I have gone through the attachment provided by TSL and understood that the tier level tariff is applicable only for local inbound and outbound containers (seems to be there is a separate tariff for transshipment)

But still we are not clear about the rule for the calculation

Q1: Will this be keep on accumulating or should it be initialized at the beginning of each year or month

TSL reply: A1: Yes, accumulate

ID reply – This means there is no initialization and the teu count of the previous year will be carried forward to the next year and so on?

TSL reply: A1: No, the calculation is initialized by a new contractual year, old volume don’t be involved.

Q2: How to accumulate the TEU and apply the correct rate?

Example

Vessel / ETA / Type / Teus / Rate / Accumulated Teus / Remarks
V1/A / 01-Jan-2013 / 20GP / 20000 / 650 / 20000 / Belongs to first tier
V2/B / 10-Jan-2013 / 20GP / 40000 / 650 / 60000 / Belongs to first tier
V3/C / 15-Feb-2013 / 20GP / 20000 / 650 / 80000 / Even though the teus exceeded 70000, discounted rate will be applicable from next voyage only
V4/D / 25-Feb-2013 / 20GP / 10000 / 570 / 90000 / Second tier
V5/E / 10-Mar-2013 / 20GP / 20000 / 570 / 110000 / Even though the teus exceeded 100000, discounted rate will be applicable from the next voyage only
F / 20-Mar-2013 / 20GP / 10000 / 531 / 120000 / Third tier

Note: Please note that the teus are exaggerated to simplify the calculation

TSL Reply: A2: The transiting voyage still apply old tariff, the next voyage use the new tariff.

ID reply – Clear

SOP – SHEKOU Stevedoring Tariff and Calculation

1.  Port Tariff Setup

In order to define the tariff based tier on the throughput(Teus), port tariff has been modified to accept the tier wise rate as shown below.

User can define the rates based on the container size, Laden/Empty, Normal(local discharge/Load) and based on the cargo type.

2.  Configuration

In order to build the summary for Teus, the following configuration to be set whether to build the summary and stevedoring charges applicable based on throughput.

Also system has a facility to group the moves in order to build the summary, whether only local moves or transshipment movements also to be considered.

The above grouping of moves should be done in the Equipment control. System will build summary online based on the above setup and Vessel/Voyage/Port/ETA.

3.  Cost Calculation

During cost calculation, based on the above config system will decide whether to pick the rate based on the tier or the normal rate.

While processing the movements, system will check the movement summary based on the Vessel/Voyage/Port and accumulated teus in order to pick the tier rate as shown below.

Note : While updating in PD, summary for the old data to be uploaded in the system for which ID technical team will provide necessary help .