(For City and County of Honolulu/Federal Projects)
Title Page[h1]
TABLE OF CONTENTS
Notice To Bidders[h2]
Instructions for Contractor’s Licensing[h3]
Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity (Executive Order 11246[h4])
General Information Regarding
Disadvantaged Business Enterprises (DBEs[h5])
Regulatory Requirements for Federal Aid Projects Regarding
Disadvantage Business Enterprises (DBEs[h6])
Required Federal-Aid Contract Provisions[h7]
Special Provisions Title Page[h8]
Special Provisions:
DIVISION 100 – GENERAL PROVISIONSSection / Description / Pages
101 / Definitions And Terms / 101-1a – 10112a[h9]
102 / Bidding Requirements and Conditions / 102-1a – 102-8a[h10]
103 / Award And Execution of Contract / 103-1a – 103-4a[h11]
104 / Scope of Work / 104-1a – 104-8a[h12]
105 / Control of Work / 105-1a – 105-17a[h13]
106 / Control of Material / 106-1a – 106-8a[h14]
107 / Legal Relations and Responsibility To Public / 107-1a – 107-21a[h15]
108 / Prosecution And Progress[h16][h17] / 108-1a – 108-26a[h18]
109 / Measurement And Payment / 109-1a – 109-14a[h19]
DIVISION 200 EARTHWORK
Section / Description / Pages
201 / Clearing And Grubbing / 201-1a – 201-3a[h20]
202 / Removal Of Structures And Obstructions / 202-1a – 202-4a[h21]
203 / Excavation And Embankment / 203-1a – 203-15a[h22]
206A / Excavation And Backfill For Miscellaneous Facilities [h23] / 206A-1a – 206A-5a[h24]
206B / Excavation and Backfill for Bridge and Retaining Structures [h25] / 206B–1a – 206B-6a[h26]
206C / Excavati0on and Backfill for Drainage Facilities [h27] / 206C-1a – 206C-3a[h28]
207 / Ditch And Channel Excavation / 207-1a[h29]
208 / Leveling Surfaces / 208-1a [h30]
209 / Temporary Water Pollution, Dust, And Erosion Control / 209-1a – 209-9a[h31]
210 / Dressing Of Shoulders / 210-1a [h32]
DIVISION 300 – BASES
Section / Description / Pages
301 / Plant Mix Asphalt Concrete Base Course [h33] / 301-1a - 301-3a[h34]
301 / Plant Mix Asphalt Concrete Base Course [h35] / 301-1a - 301-3a[h36]
302 / Recycled Plant Mix Asphalt Concrete Base Course [h37] / 302-1a - 302-4a[h38]
304 / Aggregate Base Course [h39] / 304-1a - 304-3a[h40]
305 / Aggregate Subbase Course [h41] / 305-1a - 305-2a[h42]
306 / Untreated Permeable Base Course / 306-1a - 306-3a[h43]
310 / Brooming Off / 310-1a[h44]
311 / Asphalt Treated Permeable Base / 311-1a - 311-3a[h45]
312 / Plant Mix Glassphalt Concrete Base Course [h46] / 312-1a – 312-4a[h47]
313 / Controlled Low Strength Material (CLSM) For Utilities and Structures [h48] / 313-1a - 313-3a[h49]
313 / Controlled Low Strength Material (CLSM) For Utilities and Structures [h50] / 313-1a - 313-2a[h51]
313 / Controlled Low Strength Material (CLSM) For Utilities and Structures [h52] / 313-1a - 313-2a[h53]
DIVISION 400 – PAVEMENTS
Section / Description / Pages
401 / Asphalt Concrete Pavement / 401-1a – 401-22a[h54]
403 / Open-Graded Plant Mix Seal / 403-1a[h55]
404 / Slurry Seal / 404-1a[h56]
407 / Bituminous Tack Coat [h57] / 407-1a – 407-2a[h58]
411 / Portland Cement Concrete Pavement / 411-1a – 411-26a[h59]
