ECE 477 Digital Systems Senior Design Project Rev 10/09
Project Specific Success Criteria Check-Off Form
Team Code Name: AFCI Group Number: 12
Copy and paste your five current PSSCs into the table below and then print out the form. PSSC check-off will occur during a live demonstration for one of the course TAs. Preliminary PSSC check-offs can occur when: all of the electronics being used will be part of your final product (e.g. no evaluation boards in the loop), and the setup is self contained (e.g. all software must start automatically from power-up and no programmers may be attached). Final PSSC check-offs require in addition to the same two conditions as preliminary check-offs: that the project is packaged in its final enclosure, and that the power source being used is what will be in the final product (e.g. you may not use a bench power supply if your product is battery powered). PSSCs may be checked-off individually as functionality is achieved, but for maximum credit on final PSSCs you must be able to show that your design is in a form that is capable of satisfying all PSSCs without further changes. Preliminary check-off is enough to satisfy course outcome #3. However, preliminary vs. final check-offs are considered when determining the scores for PSSCR and SYSIN.
PSSC / Date Verified / Initials / Notes1 / An ability to receive and correctly record values from various sensors. / P
F
2 / An ability to give appropriate warnings and troubleshooting instructions if a sensor detects something wrong. / P
F
3 / An ability to store data on external memory. / P
F
4 / An ability to use a touch screen to send commands to the microcontroller to control the logging of data and to provide a user configurable display for the logging of data from multiple sensors. / P
F
5 / An ability for the microcontroller to receive and execute commands to remotely enable, disable and control the sampling rate of multiple sensors. / P
F