Requirements Section.
1.06DELIVERY, STORAGE & HANDLING
A.General: Comply with Division 1 Product Requirements Sections.
B.Ordering: Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays.
C.Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. Sequence deliveries to avoid delays, but minimize on site storage.
D.Storage and Protection: Store materials protected from exposure to harmful weather conditions and at temperature and humidity conditions recommended by manufacturer.
1.Protect from damage from sunlight, weather, excessive temperatures and construction operations.
1.07PROJECT CONDITIONS
A.Field Measurements: Verify actual measurements/openings by field measurements before fabrication; show recorded measurements on shop drawings. Coordinate field measurements and fabrication schedule with construction progress to avoid construction delays.
1.Measurements: Take accurate field measurements before fabrication. Do not delay job progress; allow for field tolerances if taking field measurements before fabrication is not possible.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 1 Closeout Submittals (Warranty) Section.
1.08WARRANTY
A.Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
Specifier Note: Coordinate paragraph below with manufacturer's warranty requirements. Manufacturer offers the Following: Plastic Unit Skylight Warranty: Provide written five-year warranty signed by manufacturer, agreeing to repair or replace work which exhibits defects in materials or workmanship and guaranteeing weathertight and leak free performance. "Defects" is defined as uncontrolled leakage of water and abnormal aging or deterioration.
B.Manufacturer’s Warranty: Provide written warranty signed by manufacturer, agreeing to repair or replace work which exhibits defects in materials or workmanship and guaranteeing weather tight and leak free performance. "Defects" is defined as uncontrolled leakage of water and abnormal aging or deterioration.
1.Skylight Warranty: Provide written warranty signed by manufacturer, agreeing to repair or replace work, which exhibits defects in materials or workmanship and guaranteeing weather tight, and leak free performance. "Defects" is defined as uncontrolled leakage of water and abnormal aging or deterioration.
2.Warranty Period: 5 years commencing on date of invoice.
C.Finish Warranty: Provide written warranty signed by manufacturer and finisher, agreeing to repair or replace work that exhibits defects in finish. "Defects" is defined as peeling, chipping, chalking, fading, abnormal aging or deterioration, and failure to perform as required.
1.Warranty Period for Anodized Finish: One year from date of application for film integrity.
2.Warranty Period for Baked Enamel Finish: One year from date of application for film integrity.
3.Warranty Period for Fluoropolymer Finish: Five years from date of application for color and film integrity.
PART 2 - PRODUCTS
Specifier Note: Retain article below for proprietary method specification. Add product attributes, performance characteristics, material standards, and descriptions as applicable. Use of such phrases as "or equal" or "or approved equal," or similar phrases may cause ambiguity in specifications. Such phrases require verification (procedural, legal and regulatory) and assignment of responsibility for determining "or equal" products.
2.01UNIT SKYLIGHTS
A.Manufacturer: Naturalite Skylight Systems, Oldcastle Glass® Engineered Products.
1. Specifier Note: Paragraph below is an addition to CSI SectionFormat and a supplement to MANU-SPEC. Retain or delete paragraph below per project requirements and specifier's practice.
1.Contact: P.O. Box 629, 750 Airport Road, Terrell, TX 75160; Telephone: (800) 527-4018, (972) 551-6400; Fax (972) 551-6420
B. Proprietary Product(s)/System(s): Naturalite Plastic Unit Skylights
1.Materials: For each type of material required for the work of this Section, provide primary materials which are the products of one manufacturer. Provide secondary materials which are acceptable to the manufacturers of the primary materials.
Specifier Note: Edit article below to suit project requirements. If substitutions are permitted, edit text below. Add text to refer to Division 1 Project Requirements (Product Substitutions Procedures) Section.
2.02PRODUCT SUBSTITUTIONS
A.Substitutions: No substitutions permitted.
2.03MANUFACTURED UNITS
Specifier Note: Edit paragraphs below. Select options applicable for project and delete options not required. (1) Typical glazing is acrylic and can be provided colorless, or in white, bronze, or grey colors. Single and double dome units are available. Double domes are recommended for energy conservation. Acrylic is the most common and economical material. Polycarbonate may be required for greater impact resistance or to meet some fire code requirements. Refer to the local building code for acceptable types and possible square foot area restrictions. Do not specify abrasion resistant acrylic or polycarbonate plastic glazing materials for use in domes in roof accessories. Sheet materials with abrasion resistant coatings should not be thermoformed for use in domes. (2) Finishes: Aluminum framing components are normally supplied in a natural mill finish. For more information and costs regarding architectural finishes, contact your nearest representative.
A.Curb-Mounted Skylights: Factory assembled units consisting of plastic dome, 0.062" extruded aluminum frame and 0.062" extruded aluminum dome retaining angle. Skylight frame shall have an integral condensate gutter with weep slots. Weep slots shall be protected from weather and air-borne debris. Curb frame shall be predrilled for anchorage to curbs.
1.Type: [Model NL single dome] [Model NLDD double dome] [Model PNL pyramid single dome] [Model PNLDD pyramid double dome] [Model NTL thermalized sealed double dome] [Model PNTL thermalized sealed pyramid double dome]
2.Glazing: Acrylic plastic glazing
3.Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray # 2064].
4.Inner Dome Color: [Colorless] [White # 2447].
5.Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to be [ ] as selected from manufacturers standard color offering]
6.Condensation Control: [Non-thermalized type shall have sufficient drainage slots to carry all moisture to the outside.] [Thermalized type shall have poured and de-bridged polyurethane thermal break; corners shall be factory sealed].
7.Size: [Insert outside curb dimensions here if not indicated on drawings].
8.Performance Minimums: Air Infiltration per ASTM E283 shall be < .01 CFM/ Cu. Ft. @ 6.25-psf negative pressure. Water Penetration per ASTM E331 shall pass at a negative pressure of 15-psf.
These units are designed for built up roof applications
B.Insulated Curb Skylights: Factory assembled self-flashing units consisting of plastic domes, 0.062" extruded aluminum curb frame, 0.062" extruded aluminum retaining angle, double wall insulated curb. Skylight frame shall have an integral condensate gutter with weep slots. Weep slots shall be protected from weather and air-borne debris. The curb shall have a 3" roof flange and house a 3/4" layer of insulation. Curbs shall be thermally broken.
1.Type: [Model NA single dome] [Model PNA pyramid single dome] [Model NADD double dome] [Model PNADD pyramid double dome] [Model NTLA thermalized sealed double dome] [Model PNTLA thermalized sealed pyramid double dome].
2.Curb Height: [9"] [12"].
3.Glazing: Acrylic plastic glazing.
4.Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray # 2064].
5.Inner Dome Color: [Colorless] [White # 2447].
6.Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to be [ ] as selected from manufacturers standard color offering]
7.Condensation Control: [Non-thermalized type shall have sufficient drainage slots to carry all moisture to the outside.] [Thermalized type shall have poured and de-bridged polyurethane thermal break; corners shall be factory sealed.]