412 / Paving Fabric / 412-1a – 412-3a[h60]
413 / Recycled Asphalt Concrete Pavement / 413-1a - 413-3a[h61]
420 / Prime Coat for Untreated Permeable Base Course / 420-1a - 420-2a[h62]
DIVISION 500 – STRUCTURES
Section / Description / Pages
501 / Steel Structures / 501-1a[h63]
502 / Timber Structures / 502-1a[h64]
503 / Concrete Structures [h65] / 503-1a [h66]
503 / Concrete Structures [h67] / 503-1a [h68]
504 / Prestressed Concrete Members / 504-1a[h69]
505 / Piling / 505-1a – 505-4a[h70]
507 / Railings / 507-1a[h71]
508 / Cement Rubble Masonry / 508-1a[h72]
511 / Drilled Shafts / 511-1a – 511-22a[h73]
513 / Concrete Masonry Unit / 513-1a - 513-4a[h74]
DIVISION 600 - INCIDENTAL CONSTRUCTION
Section / Description / Pages
601 / Structural Concrete / 601-1a – 601-14a[h75]
602 / Reinforcing Steel [h76] / 602-1a[h77]
602 / Reinforcing Steel [h78] / 602-1a - 602-2a[h79]
603 / Culverts and Storm Drains [h80] / 603-1a – 603-12a[h81]
604 / Manholes, Inlets And Catch Basins / 604-1a – 604-7a[h82]
605 / Underdrains / 605-1a - 605-2a[h83]
606 / Guardrail / 606-1a – 606-6a[h84]
607 / Fences / 607-1a – 607-4a[h85]
608A / Portland Cement Concrete Sidewalks / 608-1a - 608-3a[h86]
608B / Asphalt Cement Concrete Sidewalk / 608-1a – 608-2a[h87]
609A / Portland Cement Concrete Curb and Gutter / 609-1a – 609-4a[h88]
609B / Asphalt Concrete Curb and Gutter / 609-1a – 609-3a[h89]
610 / Reinforced Concrete Driveways / 610-1a[h90]
611 / Hand-Laid Riprap / 611-1a[h91]
612 / Grouted Rubble Paving / 612-1a[h92]
613 / Centerline and Reference Survey Monuments / 613-1a - 613-3a[h93]
614 / Standard Street Survey Monuments / 614-1a – 614-3a[h94]
616 / Sprinkler System / 616-1a – 616-12a[h95]
617 / Planting Soil / 617-1a[h96]
618 / Grassed Surface [h97] / 618-1a – 618-4a[h98]
619 / Planting and Transplanting [h99] / 619-1a - 619-9a[h100]
621A / Traffic Control Guide Signs [h101] / 621A-1a – 621A-7a[h102]
621B / Traffic Control Regulatory, Warning, and Miscellaneous Signs [h103] / 621B-1a – 621B-3a[h104]
621C / Markers [h105] / 621C-1a – 621C-2a[h106]
622 / Roadway Lighting System / 622-1a – 622-8a[h107]
623 / Traffic Signal System / 623-1a - 623-19a[h108]
624 / Water System / 624-1a[h109]
625 / Sewer System / 625-1a[h110]
628 / Shotcrete / 628-1a – 628-8a[h111]
629 / Pavement Markings / 629-1a –629-10a[h112]
635 / Microcomputer System / 635-1a - 635-5a[h113]
636 / Field Office and Project Site Laboratory Trailer [h114] / 636-1a – 636-6a[h115]
637 / Slotted Drains / 637-1a[h116]
638 / Cellular Phone / 638-1a – 638-2a[h117]
640 / Lined Drainage Ditch / 640-1a [h118]
641 / Hydro-Mulch Seeding [h119] / 641-1a – 641-4a[h120]
643 / Cast-In-Place Concrete Pipe / 643-1a [h121]
645 / Work Zone Traffic Control Devices / 645-1a - 645-17a[h122]
646 / Geocomposite Drain / 646-1a – 646-3a[h123]
647 / Fiber Optic Cable / 647-1a – 647-6a[h124]
648 / Field-Posted Drawings / 648-1a[h125]
650 / Curb Ramps / 650-1a - 650-2a[h126]
651 / Reconstruction Of Weakened Pavement Areas [h127] / 651-1a - 651-2a[h128]
