Environment Management Plan for Huaneng Central Heating Project Loaned from World Bank in Northern Yingkou City
Design Unit:Yingkou Thermal Heating Company.
LiaoningAcademy of Environmental Sciences
July 2007
catalog
1 PROJECT DESCRIPTION
1.1 BACKGROUND OF THE PROJECT
1.2 NAME, FEATURES AND CONSTRUCTION SITE OF THE PROJECT
1.3 CONTENTS OF CONSTRUCTION
2 DESIGN BASIS
2.1 PERFORMANCE CRITERIA
2.2DESIGN BASIS
3.STATUS QUO OF ENVIRONMENT QUALITY AND POLLUTANT PRODUCED BY THE PROJECT
3.1 STATUS QUO OF ENVIRONMENT QUALITY
3.2POLLUTANT PRODUCED BY THE PROJECT
3.3SITUATION OF SUBSTITUTE POLLUTION SOURCE
4 ENVIRONMENT IMPACT MITIGATION MEASURES
5.ORGANIZATION ARRANGEMENT
6. MONITORING PLAN
7.REPORTING SYSTEM
7.1 MONITORING REPORT
7.1.1CATEGORY AND CONTENT OF MONITORING REPORT
7.1.2 SUBMITTING TIME AND MONITORING REPORT ACCEPTER
7.1.3 FEEDBACK REQUIREMENT OF MONITORING REPORT
7.2 RECORDS AND EMP IMPLEMENTATION REPORT
7.2.1 RECORD SYSTEM
7.2.2EMP IMPLEMENTATION REPORTS
8TRAINING PLAN
9 PUBLIC PARTICIPATION PLAN
9.1 PUBLIC PARTICIPATION BEFORE THE IMPLEMENT OF THE PROJECT
9.2CONTINUOUS PUBLIC PARTICIPATION PLAN
9.3 CHANNELS FOR COMPLAINS OF DISSENSION
10IMPLEMENTATION COST
1
1 Project Description
1.1 Background of the Project
To accelerate the development in Liaoning coastal economic belt, Liaoning Provincial Government has proposed the development strategy of “Five Points and One Line” to realize the “First Prosperity in Coastal Region”, regarding the industrial base along the coast of Yingkou city as its key development zone in its strategy of “Five Points and One Line”. In this case, new buildings will emerge in swarms shortly, which urgently needs a large-scale heat source; otherwise, the development zone will see a chaotic scenario that small boilers and high stacks are erected here and there. Besides, the rate of central heating for Yingkou existing buildings is 54.2%( boiler rooms of above 14MW), of which, the small thermal power plants and hot water boilers of below 29MW should be eliminated according to China new energy policy. Therefore, a large heat and power plant is urgently needed to build so as to solve the problem of central heating of Yingkou city.
In addition, the current coal-based energy consumption will continue to exist for quite a long time, and no radical changes will take place. The coal-fired energy accounts for2/3 of the total consumption of Yingkou city. Coal- burning smoke is the primary source of atmosphericpollution, especially in winter. Thus, a large thermal power plant equipped with updated technique and complete environmental protection facilities, would play a positive role in improving city air quality and citizens’ living quality.
To satisfy the thermal power demand of Yingkou, two heating supply units of 2×350MW, each capable of supplying a basic heating load of 325MW are planned to build in the south of coastal industrial bases of Yingkou city. One unit will be used to satisfy the heating demand of some coastal bases and the piping network entrusted by the Administration Committee of Development Zone is being laid; another unit of 1×58MW+4×29MW equipped with hot water boilers would be built for heating supply to an area up to 9.6 million m2 north of the city proper. A loan application from the World Bank has been submitted for the fund of heat supply network responsible for heating supply to the north of Yingkou city proper. This environmental management plan is prepared for the heating networksystem.
1.2 Name, Features and Construction Site of the Project
Name of the project:Huaneng Central Heating Project Loaded from World Bank inNorthernYingkouCity
Construction site: Northern part of YingkouCity, See figure 1.
