RESUME
Post for applied : Production / Commissioning/Field Operator
P.MARIA PANEER SELVAN
Email-Id : 10/98E, Shanthi illam
: Radhapuram main Road,
: Vadakankulam post,
Mobile : +91- 9790124847 Tirunelveli Dt,
: +91- 8903925959 Tamilnadu - 627116
Tel : +91-4637230645 INDIA
OBJECTIVE:
Seeking a job to utilize my skills and abilities for the development of organization and professional growth of my career while being resourceful, innovative and flexible.
PERSONAL DETAILS :
Father’s Name : S.Paulraj
Date of Birth : 04.08.1969
Marital Status : Married
Sex : Male`
Nationality : Indian
Languages Known : English, Arabic, Hindi,Tamil & Malayalam
Education Qualification : Diploma in Mechanical Engineering
driving .l.no : TN72 V 20080000045 . Expiry Date : 03.08.2019
PASSPORT DETAILS:
Passport No : G 7354363
Issue Place : Trichy
Issue Date : 03.03.2008
Expiry Date : 02.03.2018
Status : ECNR
TECHNICAL BACKGROUND:
Ms Office 2000, 2003 & 2007, Ms Word, Excel, power point , Corel Draw, Photo Shop, Pagemaker etc.Pc Handling,Internet Access Etc
SEA SURVIVAL & TRAINING PROGRAMME ATTENDED:
Fire Prevention & Fire Fighting
Personal Safety & Social Responsibilities
Personal Survival Techniques
Elementary first aid
PROFESSIONAL EXPERIENCE IN OIL AND GAS FIELD:
Company / Position / Duration / LocationSPIE with TOTAL –
E & P, Onshore / Production Operator / 28th July 2010 to
1st Feb 2011 / Kharir,
YEMEN
BRUNEL with CAIRN ENERGY
Onshore / Commissioning Operator / 25.01.2010 to
20th July 2010 / MPT, Rajasthan,INDIA
Dietsmann with GNPOC, Onshore / Production Operator / 14.06.2008 to
04.11. 2009 / SUDAN
ISCO INTEGRAL SERVICES.W.L.L, for KNPC,Onshore / Field Operator / 25.11.2003 to 06.02.2008 / KUWAIT
AHI (Arab Heavy Industries)
OFFSHORE / Field Operator / 10.5.2000 to 15.06.2003 / DUBAI
U.A.E
S.S.Construction with ONGC,OFFSHORE
South field / Production Operator / 20.08.1996 to 25.10.1999 / MUMBAI, INDIA
OPERATIONAL SKILLS:
Crude Stabilization Unit
Well Testing, Compiling well test Report
Well Head Operation
X-Mas Tree Valve Operation
Control Panel Operation
Pig Launching & Receiving Operation
Centrifugal & Reciprocating Pump and Compressor Operation
Intervention / Water Injection Operation and Gas Injection
Daily Production //Chemical Calculation //Chemical operation//
MP steam & VRU compressor operation(Vapour Recovery Unit)
Shutdown & start up Jobs & Commissioning and Pre commissioning Activities
Gas Glycol Dehydration Unit
Condensate Fractionation Unit
Gas Sweetening Unit Fuel gas system
Sulphur Recovery Unit
Safety Equipment OperationKnowledgeinPermittoWorksystem
CapabilitytoleadateamofProduction/FieldoperatorsandWellheadoperators
FireandGasandProcesssystemParticular area bypassandresetphilosophyfor
maintenancerequirement
Utility Operation//Tank form operation
Mp steam operation & steam trap
EXPERIENCE IN PRE- COMMISSIONING// COMMISSIONING & STARTUP
Tracing the flow lines vesselsand make sure as per the P&ID
Punch list preparation and marking as per P& ID.
Flushing the flow lines with water
Blowing (Air drying) of the flow lines
Card board blasting of the lines.
Hydro testing of the flow lines.
Vessel cleaning & inspection.
Functional testing of the running equipment’s.
Purging of the flow lines with Nitrogen.
Chemical cleaning of the compressor section lines.
Mechanical no load test of the Compressor & Pumps.
Lube oil flushing of the compressor.
Following scope of work (SOW)and all kind of Work Permit Systems, Strictly and Carefully.
Stoke check of Esdv & control valves(CauseEffect)and communicatewith control room
Following Start-up and Shut-down Procedures as per Requirements
lock close & lock open as per operation
CRUDE STABILIZATION UNIT: PROCESS
Familiar with wellhead, oil chokes, HP, & LP separators (Three Phase). Dehydration Tank, Heat Exchangers, Demulsifier & Anti foam injection, other chemicals (Scale inhibitor, Corrosion Inhibitor, water Clarifier, DRA(drag reduce agent)oxygen scavenger, etc.) injection rate calculations, chemical injection pumps (Electrical and air drive) Desalting crude through electric desalters, Produced Water Tank, Skimmer Tank, Tilted plate Tank ,Gas boot, produced water flash drum, knock out drum, Pig launching and receiving ,foam, scraper, cup and intelligent preparation of daily production reports (Gas, oil & water), Well
Test Data entry, oil & gas calculation for GOR. Operation & Control of Roof Top intermediate Tanks (5000 M3 ), handling transfer pumps, booster pumps, Main pumps, current level of the tanks, Bottom oil transfer operation, water draining and operation of all motor operation valves at Crude Oil Pumping Station.
WELLHEAD OPERATION
Well head operation, well testing, wing valve, crown valve, upper & lower master valve,annulus valve, pull plug operation, well maintenance, hand over to wire line job SSSV operation, SSSV opened up & shutdown-hydraulic pump operation, floor line panel board operation, choke changing, well equalizing, work over, well completion, circulating valve operation, drain water pump operation, back pressure valve operation, gas lifting, water injection, chemical injection changeover familiar with startupshut down emergency procedure & troubleshooting etc….