652 / Cold Planing Of Existing Pavement / 652-1a – 652-3a[h129]
653 / Structural Plate Culvert Lining / 653-1a – 653-3a[h130]
654 / Restrainers / 654-1a - 654-3a[h131]
655 / Drilling Holes and Installing Dowel Reinforcing Bars / 655-1a - 655-2a[h132]
656 / Maintenance of Existing Landscape Areas / 656-1a – 656-2a[h133]
657 / Repairing of Existing Sprinkler System / 657-1a – 657-2a[h134]
658 / Landscape Maintenance / 658-1a – 658-7a[h135]
692 / Voluntary Partnering / 692-1a – 692-3a[h136]
693 / Terminal Impact Attenuator / 693-1 – 693-2a[h137]
697 / Project Vehicles / 697-1a - 697-3a[h138]
698 / Training Special Provisions [h139] / 698-1a - 698-4a[h140]
699 / Mobilization / 699-1a - 699-2a[h141]
DIVISION 700 – MATERIALS
Section / Description / Pages
702 / Bituminous Materials / 702-1a[h142]
703 / Aggregates [h143] / 703-1a - 703-8a[h144]
704 / Masonry Unit / 704-1a[h145]
705 / Waterproofing / 705 - 1a[h146]
706 / Concrete, Clay, and Plastic Pipe / 706-1a[h147]
709 / Reinforcing Steel, Wire Rope and Prestressing Steel / 709-1a[h148]
710 / Fence and Guardrail / 710-1a[h149]
712 / Miscellaneous
Epoxy-Resin System [h150] / 712.02-1a[h151]
Grout / 712.04-1a[h152]
Precast Concrete Units / 712.06-1a[h153]
Frames, Grates, Covers
And Ladder Rungs / 712.07-1a[h154]
Luminaires / 712.29-1a - 712.29-3a[h155]
Light Sources / 712.32-1a[h156]
Cables, Conductors and Wires / 712.34-1a - 712.34-2a [h157]
Controller Equipment [h158] / 712.37-1a - 712.37-4a [h159]
Controller Equipment [h160] / 712.37-1a - 712.37-4a [h161]
Traffic Signals and Appurtenances / 712.39-1a - 712.39-3a [h162]
Pavement Markers / 712.40-1a[h163]
Preformed Pavement Marking Tape / 712.53-1a[h164]
Reflective Thermoplastic Compound Pavement
Markings / 712.55-1a[h165]
Hot Applied Rubberized Sealant / 712.57-1a[h166]
Luminaire and Conductor Identification / 712.62-1a[h167]
Conflict Monitor Tester / 712.71-1a - 712.71-5a[h168]
713 / Structural Steel And Related Material / 713-1a- 713-3a[h169]
717 / Cullet And Cullet-Made Materials / 717-1a 717-2a[h170]
Requirement of Chapter 104, HRS
Wages and Hours of Employees on Public Works Law[h171]
Federal Wage Rates[h172]
Proposal Title Page [h173]
Proposal ………………………………………………………………………..P-1 – P-7 [h174][h175][h176]
Proposal Schedule …………………………………………………………….P-8 – P[h177][h178]-?
Supplement to Proposal Schedule…………………………………………..P-? - P[h179]- ?
Confirmation by DBE[h180]
Surety Bid Bond[h181]
Sample Forms [h182]
Contract [h183]
Performance Bond (Surety[h184])
Performance Bond[h185]
Labor and Material Payment Bond (Surety[h186])
Labor and Material Payment Bond[h187]
Disclosure of Lobbying Activities
Standard Form - LLL and LLL-A [h188]
Statement of Compliance
Form WH-348[h189]
Statement of Materials and Labor Used by Contractors on
Highway Construction Involving Federal Funds
Form FHWA-47[h190]
Prompt Payment Certification[h191]
Final Report of DBE Participation[h192]
DBE Participation Report
Chapter 104, HRS Compliance Certificate[h193]
Certificate of Compliance for Final Payment[h194]
END OF TABLE OF CONTENTS
(Project No.)
