FOUNDATION PLAN PREPARATION CHECK LIST

Project

Description:

Dist: County: Route: PM:

EA: Date:

Bridge Name and Number:

____ Properly formatted sheet

____ All signatures entered

____ Name of Structure

____ Bridge Number and Post Mile

____ District, County and route

____ Expenditure Authorization number

____ Site to be placed towards upper left corner of drawing

____ North Arrow placed in upper right corner

____ Control lines and name designations. Control line should be the darkest line on the drawing.

____ Stationing

____ Bearings

____ BC and EC stationing of curve with bearing of tangent or radial

____ Curve data on the inside of curve

____ Line intersection stationing

____ Topography

____ Name and direction of nearest cities

____ Names of streets and streams

____ Horizontal and vertical location of bridges to be widened

____ Utilities ( Type, Size and owner)

____ Type of roadway surface

____ Types of rails (MBGR etc.)

____ Pipe sizes and flow line elevations

____ Railroad crossing numbers

____ Hydraulic data near lower right corner

Magnitude, frequency, and pertinent water surface elevations for the following:

Design flood

Base flood

Overtopping flood

Flood of record if available

____ Water surface elevation and date

____ Show survey monuments if within the site

____ source and date of survey

____ Bench Marks: Two preferred with information in lower left corner

____ Datum : NGVD, District, etc.

____ Scale

____ Alignment ties

____ Drawing Number in lower right corner

1 of 1