The VÖGELE PowerFeeder ensured optimum capacity utilization and top-notch paving results in a rehabilitation project on Austria’s A2 motorway.

Road construction work with moving traffic always represents a major challenge. This holds especially true when only one lane can be closed, consequently leaving little space for working and manœuvring. And this was exactly the case on the A2 motorway in Austria between Vienna and Graz near Schäffern. However, this project was further complicated by another factor: all access roads to the job site were roughly 1km apart.

Non-stop supply of mix

Ensuring an uninterrupted supply of mix to the paver under these adverse conditions required perfect job-site logistics and optimum material management. After all, the specifications for evenness were strict as the Austrian road construction guidelines and regulations only permitted minor deviations. The solution: a non-stop supply of mix with a material feeder. The consortium which was awarded the contract, “Arge A2 Zöbern-Pinggau” comprising construction firms Bauunternehmung Granit Gesellschaft m.b.H. and Swietelsky Baugesellschaft m.b.H., opted to use the VÖGELE PowerFeeder MT 3000-2 Offset with pivoting conveyor.

Material feeder ensures pavement quality

Paired with the SUPER 1900-2, the VÖGELE PowerFeeder demonstrated its high importance for the pavement quality. It received the mix from lorries and continuously transferred it to the paver without physical contact, while the lorries navigated the job site. Thanks to the feeder’s high capacity (together with the paver’s material hopper, it can accommodate the entire load of a 25t lorry), the feeder always carried enough mix to permit an uninterrupted flow of material to the paver, effectively preventing the formation of humps when resuming paving after a break.

Two layers of binder course

The paver operator and screed operator were able to concentrate fully on the asphalt paving work, while one lorry after another drove in reverse for up to 1km to dump mix into the feeder’s receiving hopper. Equipped with an AB 500 TV Extending Screed, the SUPER 1900-2 placed two layers of asphaltic concrete, 7 and 7.5cm thick, for the binder course. The first layer served for level regulation, which was necessary in this location. The second layer was followed by a 3.5cm surface course of stone mastic asphalt. The pave width varied from 4.75m to 6m.

Joystick control

His operating personnel found using the new MT 3000-2 Offset child’s play, reported Site Manager Harald Zippe from construction firm Granit: “Basically, the machine functions very similarly and just as intuitively as a VÖGELE paver thanks to the standardized ErgoPlus operating system. Our team also really liked the joystick for controlling the pivoting conveyor.” The operator uses the joystick not only to move the pivoting conveyor, but also to control the speed of the conveying process.

Quality and schedule totally under control

The verdict after completion of the work was absolutely unequivocal: “We achieved an outstanding degree of evenness thanks to the material feeder,” said Zippe. “We were easily able to meet the client’s strict quality requirements.” And one further advantage: personnel idle time was avoided, thus reducing the time needed for the actual paving work. The team was able to work continuously from 7 am until 4 pm. “That made it easier to comply with the tight schedule and likewise made a key contribution to the outstanding results,” added Zippe.

** End of Press Release **

Characters (including spaces): 3.585

Ludwigshafen am Rhein / February2013

Press contact and productinformation:Please send sample copy to:
Joseph Vögele AGPREWE
Roland Schug, Anja SehrMichael Endulat
Joseph-Vögele-Str. 1Goldberger Str. 12
67075 Ludwigshafen27580 Bremerhaven
GermanyGermany

Telephone:+49 (0) 621 / 81 05 - 3 92Telephone: +49 (0) 471 / 48 17 444
Fax: +49 (0) 621 / 81 05 - 4 69
E-Mail: E-Mail:
Internet:

Photos:

/ Voegele_02_1_14_8196.jpg
The MT 3000-2 Offset always carried enough mix to permit uninterrupted
paving.
/ Voegele_02_1_14_8290.jpg
Reliable, continuous, non-contacting: the mix intake from the lorry to the feeder and the transfer from the feeder to the paver permitted a constant supply of material, ensuring the optimum quality of the pavement.
/ Voegele_02_1_14_8278.jpg
“We were easily able to meet the client’s strict quality requirements.”Harald Zippe, Site ManagerBauunternehmung Granit Gesellschaft m.b.H.
/ Voegele_02_1_12_8297.jpg
Surface accuracy and time schedule totally under control: the paving team of Site Manager Harald Zippe (far right) and WIRTGEN Austria Sales Manager Ewald Schemitsch (front row, second from the right) were completely satisfied.