HIGHLIGHTS OF QUALIFICATIONS
Successful Team leader.
Multiple Grassroots petrochemical plant commissioning and start-ups.
33 years’ experience, 23 years Pre-commissioning, Commissioning, Management.
Experienced Commissioning Manager, Completions Manager, Technical Lead.
Qualified as Port Authority with Commissioning of ship and loading facilities.
Canadian SAIT Power Engineer.
Development and implementation of Standard Operating Procedures.
Excellent computer skills (Hardware and Software).
Excellent communication skills.
A demonstrated interest and knowledge in all aspects of large process operations.
As a process expert for major companies, I have experience in a great variety of processes including:
Stamicarbon Urea unit / MW Kellogg Ammonia Units / UHDE Urea Unit UFTLinde/UHDE Ammonia Unit / Claus Sulphur Recovery unit / UOP Isomerization unit
FPSO/Wellhead platform / CD-Tech MTBE unit / UOP Dehydrogenation unit
Linear Alpha Olefins Unit / NGL fractionation unit / MEA Contact and Regenerators
Condensate Stabilization Units / Gasification Unit / Olestra Unit
LNG Units / Fluidized Coker Unit / Ester Unit
Upgrader Units / Diluent Recovery System / Hot Oil Systems
GE Frame 7 Gas Turbines / Steam/Gas Power Generation / Utilities-Power generation, Instrument/ Plant air, Water treatment,
SPECIAL SKILLS AND TRAINING
High angle rescue certificate / Confined space entry certificateH2S rescue certificate / Dangerous good handling and transportation certificate
Advanced first aid certificate / Quality management certificate ISO 9002
Cardiovascular pulmonary resuscitation / Workplace hazardous materials information system WHIMIS
Bosiet Course / Coxswain Course
I have enjoyed a successful career in production facilities in Canada, USA, Saudi Arabia, Qatar, Algeria, Trinidad, Malaysia, Australia, Iraq and New Zealand.
I have extensive experience in Senior Management Roles directing large multidiscipline teams through Construction, Pre-commissioning, Completions Turnover and Commissioning on many large scale Multi-Billion Dollar projects.
My last project as the Expert Witness for Weatherford on the Zubair IPF Projects, I was supporting Weatherford Construction, Commissioning and Legal Teams on three sites in Southern Iraq Zubair oil Fields.
I am currently seeking a new challenging project in the oil, gas, Power and mining industries and am ready to continue the development of my career with fresh challenges in a new environment. Therefore, I am interested in teaming-up with your firm in accomplishing an effective search for an upper-level management position. As a well-seasoned start-up project consultant, I would be an excellent candidate for many senior positions in the EPC/Mining/Petroleum/Petrochemical industry. I certainly would be pleased to meet with your HR representative to conduct an appraisal interview. As you can see, I am not adverse to travel or relocation. Thank you for your consideration. I look forward to hearing from you.
WORK EXPERIENCE
Mar 2015 Commissioning Expert Advisor/Expert Witness
Dec 2015 Weatherford Middle East, Dubai, UAE, Zubair IPF Units Basrah, Iraq
Hired as Expert Witness to review and advise Weatherford’s Completions and Commissioning Teams and Legal Team on 3 IPF Units being built for client at the Zubair Oil fields in Southern Iraq. Observe the Client and report back to Weatherford’s Legal Team on possible arbitration opportunities and defense with Client. CMS ORBIT
Oct 2014 Bid Specialist for Annex Enterprises on multiple project Bid proposals
Feb 2015 Annex Enterprises LTD Medicine Hat, Alberta, Canada
Hired as a Consultant to directed development of Bid Proposals for various projects for Annex’s business development team in a Mentoring Capacity. Mentoring and managing the bid management team in the formulation of proposals and effective handover of successful contracts to operations for execution. Developed and build relationships with existing and new customers.