Investment & Construction time: ¥457,950,000, 229, 777,000loaded from World Bank, and the rest from self-financing
Preparation stage of the project is till 2008, construction duration of the project is form 2009to 2010, local heating will be commenced in 2010 and general heating will be realized in 2013.
1.3 Contents of Construction
The contents of construction in the project are shown in table 1-1.
Table 1-1 composition and scale of the project
No / Contents of the project / Property / Scale / Remarks1 / The first-level pipeline network from 1m outside the fence wall of Thermal Power Plant to each heat exchange station / Newly built / 98.2km / Total heat supply area 9,596,200m2
2 / Construction of 83 heat exchange stations / Use the original heat exchange station / 40Entries / Standard configuration is two circulating pumps (1 in operation and the other in spare) and two refilling pump (1 in operation and the other in spare)
Raise facilities capacitance of the original heat exchange station / 20Entries
Newly built / 3Entries
Rebuild boiler house / 20Entries
3 / Control center of heat network / Newly built / 1 / -
4 / Booster pump station / Newly built / 1 / -
2Design basis
2.1Performance criteria
2.1.1Environmental quality standard
(1)Ambient Air Quality Standard
The normal pollutants of environmentalair quality shallapplyNational Ambient Air Quality Standard Grade Ⅱ(GB3095-1996). See table2-1 for the details.
Table 2-1 Ambient air quality standard
Standard / Item / Concentration limits of pollutants(mg/m3)Hourly average / Daily average / Yearly average
GB3095-1996 / SO2 / 0.50 / 0.15 / 0.06
PM10 / - / 0.15 / 0.10
NO2 / 0.24 / 0.12 / 0.08
(2)Acoustical Environment Standard
Various heating exchange station situated indifferent functionaldistrict.Accordingly, they will comply to different grade of Standard for Urban Regional Environment Noise (GB3096-93)Grade Ⅰ,that is:55 dB in the daytime, 45dB at night and Grade Ⅱ,60 dB in the daytime and 50dB at night.
2.1.2 Emission Standard for Pollutants
(1)Waste Water
The waste water should discharge into the municipal network and adoptDischarge standard for municipal wastewater(CJ3082-1999)
Table2-2 Discharge standard for municipal wastewater
CODcr / BOD5 / SS500 / 300 / 400
(2)Noise
The noise during construction implements The standard of noise limits of construction site (GB12523-90), see table 2-3for details.
Table 2-3 Noise limits for construction site dB(A)
Construction stage / Main noise source / Noise limitsDaytime / Nighttime
Earthwork / Bulldozer, Excavator, Loader etc. / 75 / 55
Heat exchange station should perform Standard of Environmental Noise of Urban city Grade Ⅰ,Ⅲ(GB3096-93)respectively according to the location of the different functional zones.
(3)Solid Waste
Solid waste should Perform Standard for Pollution Control on the Industrial Solid Wastes in LiaoningProvince (DB21-777-94)and Standard for Pollution Control on the Storage and Disposal Site for General Solid Wastes (GB18599-2001)
2.2Design Basis
This Environmental Management Plan is designed according to the laws and regulations of environmental protection in People’s Republic of China; World Bank Safeguard Operation Policy; related environment protection rules and structured documents in Iiaoning province, Yingkou City; the design documents of this project; technical documents on the construction project’s environmental impact assessment of PRC Environmental Protection Agency and international environment protocols that signed by China; etc.
3.Status Quo of Environment Quality and Pollutant produced by the project
3.1 Status Quo of Environment Quality
(1) Ambient Air Quality
According to The Report on Environmental Quality of Yingkou city 2006, the average value of PM10 concentration of the air in Yingkou city is 0.13mg/m3 and the average value of SO2concentration is 0.04mg/m3 which meet the requirement of state air quality GradeⅡ; the average value of NO2 concentration is 0.04mg/m3 which has met the requirement of state air quality GradeⅡ.See table3-1.
Tab.3-1 Ambient Air Quality mg/m3
Source of data / TSP / SO2 / NO2daily
concentration / standard / daily
concentration / standard / daily
concentration / standard
The Report on Environmental Quality of Yingkou city 2006 / 0.13 / 0.30 / 0.04 / 0.15 / 0.04 / 0.12
(2) Acoustical Environment Quality
The sensitive points around the heat exchange station meet Standard of environmental noise of urban area.(GB3096-93) GradeⅠ, Ⅲ.
