Exhibit D to RFP-18060/ CSI Division Work Assignment Schedule

Complete the information requested below per the applicable CSI Division required for this Bid. Any portion of the form not filled in will be considered non-conforming and an irregularity, and may affect the award of this Bid. EXCEPTION: Any Division not applicable to this Bid may be left void or blank.

PROJECT: Additional Exterior Wayfinding Signage System DATE: December 12, 2017

ARCHITECT/ENGINEER: Tangram

CONTRACTOR NAME: ______

Do not combine categories of work; list separately per respective Construction Specification Institute (CSI) Division.

WORK DESCRIPTION CSI Division / PRIME, SUBCONTRACTOR, SUPPLIER
Name, City and State / **WORK LEVEL
SP or Tier 1 / % of BID VALUE / BID
AMOUNT / TRADES Performed by Division /
Div 01: General Requirements / $
Div 02: Existing Conditions / $
Div 03: Concrete / $
Div 04: Masonry / $
Div 05: Metals / $
Div 06: Wood, Plastics, Composites / $
Div 07: Thermal & Moisture Protection / $
Div 08: Openings / $
Div 09: Finishes / $
Div 10: Specialities / $
Div 11: Equipment / $
Div 12: Furnishings / $
Div 13: Special Construction / $
Div 21: Fire Suppression / $
Div 22: Plumbing / $
Div 23: HVAC / $
Div 25: Integrated Automation / $
Div 26: Electrical / $
Div 27: Communication / $
Div 28: Electronic Safety & Security / $
Div 31: Earthwork / $
Div 32: Exterior Improvements / $
Div 33: Utilities / $
Other – Please specify / $
Totals of: % of Bid Value and Bid Amount (% must add up to 100 and Bid must equal RFB-16045 Bid Value) / $

1.  Fill in information for each Division of work to be completed under this Bid, even if, the work is self-performed by the General Contractor.

2.  ** Work Level Descriptions: SP = Self performed by Prime/General Contractor; Tier 1: Subcontractor to Prime/GC;

Document #00-416