-1-11/02/09
[h1]1Efile (C&C02k date 10/06/06)
[h2]1Pages NB-1 – NB-3 efile (C&C04j dated 2/14/05)
[h3]1Page 1 efile (C&C06Ba dated 9/01/02)
[h4]1Page 1 efile (C&C07c dated 1/20/00)
[h5]1Pages 1 – 3 efile (C&C08Ab dated 5/07/04)
[h6]1Pages 1 – 5 efile (C&C08Bc dated 7/05/04)
[h7]1Pages 1 – 117 efile (C&C09h dated 1/20/00)
[h8]1efile (C&C10b dated 5/08/00)
[h9]1efile (C&C101m dated 5/28/05)
[h10]1efile (C&C102w dated 3/04/05)
[h11]1efile (C&C103j dated 3/04/05)
[h12]1efile (C&C104Ai dated 3/04/05)
[h13]1efile (C&C105h dated 1/23/06)
[h14]1efile (C&C106j dated 1/22/05)
[h15]1efile (C&C107h dated 8/27/05)
[h16]1(Check specialty items)
[h17]1(Check Liquidated damages and rental lane closures)
[h18]1efile (C&C108j dated 2/06/06)
[h19]1efile (C&C109j dated 3/31/05)
[h20]1efile (201g dated 11/02/04)
[h21]1efile (202j dated 11/02/04)
[h22]1efile (203l dated 11/02/04)
[h23]1Add 313
[h24]1efile (206Ao dated 11/02/04)
[h25]1Add 313
[h26]1efile (206Bo dated 11/03/04)
[h27]1Add 313
[h28]1efile (206Co dated 11/04/04)
[h29]1efile (207f dated 11/02/04)
[h30]1efile (208c dated 11/02/04)
[h31]1efile (209j dated 2/10/05)
[h32]1efile (210d dated 11/02/04)
[h33]1 (Insert 302 and 312) (Paid under 312)
[h34]1efile (301h dated 11/02/04)
[h35]1(No payment) (Do not insert 302 nor 312)
[h36]1efile (301h4 dated 11/03/04)
[h37]1(Paid under 312) (Insert 301 and 312
[h38]1efile (302h dated 11/02/04)
[h39]1Add 717
[h40]1efile (210d dated 11/02/04)
[h41]1Add 717
[h42]1efile (305g dated 11/02/04)
[h43]1efile (306f dated 11/02/04)
[h44]1efile (310f dated 11/02/04)
[h45]1efile (311f dated 11/02/04)
[h46]1Add 301 and 302
[h47]1efile (312j dated 11/02/04)
[h48]1Pay under 313
[h49]1efile (313e dated 11/02/04)
[h50]1Incidental to 206A, 206B, and 206C
[h51]1efile (313f dated 11/03/04)
[h52]1Pay under 206A, 206B, and 206C
[h53]1efile (313g dated 11/04/04)
[h54]1efile (401o dated 8/09/05)
[h55]1efile (403d dated 11/02/04)
[h56]1efile (404d dated 11/02/04)
[h57]1No payment
[h58]1efile (407e dated 11/02/04)
[h59]1efile (411h dated 8/22/05)
[h60]1efile (412a dated 11/02/04)
[h61]1efile (413c dated 11/02/04)
[h62]1efile (420f dated 11/02/04)
[h63]1efile (501f dated 11/02/04)
[h64]1efile (502a dated 11/02/04)
[h65]1Pay by cubic yard
[h66]1efile (503f dated 11/02/04)
[h67]1Pay by lump sum
[h68]1efile (503h dated 11/03/04)
[h69]1efile (504a dated 11/02/04)
[h70]1efile (505d dated 11/02/04)
[h71]1efile (507e dated 11/02/04)
[h72]1efile (508a dated 11/02/04)
[h73]1efile (511c dated 11/02/04)
[h74]1efile (513b dated 11/02/04)
[h75]1efile (601g dated 11/02/04)
[h76]1Incidental
[h77]1efile (602e dated 11/02/04)
[h78]1Pay by lump sum
[h79]1efile (602h dated 11/03/04)
[h80]1Add 313 unless otherwise specified by HWY-DH (i.e. Culvert cleaning)
[h81]1efile (603h dated 11/02/04)
[h82]1efile (604e dated 11/02/04)
[h83]1efile (605f dated 11/02/04)
[h84]1efile (606e dated 11/02/04)
[h85]1efile (607f dated 11/02/04)
[h86]1efile (608Ag dated 11/02/04)
[h87]1efile (608Bg dated 11/03/04)
[h88]1efile (609Af dated 11/02/04)
[h89]1efile (60Bf dated 11/03/04)
[h90]1efile (610c dated 11/02/04)
[h91]1efile (611c dated 11/02/04)
[h92]1efile (612c dated 11/02/04)
[h93]1efile (613h dated 11/02/04)
[h94]1efile (614h dated 11/02/04)
[h95]1efile (616h dated 1/10/05)
[h96]1efile (617e dated 11/02/04)
[h97]1Check planting and plant establishment period time if ok
[h98]1efile (618g dated 11/02/04)
[h99]1Check planting and plant establishment period time if ok
[h100]1efile (619f dated 11/02/04)