3.2Pollutant produced by the project
(1)Waste water
After the implementation of the project, waste water produced by the repair personnel of the heat network and the duty crew of the heat exchange station should be discharged into the municipal pipeline network.
Table 3-1 The domestic waste water during operation stage
Sewage source / Quantity of waste water(t/a) / Name of pollutant / Effluent concentration(mg/L) / Standard / Discharge quantity
(t/a) / Discharge situation
Working staff / 6290 / CODCr / 240 / 500 / 1.51 / Into municipal pipeline network
SS / 180 / 400 / 1.13
The discharge of the waste water meet the requirement of Discharge standard for municipal wastewater(CJ3082-1999).
(2)Solid waste
The domestic waste produced by 425 wording staff will be up to60t/aand collected by the sanitary department and treated in the landfill.
3.3Situation of substitute pollutionsource
After implementation, the project will substitute 30 scattered boiler rooms within the heat supplying area of 288ten thousand m2.The annual discharge quantity of each pollutant in all of the boiler rooms: TSP2343.0t, SO2956.8t.
After the implementation of this project, all of these small boiler room will be shut down, and all the low chimneys will be eliminated, which would improve the environmental air quality of Yingkou F city greatly.
Tab.3-2 The annual discharge quantity of each pollutant in boiler rooms
heating area / TSP Emissions / SO2 Emissionsten thousand m2 / t/a / t/a
Current / 288.6 / 2343.0 / 956.8
After Project Completion / 959.62 / 523 / 320
Variable / +671.02 / 1820 / 636.8
4 Environment Impact Mitigation Measures
According to environment impact assessment documents, considering the project features and based on pollution discharge process of project construction phase and operation phase, the environment impact mitigation plans for different phase are given as table 4-1~table 4-2.
1
Table 4-1 Environment Impact Mitigation Measures List for Heating Pipelines
Phase / Problem / Environmental Impact / Mitigation Measures / MitigationCost(High or not) / Undertaker / Starting Date / Completing Date
Construction Phase / Noise / The main machine in the construction period includesloading vehicles, road rollers, load-carrying vehicles, etc. noise of main construction mechanical equipments is about 80dB(A). Noise of construction will impact much on resident area or schools around heat exchange stations, and the first row of building on the road next to the site. / 1.Arrange reasonable construction time from 7:00 am-6:00 pm, night construction is forbidden.
2. The noise of workingequipment must meet the require of Noise Limits for Construction Site(GB12523-90) which should be included in the bid documents.
3.Track and monitor. / Lower / Contractor / 2008.5 / 2009.10
TSP / TSP is the main problem of air pollution during the installation of pipeline. The TSP is mainly from digging and piling earthwork, transporting materials, removing road surface, backfilling earthwork. In addition, some fuel waste gas will be produced from construction machines, which are mainly CO and NO2. / 1.Establish watering system for dustsuppression. Regular daily watering can prevent floating dust. Increase watering times and amount in case of dry and gale weather.
2.Area for building materials storage shall be around with enclosed fence with height no lower than the stack of building materials.
3.Each inlet and outlet of building site shall be provided with equipment to remove dirt from wheel so that vehicles will not take dirt beyond the building site.
4.Bulk materials shall be transported in tank caror under felt cloth.
5.Temporary storehouse for bulk materials shall be built within building site, or with materials under dustproof gridding. Bulk materials exposed to open air are forbidden.
6.Remove building waste in time. Incineration waste is not allowed within building site.
7.Set up fence around building site to lessen the diffusion extent of floating dust. / Lower / Contractor
Traffic Interruption / The pipeline construction damages the roads and blocks traffic;
Piles and excavation on road block traffic;
Vehicles for transporting will increase. / 1.Block out the construction without using traveling crane path in case pipelines are dug at sidewalk.
2. Shorten construction time limit to 4 days in case construction goes through road.
3. Bulletin board shall be erected on theconstruction site, saying the project contents, construction term and the words “Please understand the inconveniences incurred from the construction”. In addition, there should be contact person and contact manner displayed on the board.