June 2014 Commissioning Manager FFT Project KBR Canada
Sept 2014 Syncrude Canada, Fort McMurray Alberta, Canada
Commissioning Manager for KBR for OSBL of the FFT project located on Syncrude’s Fort McMurray Alberta site. I was responsible for Project Pre-commissioning, Commissioning and Start-up direction to the KBR Commissioning disciplines for OSBL as directed by QEDI.
Feb 2012 Completions Turnover Manager MLMR Project Fluor Canada
Feb 2014 Syncrude Canada, Fort McMurray Alberta, Canada
Completions Turnover Manager for Fluor on the MLMR Project located on Syncrude’s Fort McMurray Alberta site. I was responsible for Project Deliverables of Attachment F and the Systems Completions Plan. Liaison with IORVL and ISCT teams for Project execution planning. Lead the Systems Completions Team to ensure development of Mechanical Completion Dossiers. Provide project progress status for system/subsystems completion. Development of “Orbit” CMS , Issue Mechanical Completion Certificates (MCC), Transfers of Care, Custody, and Control (TCCC).
Aug 2011 Gate Four Review Team Eng Suncor Energy
Feb 2012 TRO Project
TRO Project Suncor Fort McMurray, CSU Gate Four Review team member for prestart-up startup activities. Interface with Suncor’s TRO Commissioning Startup Team (CSU) and the Major Projects Group (MPG) to ensure completion of outstanding Gate 3 items and to drive the CSU Gate Four Review. Assist the CSU Manager with preparation of pre-commissioning and startup activities.
Oct 2010 Pre-Commissioning Project Manager Fire Bag 3 Suncor SAGD
Jun 2011 Fire Bag 3 Project added 68,000 barrels per day to Suncor`s excising oil production of SAGD produced oil. As the Project Manager for Four Quest Energy, I was responsible for the pre-commissioning activities of the Fire Bag 3 project as directed by Suncor for the Fire Bag 3 Project.
Nov 2009 COMMISSIONING MANAGER CSU/RFO MOSAIC POTASH/PHOSPHATE
Jul 2010 EXPANSION STAGE, Belle Plaine, Saskatchewan, Canada,
Mosaic Belle Plaine expansion is part of a five million tonne production increase over the next 12 years. As the Commissioning Manager CSU/RFO, I was responsible for the turnover, Commissioning and Start-up of the Stage 1 Expansion. Units consist of New Boiler and its Utilities, Saltwater Disposal units 3 and 4, Cavity pump injection, 7,000 gpm make up water expansion and heating systems.
Dec 2008 START-UP MANAGER MAARI OIL FIELD/TIRO TIRO MOANA &
Oct 2009 RAROA FPSO New Zealand, TPOT, Tanker Pacific, Singapore
Maari oil field based 80 km offshore in South Taranaki, New Zealand.
As the Start-up Manager for TPOT based out of Singapore and New Plymouth, New Zealand, I was directly responsible for the Commissioning and Start-up of the Wellhead Platform, Raroa FPSO and Tiro Tiro Moana production field. The production consisted of 5 oil wells and 3 seawater reinjection wells.
Jun 2006 CSU/RFO TECHNICAL LEAD- /PSSR/MOC/RFI/Lessons Learned Facilitator
Dec 2008 OPTI Long Lake Project, Fort McMurray Alberta, Canada
70,000 bbl/d New Standalone Oil Sands Upgrader unit OPTI Nexen joint venture SAGD unit.
As the Technical Lead for Engineering, I audited and advised on the turnover and start-up of the Upgrader. I facilitated the PSSR, MOC, RFI and Lessons Learned processes. Units include Orcrude, Gasification, Hydrocracker, Sulphur Recovery, and ASU.
Oct 2004 CSU/RFO TURNOVER MANAGER
May 2006 Syncrude UE-1 Project, Fort McMurray Alberta, Canada
UE-1 Project has added 40 million-bbl/year feed to existing facilities and Increase production to 135 million bbl/year of enhanced Syncrude Sweet Blend. As the Turnover Coordinator for the new Diluent Recovery Unit and the Coker Unit on the UE-1 Project, I was responsible for setting up the system of Project Turnover. I was responsible for the process of the QA team to ensure UE-1 spec conformances. Punch listing of deficiencies and the process of validation. I was responsible for the process of “Near Operating Readiness”, “Care Custody and Control”, and “Mechanical Completion”. Oversee the “Ready For Operations Group” (RFO) as Key Point for Systems Turnover to Start-up of Syncrude’s UE-1 Project.