GAS FIELD EXPERIENCE: GAS DEHYDRATION UNIT
The dehydration consists of two sections. 1. Dehydration section and 2 Glycol Regeneration section. Natural gas from HP. Test separator constitutes feed to Gas Dehydration system.Glycol purification, Glycol Regeneration, Natural Gas Dehydration (8 trays), Coalesce filter, Glycol Contactor, Glycol flash drum, Cartridge type filter operation, Lean/ Rich Glycol Heat Exchanger, All filter changing, Glycol Regeneration, Still Column, Glycol pumping, Tank Level, Dew point maintaining (khan Sensor). Taking of plant shutdown and start - up operation. Pre& super Heater’s for fuel gas. Heating& Heat Exchangers. Maintain the Reboiler Temperature (170 c). Fuel gas, stripping gas, pilot gas & Blanket gas Supply. Three way valve checking, Nacap Mixing, etc.
GAS SWEETENING UNIT:
Methyl Diethanol Amine (MDEA) is used to absorb the H2S from the sour gas. It consists of two sections; Absorption section is Amine Contactor and Amine regeneration section. Operation and control of the Absorber, Knock Out Drum, Heat Exchangers and maintain the MDEA temp. Control the level of rich amine flash drum, RichLean Amine exchanger, Regenerator, Control the lean amine flash drum, operation of vapor compressors and Reflux pumps
GAS COMPRESSION UNIT:
Handled different types of Gas Compressor(Reciprocation, Centrifugal& Screw Type) GasCompressor Start up& Shut down, Cylindrical lube oil Maintenance, Compressor unit pre lube oil level MTCE, Engine crankcase oil level maintenance, Coolant water level,RPM setting, inter collar operation,Temperature maintenance, Scrubber pump operation, Fuel gas Filter separator operation & Isolation, Recycle, PCV operation. Temperature logging Suction, Discharge valve leaking. Engine cylinder function. Cylinder fire order. Fuel gas splurging, Cooled water supply SDV & BDV operation. Trouble shooting, etc.
PROPANE COLUMN:
Propane Column Start up & Shut down Procedure , Propane Compressor operation,Propane Chilling Unit, Lube oil panel Operation, Accumulator Level maintenance, Pcv Function , Maintain the chiller level & Scrubber level, Maintain the Propane Temperature, Isolation, etc.
SULPHER RECOVERY UNIT:
Acid gas is coming from the sweetening unit to recover the Sulphur. Maintain the incinerator, knock out drums, oxidizer and absorber, adding catalytic reagents AR1310 and liquid Sulphur is transferred to Sulphur storage tank by transfer pumps.
DEWPOINT DEPRESSION UNIT:
The sweet and dehydrated gas is feeding the dew point depression unit in order to avoid condensation in the pipeline, so the heavy hydrocarbons need to be removed. It consists of two sections. Chill down section and Propane refrigeration section, Operation of the heat exchangers, Gas Chillers, Filter separators, Condensate transfer pumps, Propane compressors, knock out drums and Propane accumulators. Dispatch the gas at -2.5 deg. C.
CONDENSATE FRACTIONATION UNIT:
This is the gas expanding process, Feed gas supply, Feed gas cooling and drying, Feed gas chill down and separation, Lean gas compression and dispatch, Dryer regeneration, LPG Column, Refrigeration system, Fuel gas system, Control all of the dryers, Filters, Heat exchangers, Control and operation of LPG column reflux pump, LPG dispatch pumps, Expander and Compressor.
BOILER:
Fuel gas line operation. Burner ignition system operation. Temperature maintenance, LCV, PCV operation. Drainage PRV operation, Raw water sump operation, Chemical injection, Soft water tank operation, Boiler operation, Fuel gas line operation, Burner pilot operation etc…
GAS INJECTION UNIT:
Inject high pressure dehydrated gas into the well reservoir, Operation and maintenance of multistage gas compressors (Kawasaki cooper), Scrubbers, Inter Coolers, After Coolers, separators, Start up and shutdown operations of compressor at gas injection unit, control the dryers, pressurization/depressurization of the dryer, control the cool box, operations and maintenance of single state and expander, handling LPG dispatch centrifugal type compressors and NGL pumps.
WATER TREATMENT & WATER INJECTION PLANT:
To inject high-pressure water into well reservoir for maintaining the Reservoir level &pressure. Lube oil pump, Booster pump, sea water lifting pump, centrifugal & reciprocatingpump operation, Bactrocide coagulant, demulsifier, water clarifier, deformer, scale inhibiter all chemical calibration & dosing rateoperation.
UTILITIES:
Well experienced in utility operations such as Gas Turbine Generator, Utility & instrument Air Compressor, Centrifugal Pump, Piston Pumps, Water Treatment Plant, Produced Water Treatment Plant, Raw Water Treatment, sewage water and effluent treatment, cooling tower, chemical injection, And fire water pumps. Following first level maintenance, Issuing & handling the work permit, Directly involving startup /shutdown / isolation etc. calculating gas flows from Barton chart Preparing shift status reports to Supervisors & Good Operating Knowledge of computers and taking reading about the current status.
SAFETY:
H2S Safety, Fire safety, using crow can gas tester (CH4, H2S), fire Extinguisher (Foam, DCP & CO;) using in fire classification, fusible plug operation, deluge valve operation, fire water pump operation. Breathing Apparatus, Safety Jacket, Gas detector. Smoke detector, heat detector operation, H2S deduction, ultra violet systems, Fire eye deluge Valve System etc,
DECLARATION:
I hereby declare that the information furnished above is true to the best of my knowledge.
DATE : P.MARIA PANEER SELVAN