4. Settemporarybridge and baffle to insure safety of goer nearby school and hospital. / Lower / Contractor
Passage Construction/Usage / If new passage be construct, noise and TSP during construction will have impact on neighbouringresident. / Use the roads in existence without building extra transporting passage. / Lower / Contractor
Vegetation Damage / Vegetation in both sides of the road will be damaged in certain degree during the process of construction. / Vegetation quantity and category shall be recovered conforming to original one. / Low / Yingkou Thermal Heating Company
Cultural Heritage / Cultural Heritage will be likely tobe damaged during construction. / 1. Stop construction and inform relevant department in case any culturalproperties are found during construction. The site of cultural worth shall be properly preserved without any artificial articles to be removed.
2. Wait for identification and treatment by culturalworth institutions.
3. Go toculturalworth institutions for resuming work when the cultural worth are dealt with.
4. After getting the permission from cultural institutions, proceed with construction following the advice of experts on cultural worth.
5.Above-mentioned will be included in contractor bid document. / Lower / Contractor
Non-dangerousWaste Removal
(Rock and etc.) / Waste in the construction process such as packing bags, leftover bits and pieces of constructional material will make blight on the environment. / Building waste shall be removed to coastalindustrialbase for the Land Leveling and blocking up of newly-builtfactory. / Lower / Contractor
Insulation pipe / The vesicantexist in insulation pipe can be the substance which destroyozonosphere. / Bids shall indicate that the applied pre-insulation pipe does not contain any foaming agent falling short of the commitment by China in Montreal Agreement. /
Lower
/ Yingkou Thermal Heating CompanyLiving Waste / If no effective measure be take, the domestic waste in constructors’ resident place can contaminated the environment. / Living waste shall be sent to Yingkou rubbish landfill Site which lying in the 5 kmnorthwest of Yingkou center. / Lower / Contractor
Waste water / The domestic waste drainage produced by constructor workforces is the main wastewater source in the construction period. If the domestic wastewater is drained directly, water environment in all the regions will be impacted. / Waste water, consisting ma Bilder’s sanitary sewage shall be discharged to sewage treatment plant at last. / Lower / Contractor
Pipeline traversing
river / Pipeline of this project will traversing Minxing.River which will make blight on the water quality and aquicolousbiology. / To lessen the effects on rivers, we are to start construction in winter. Besides, to reduce the effects on river sediments, we will do our utmost to minimize riverway digging area, depth and width, not exceeding 5 meters in digging width, or 4 meters in depth. To shorten the construction period in riverway, we will conduct construction in a segmental way, that is segmental construction, segmental consolidating, and segmental backfilling. In addition, all hot-water pipelines shall apply polyurethane composite insulation pipes, containing pollution-free components against the water body. / Lower / Contractor
Tab.4-2 Environment Impact Mitigation Measures List for Heat Exchange St
Phase / Problem / Environmental Impact / Mitigation Measures / Mitigation Cost / Undertaker / Starting Date / Completing DateConstruction Phase of New Heat Exchange Station / Noise / The main machine in the construction period includesloading vehicles, road rollers, load-carrying vehicles, etc. noise of main construction mechanical equipments is about 80dB(A). The noise of construction will impact much on resident area or schools around heat exchange stations. / 1.Arrange reasonable construction time from 7:00 am-6:00 pm, night construction is forbidden.
2.Choose equipment with low noise. The construction of the substructure only use hydraulic pressure peg , dig hole peg and basic load peg. All of workingequipment ought to be the center of field.
3. The noise of workingequipment must meet the require of Noise Limits for Construction Site(GB12523-90) which ought be include in the bid documents.
4.Track and monitor. / Lower / Contractor / 2008.8 / 2009.4
TSP / TSP is the main problem of air pollution duringconstruction which will impact much on resident area or schools around heat exchange stations. / 1.Establish watering system for dustsuppression. Regular daily watering can prevent floating dust. Increase watering times and amount in case of dry and gale weather.
2.Area for building materials storage shall be around with enclosed fence with height no lower than the stack of building materials.