Nov 2003 COMMISSIONING MANAGER
Jul 2004 Kellogg Brown and Root, TEG/REG Insalah Project JK, Insalah Algeria
Overseen the Insalah Gas Project Pre-commissioning, Start-up and Project Turnover of the TEG and REG projects located about 100km apart in Southern Algeria. Units consisted of Dehydration Units, Gas reinjection trains and product booster trains including overseeing operation and maintenance of units for six months. I was responsible for the production, maintenance and demobilization including camps for Venders and Military.
Dec 2002 PLANT COMMISSIONING JV SUPERINTENDENT LNG
Nov 2003 Kellogg Brown and Root, MLNG TIGA JV, Bintulu, Sarawak, Malaysia
Assisting in overseeing the Pre-commissioning planning and execution through to start-up of LNG trains 7 and 8. Responsible for construction daily permits during Greenfield and Brown field phases of the project. MLNG TIGA with a capacity of 3.8 million metric tons per train per year. The Malaysian complex was the largest LNG facility in the world.
Aug 2002 SENIOR PROCESS COMMISSINIONING ADVISOR COGEN
Dec 2002 Shell Canada, Scotford Upgrader, Fort Saskatchewan, Alberta, Canada
Assisted in overseeing the Pre-commissioning and Start-up of the Shell Scotford Upgrader ATCO Cogeneration Power Plant. One gas-fired frame 7, 80MW generator and one steam turbine 70MW generator. Total capacity of 150 MW and 1057 GJ/hr heat.
May 2002 SENIOR PROCESS COMMISSINIONING ADVISOR NH3
Aug 2002 Kellogg Brown and Root, Caribbean Nitrogen, Point Lisas, Trinidad
Assisted in overseeing the Pre-commissioning and start-up of the Caribbean Nitrogen Company’s 2,040-t/day NH3 plant using KBR’s new KAAP technology. As the Senior Process Commissioning Advisor, I was responsible for the Pre-commissioning and Commissioning activities during daily operation.
Aug 2001 SENIOR PROCESS COMMISSINIONING ADVISOR
May 2002 Kellogg Brown and Root, Condor HBNS CPF Expansion Project, Hassi
Berkine, Algeria
Assisted in overseeing the Construction, Pre-commissioning and start-up of the KBRC HBNS Condensate Units on Trains 2, 3, & 4. As the Senior Process Commissioning Advisor, I was responsible for the Pre-commissioning and Commissioning activities during daily operation.
July 2000 PROJECT PRE-COMMISSIONING SUPERINTENDENT LAO
Aug 2001 Kellogg Brown and Root, BP Amoco Prairie Rose Project, Red Deer, Alberta, Canada
Assisted in overseeing the Construction, Pre-commissioning and start-up of BP Amoco’s LAO Prairie Rose Project. Facility produces Linier Alpha Olefins.
As the Pre-commissioning Superintendent, I was responsible for KBR’s and BP Amoco’s Operations group and KBR’s Pre-commissioning construction team.
Dec 1999 COMMISSIONING ENGINEER NH3
Apr 2000 Linde AG, Moura Australia (Queensland Nitrates PTY Ltd.)
Assisted in overseeing the Construction, Pre-commissioning and Start-up of QNP’s 230 t/day NH3 plant. Facility produces NH3, Ammonium Nitrates and Nitric Acid.
As the Commissioning Engineer, I was responsible for the Pre-commissioning and Commissioning of the Linde NH3 unit and training of the QNP Operations group.