[h101]1Add 713
[h102]1efile (621Af dated 11/02/04)
[h103]1Add 713
[h104]1efile (621Bf dated 11/03/04)
[h105]1Add 713
[h106]1efile (621Cf dated 11/04/04)
[h107]1efile (622g dated 11/02/04)
[h108]1efile (623l dated 11/02/04)
[h109]1efile (624e dated 11/02/04)
[h110]1efile (625d dated 11/02/04)
[h111]1efile (628a dated 11/02/04)
[h112]1efile (629k dated 11/02/04)
[h113]1efile (C&C635d dated 2/09/04)
[h114]1Add to 699
[h115]1efile (C&C636d dated 2/23/03)
[h116]1efile (C&C637d dated 11/02/04)
[h117]1efile (C&C638e dated 2/09/04)
[h118]1efile (640g dated 11/02/04)
[h119]1Check planting and plant establishment period time if ok
[h120]1efile (641b dated 11/02/04)
[h121]1efile (643a dated 11/02/04)
[h122]1efile (645j dated 2/10/05)
[h123]1efile (646a dated 11/02/04)
[h124]1efile (647a dated 8/15/05)
[h125]1efile (648b dated 9/08/05)
[h126]1efile (650h dated 11/02/04)
[h127]1Backfill with 312
[h128]1efile (651e dated 11/02/04)
[h129]1efile (652f dated 11/02/04)
[h130]1efile (653d dated 11/02/04)
[h131]1efile (654e dated 11/02/04)
[h132]1efile (655b dated 11/02/04)
[h133]1efile (656a dated 11/02/04)
[h134]1efile (657a dated 11/02/04)
[h135]1efile (658a dated 11/02/04)
[h136]1efile (692b dated 11/02/04)
[h137]1efile (693c dated 11/02/04)
[h138]1efile (MC697c dated 2/12/03)
[h139]1Compute $0.80 x No. of Hours for amount in proposal schedule
[h140]1efile (698c dated 11/02/04)
[h141]1efile (MC699h dated 11/02/04)
[h142]1efile (702e dated 7/30/03)
[h143]1File for islands of Oahu and Maui
[h144]1efile (703n dated 4/18/06)
[h145]1efile (704c dated 3/01/02)
[h146]1efile (705a dated 6/19/03)
[h147]1efile (706c dated 10/18/98)
[h148]1efile (709b dated 10/18/98)
[h149]1efile 710c dated 4/06/99)
[h150]1For 655
[h151]1efile (712_02b dated 7/07/98)
[h152]1efile (712_04b dated 10/18/98)
[h153]1efile (712_06a dated 11/20/01)
[h154]1efile (712_04b dated 7/15/98)
[h155]1efile (712_29b dated 10/02/98)
[h156]1efile (712_32a dated 1/31/01)
[h157]1efile (712_34a dated 12/22/99)
[h158]1With master controller
[h159]1efile (712_37j dated 9/19/00)
[h160]1Witout master controller
[h161]1efile (712_39d dated 12/23/99)
[h162]1efile (712_34a dated 12/22/99)
[h163]1efile (712_40a dated 5/22/03)
[h164]1efile (712_53c dated 10/18/98)
[h165]1efile (712_55a dated 12/09/02)
[h166]1efile (712_57b dated 10/18/98)
[h167]1efile (712_62b dated 10/18/98)
[h168]1efile (712_71b dated 10/18/98)
[h169]1efile (713d dated 7/08/98)
[h170]1efile (717e dated 10/18/98)
[h171]1Pages 1 – 2 efile C&C16h dated 12/04)
[h172]1efile (fwr.pdf)
[h173]1efile (C&C17b dated 6/02/98)
[h174]1Page P-1 efile (C&C18Me dated 10/12/06)
[h175]1Pages P-2 – P-4 and P-7 efile (C&C18Me dated 1/22/04)
[h176]1Pages P-5 and P-6 efile (C&C18Me dated r5/07/04)
[h177]1efile (C&C18Sb dated 10/12/05)
[h178]1Last Page efile (C&C18Sd dated 1/04/06)
[h179]1efile (C&C18Tc dated 7/07/05)
[h180]1efile (C&C19Ac dated r4/15/02
[h181]1Page BB-1 efile (C&C40d dated r11/17/98)
[h182]1efile (C&C50j dated 3/07/05)
[h183]1Pages K-1 – K-3 (C&C60d)
[h184]1Page PBS-1 efile (C&C70d dated r11/17/98)
[h185]1Pages PB-1 – PB-2 efile (C&C71d dated r11/17/98)
[h186]1Page SLB-1 efile (C&C72d dated r11/17/98)
[h187]1Pages LB-1 – LB-2 efile (C&C73d dated r11/17/98)
[h188]1efile (C&C74a)
[h189]1efile (C&C75b dated 1/68)
[h190]1efile (C&C76b dated 6/90)
[h191]1efile (C&C77a dated 5/07/04)
[h192]1Pages 1 – 2 efile (C&C78c dated 5/07/04)
[h193]1efile (C&C79a dated 10/10/02)
[h194]1efile (C&C80a dated 11/03)