3.Each inlet and outlet of building site shall be provided with equipment to remove dirt from wheel so that vehicles will not take dirt beyond the building site.
4.Bulk materials shall be transported in tank car or under felt cloth.
5.Temporary storehouse for bulk materials shall be built within building site, or with materials under dustproof gridding. Bulk materials exposed to open air are forbidden.
6.Remove building waste in time. Incineration waste is not allowed within building site.
7.Set up fence around building site to lessen the diffusion extent of floating dust. / Lower / Contractor
Land Leveling/ Change Runoff Pattern / Land Leveling can change runoff pattern. / Dig ditches around project location to contain runoff as well as channel off. / Lower / Contractor
Passage Construction/
Usage / If new passage be to construct, noise and TSP during construction will have impact on neighbouringresident. / Use the roads in existence without building extra transporting passage. / Lower / Contractor
Cultural Heritage / Cultural Heritage will be likely tobe damaged during construction. / 1. Stop construction and inform relevant departments in case any culturalproperties are found during construction. The site of cultural worth shall be properly preserved without any artificial articles to be removed.
2. Wait for identification and treatment by culturalworth institutions.
3. Go tocultural institutions for resuming work when the cultural worth are dealt with.
4. After getting the permission from cultural worth institutions, proceed with construction following the advice of experts on cultural worth.
5.Above-mentioned will be included in contractor bid document. / Lower / Contractor
Living Waste / If no effective measure be take, the domestic waste in constructors’ resident place can contaminated the environment. / Living waste shall be sent to Yingkou rubbish landfill Site which lying in the 5 kmnorthwest of Yingkou center. / Lower / Contractor
Waste water / The domestic waste drainage produced by constructor workforces is the main wastewater source in the construction period. If the domestic wastewater is drained directly, water environment in all the regions will be impacted. / Waste water, consisting mainly of builder’s sanitary sewage shall be discharged to sewage treatment plant at last. / Lower / Contractor
Construction Phase of Rebuilt Heat Exchange Station / Non-dangerous Waste Removal
(Brick, Concrete, Metallic Scrap) / Constructional waste in the construction process such as packing bags, leftover bits and pieces of constructional material will make blight on the environment. / The building waste should be collected in time and transported to coastalindustrialbase for the Land Leveling and blocking up of newly-builtfactory. / Lower / Contractor / 2008.8 / 2009.4
Domestic waste water produced by the working crew / If no effective measure be take, the domestic waste in constructors’ resident place can contaminated the environment. / Dangerous Waste shall be removed to dangerous waste landfill site which have qualification. / Lower / Contractor / 2008.8 / 2009.4
Domestic waste water produced by the working crew / The domestic waste drainage produced by constructor workforces is the main wastewater source in the construction period. If the domestic wastewater is drained directly, water environment in all the regions will be impacted. / worker’s sanitary sewage shall be discharged to sewage treatment plant at last. / Lower / Contractor / 2008.8 / 2009.4
Operation Phase of Heat Exchange Station / Noise / The noise, given out in operation period of the heat exchange station, will have an impact on the environmental sensitive spots around it within a certain extent. / 1.Use imported water pump with high quality and low noise and the sound of one pump can notexceed 80 dB(A).
2.Provide good base to vibration absorption and install absorber to lighten vibration sound; inlet/outlet of water pump shall be connected with rubber tube. Add a concrete base to the bottom of water pump and add vibration isolator between base and floor, wall to eliminate the impact caused by structural low frequency sound to outside.
3.Build soundproof cover in case noise still cannot meet standard after taking above measures. / Lower / Yingkou Thermal Heating Company
Domestic waste produced by the working crew / There will be 60t/a domestic rubbish produced by 425 workers. / Living waste shall be sent to Yingkou rubbish landfill Site which lying in the 5 kmnorthwest of Yingkou center.
Domestic waste water produced by the working crew / Domestic sewage, made by maintainers of the heating network and the working personnel of the heating exchange station, will have an impact on water environment if they are drained freely. / Worker’s sanitary sewage shall be discharged to sewage treatment plant at last.
1