Section 02332
2006-10-31 Waste Fill Placement
Use this section to specify requirements for waste fill placement.
Edit this section to suit the Contract requirements.
Heading of Specification Text / Specification Note /Part 1 General
1.1 References
Part 2 Products
2.1 Materials
Part 3 Execution
3.1 Waste Fill Placement
.4 / Edit as required.
[.5] / Include if required and co-ordinate with Contract Time specified in Section 01110 – Summary of Work to provide sufficient time for thawing of frozen materials to occur.
.6 / Confirm lift thickness.
END OF COVER SHEET
CWMS Civil Works Master SpecificationAlberta Transportation
Master Specification System / Page 1
Section 02332
Waste Fill Placement
Tender No.: [ ] Page 1
PART 1 GENERAL
1.1 REFERENCES
.1 Provide Waste Fill placement in accordance with the following standards (latest revision) except where specified otherwise.
.2 American Society for Testing and Materials (ASTM)
.1 ASTM D698 Standard Test Methods for Moisture–Density Relations of Soils and Soil Aggregate Mixtures Using 5.5lb (2.49kg) Rammer and 12” (305mm) Drop.
PART 2 PRODUCTS
2.1 MATERIALS
.1 Waste Fill: Refer to Section02330 – Earthwork Materials for material specifications.
PART 3 EXECUTION
3.1 WASTE FILL PLACEMENT
.1 Perform stripping as specified in Section 02234 – Topsoil and Subsoil Stripping.
.2 Remove debris, snow, ice, and excess water prior to starting Waste Fill placement.
.3 Receiving surfaces for Waste Fill may be frozen.
.4 Place Waste Fill in [waste disposal area nos. ] [Waste Fill zones on the outside of the new canal banks] [borrow areas nos. ] specified in the Contract Documents [or other areas designated by the Minister].
[.5] Waste Fill may include frozen material; however, temporarily stockpile large frozen particles that cannot be broken and placed to the specified loose lift thickness, and compacted as specified. Allow stockpiled frozen material to thaw prior to placing and compacting in its final location.
.6 Spread the Waste Fill using a maximum loose lift thickness of [500 mm] in order to eliminate large voids.
.7 Compact each lift of Waste Fill to a minimum of 85% of the Standard Proctor Maximum Dry Density as determined by ASTM D698.
.8 Place Waste Fill at the locations, and to the lines, grades, slopes, and elevations specified in the Contract Documents or as directed by the Minister. Provide finished side slopes that are 3H:1V or flatter.
.9 Regrade Waste Fill areas, after the previously placed Waste Fill materials have subsided, to provide a neat, uniform, and free draining surface.