Jun 1998 COMMISSIONING MANAGER
Nov 1999 Brown & Root, Mesaieed, Qatar
Overseen the Construction completion, Pre-commissioning and Commissioning of the Mesaieed Arab “D” Condensate Storage Facility. Responsible for the manpower, construction completion and commissioning of the units. Unit included two 350,000bl floating roof storage tanks, two 11kV Export pumps, two 450V Spiking pumps, TDC 3000 DCS system, Ship Loading SBM docking facility, 104 km of 12” pipeline, 7.2 km of 36” pipeline.
Sep 1997 SENIOR START-UP ADVISER / TECHNICAL TRAINER OLESTRA
May 1998 Proctor & Gamble, Ivory Dale, Cincinnati, Ohio, USA
Assisted in overseeing the Construction, Commissioning and Start-up of process equipment in P & G’s and the world’s first Olestra Plant. “Olean” Plant. The plant produces Olestra or Olean. Units include: Esters, Reaction, Refining and Bleaching, Evaporation and Stripping. I was responsible for verification of construction to design specifications. Training Proctor & Gambles technicians in plant operations, trouble shooting and preventative maintenance, writing of SOP’s and operating plant from a Honeywell TDC 3000 DCS system.
Jul 1994 COMMISSIONING / START UP SUPERVISOR / TRAINER / TECHNICAL
Jul 1997 MANAGER MTBE National Methanol Company, Ibn Sina, Jubail, Saudi Arabia
Assisted in construction, inspection, commissioning and start-up of Ibn Sina's 2000 tonne/day CD-Tech MTBE unit, UOP Isomerization unit and UOP Catofin dehydrogenation unit. Responsible for training of Saudi operators in all process areas including Honeywell TDC 3000 DCS system. Technical manager for the replacement of Foster Wheeler Superheater bundles 3 months duration. Construction and Commissioning of the New Berthing Unit at the King Fahd Port loading facility and qualified as Load Master and trainer.
Sep 1991 Commissioning / Start up Senior operator NH3/UREA
Jul 1994 Saskferco Products Inc., Belle Plaine, Saskatchewan, Canada
Assisted in commissioning and start-up of process equipment in Saskferco's 1,500 tonne / day Uhde NH3 plant and 2000 tonne / day Stamicarbon Urea plant. Worked all areas including Urea Panel.
Jun 1985 PROCESS OPERATOR NH3/UREA
Sep 1991 Canadian Fertilizers Ltd., Medicine Hat,
Alberta, Canada
NH3/Urea Panel Operator responsible for the safe and efficient operation of an 1800 tonne/day and 2 MW Kellogg 1000 tonne/day NH3 plants. Worked all areas including Panel.
Jan 1982- PROCESS OPERATOR NGL
Jun 1985 Gulf Canada Ltd., Rimbey, Alberta, Canada
Responsible for the safe and efficient operation of an NGL gas plant processing 120 million cubic feet of sour raw natural gas per day. Worked through all units including Panel.
EDUCATION
S.A.I.T., Calgary
Alberta, Canada
1988 POWER ENGINEERING, 2rd Class Inter-provincial
1981 POWER ENGINEERING, 3rd Class Inter-provincial
1980 POWER ENGINEERING, 4th Class Inter-provincial
· Advanced First Aid certificate.
· H2S Rescue certification.
· Cardiovascular Pulmonary Resuscitation.
· Workplace Hazardous Materials Information System (WHMIS).
· Confined Space Entry certification.
· Transportation of Dangerous Goods certification.
· ISO 9002 Quality Management certification.
· High Angle Rescue certification.
· Coxswain Course
· Bosiet Course
Honeywell TDC-2000 & 3000; Honeywell CMS, Yokogawa; Siemens S5/TXP; Westinghouse Ovation; Fisher Provox; Foxboro IA; Bailey Infi-90; Foxboro Spec 200; EMC; Fisher AC2; Taylor Mod III; Modicon PLC; Allen Bradley PLC; Triconex PLC; Loveland Systems; Tri-Sen Turbine Controls; Moore Programmable Controllers; Pyrotronics Fire and Gas Controls, Delta-V Systems.
.